Backlog craft · cheat sheet Acceptance criteria and Given/When/Then The conditions an item must meet to do what the user needs, written so anyone can check them.
Common practice 6 steps Used by Product Owner, Project Manager
What it is Acceptance criteria are the specific, testable conditions something must meet to be accepted. They answer: how will we know this is done and right?
When to use it For every item before it is selected in Sprint Planning. Different from the Definition of Done, which applies to all items.
Why it works They remove ambiguity before work starts, give testers something to check, and stop arguments at the end about whether something is finished.
Do Five to eight criteria per item is usually plenty; more suggests the item should be split. Don't Confusing them with the Definition of Done. Writing them alone and handing them over. Step by step Write them before the work starts Together with the people who'll use and build it.
Make each one testable Yes or no, not “user-friendly”.
Cover the important cases The normal case, edge cases, errors and limits.
Keep them about the result What, not how it's built.
Use a clear format A simple list, or Given / When / Then: Given a situation, When something happens, Then this result.
Check them at the end Accept only when every criterion is met.
PreviewAcceptance criteria and Given/When/Then Backlog craft People must agree, before work starts, what “done and right” means. 6 Used by Product Owner, Project Manager Backlog craft · cheat sheet Definition of Ready (and its risk) A checklist some teams use for when an item is clear enough to bring into Sprint Planning.
Common practice 4 steps Used by Product Owner
What it is A checklist some teams use to decide when an item is clear enough to start: understood, small enough, with acceptance criteria and no blocking dependencies.
When to use it Optional. It can help a new team, but it is not part of Scrum and can turn into a gate that slows work.
Why it works Starting unclear work wastes time. A light checklist helps prepare items before they're planned.
Do Don't let it become a contract between teams; it's a helper, not a rule. Don't Becoming a contract between the Product Owner and Developers. Blocking valuable work because one box isn't ticked. Step by step Agree a short checklist For example: clear goal, acceptance criteria, sized, dependencies known.
Use it while preparing items Not as a gate that blocks everything.
Keep it light Five items at most.
Review it If items still arrive unclear, improve the checklist or the preparation.
PreviewDefinition of Ready (and its risk) Backlog craft Work keeps starting before it's clear enough. 4 Used by Product Owner Backlog craft · cheat sheet Spikes A short, timeboxed piece of research to reduce uncertainty before committing to a bigger item.
Common practice 5 steps Used by Product Owner
What it is A spike is a short, time-boxed piece of investigation to answer a question or reduce uncertainty before committing to the real work.
When to use it When the team can't estimate or plan an item because of a technical or product unknown.
Why it works Some work can't be estimated or planned until you learn something. A spike buys that knowledge cheaply instead of guessing.
Do A spike without a time box turns into a project. Don't Spikes that never end. Using spikes to avoid delivering anything usable. Step by step Write the question What exactly do we need to learn?
Set a time box Hours or a few days, not open-ended.
Define the output A decision, a small prototype, an estimate.
Do the investigation Only enough to answer the question.
Share and decide Use what you learned to plan the real work.
PreviewSpikes Backlog craft You can't plan or estimate something until you learn more. 5 Used by Product Owner Backlog craft · cheat sheet Story splitting Cut a big item into smaller ones that each still deliver something usable, top to bottom.
Common practice 5 steps Used by Product Owner
What it is Breaking a large piece of work into smaller pieces that each still deliver something usable, instead of splitting it into technical layers.
When to use it When an item is too big to finish in a Sprint, or when its estimate is very uncertain.
Why it works Small pieces finish sooner, give feedback earlier, and reduce risk. Splitting by value, not by layer, means each piece is useful on its own.
Do If a slice can't be shown working, it isn't a real slice. Don't Horizontal slices that deliver nothing usable until all are done. Step by step Start from the user's goal What does the whole item let someone do?
Look for split patterns By workflow step, by business rule, by data type, simple case first, by user type, by interface.
Check each piece delivers value Could a user or tester use it?
Do the most valuable or risky slice first Learn early.
Avoid splitting by layer “Database part” and “screen part” deliver nothing on their own.
PreviewStory splitting Backlog craft An item is too big to finish soon or deliver value early. 5 Used by Product Owner Backlog craft · cheat sheet User stories and INVEST Describe a need from the user's point of view, small enough to build, and good enough to start a conversation.
Common practice 6 steps Used by Product Owner
What it is A user story is a short description of something a user needs, written from their point of view: “As a [type of user], I want [something] so that [benefit]”. It's a placeholder for a conversation, not a full specification.
When to use it For most items that add something users can see. Not required by Scrum; any clear format works.
Why it works It keeps the focus on who benefits and why, rather than on technical tasks. The “so that” part helps the team find better solutions and decide what matters.
Do If you can't write the “so that”, question whether it's needed. Stories aren't the only format; use whatever keeps the user's need clear. Don't Writing technical tasks as stories (“As a database…”). Huge stories that fail the Small test. Skipping the “so that”: it is where the value is. Step by step Name a real user A specific type of user, not “the user” or “the system”.
Say what they need In their language, not technical terms.
Say why The benefit for them or the business.
Add acceptance criteria How you'll know it's done (see acceptance criteria).
Check it with INVEST Independent, Negotiable, Valuable, Estimable, Small, Testable.
Talk about it The story starts a conversation between the people who need it and the people who build it.
PreviewUser stories and INVEST Backlog craft You want work described from the user's point of view, with the why. 6 Used by Product Owner Backlog craft · cheat sheet User story mapping Lay out the user's journey left to right, with details underneath, then draw release lines across it.
Common practice 5 steps Used by Product Owner
What it is A story map lays out a user's journey from left to right (the main activities) and the details under each activity from top to bottom (most important first). Horizontal lines then cut releases across it.
When to use it At the start of a product or a big feature, to see the whole journey and plan the first useful release.
Why it works A flat list hides the big picture. The map shows the whole journey, helps spot gaps, and makes it easy to plan a first release that works end to end.
Do Build it with users or people who know them well. Don't Making the map once and never updating it. Step by step Write the user's main activities Left to right, in the order they happen.
Add steps and details under each Most important at the top.
Walk the journey Tell the story aloud to find missing steps.
Draw the first release line The thinnest set of items that lets a user complete the whole journey.
Add later release lines Each adds value on top.
PreviewUser story mapping Backlog craft A flat list hides the user's journey and the first usable release. 5 Used by Product Owner Closing and transition · cheat sheet Dress rehearsal A realistic trial of going live, with real people and pretend cases, to find problems before real users do.
Common practice 5 steps Used by Project Manager
What it is A realistic trial of going live, with real people and pretend cases, to find problems before real users do.
When to use it A week or two before going live, early enough to fix what it finds.
Why it works Problems found in a rehearsal are cheap to fix; problems found on go-live day hurt customers and reputation.
Do A rehearsal that finds nothing probably wasn't realistic. Don't Rehearsing too late to fix anything. Only easy cases, so nothing is found. Step by step Pick realistic cases Including awkward ones.
Use real people, systems and times As close to the real thing as possible.
Observe and note everything However small.
Give each finding an owner and a fix date Prioritise critical ones.
Re-test the critical fixes Before go-live.
PreviewDress rehearsal Closing and transition Something goes live soon and problems must be found first. 5 Used by Project Manager Closing and transition · cheat sheet Go or no-go review A meeting that decides whether to go live, based on an agreed readiness checklist rather than the announced date.
Common practice 5 steps Used by Project Manager
What it is A meeting that decides whether to go live, based on an agreed readiness checklist, not on the announced date.
When to use it Shortly before going live, after the rehearsal and the final checks.
Why it works It makes go-live a conscious decision with fallbacks, rather than momentum.
Do Decide who has the final say before the meeting. Don't Going live because the date was announced. Hidden “amber” items with no fallback. Step by step Agree criteria in advance And which are critical.
Review each item with its owner Green, amber, red.
Agree fallbacks For anything not fully ready.
Decide Go, go with fallbacks, or no-go.
Confirm the first days' support Who does what after go-live.
PreviewGo or no-go review Closing and transition The go-live date arrives and readiness must be decided on facts. 5 Used by Project Manager Closing and transition · cheat sheet Hypercare A short, planned period after going live where project and operations staff work side by side to fix teething problems quickly.
Common practice 5 steps Used by Project Manager
What it is A short, planned period after go-live where project and operations staff work side by side to fix teething problems fast.
When to use it The first weeks after going live.
Why it works The first days after go-live expose problems nobody predicted. Fast fixes protect users and the new team's confidence.
Do End it on the agreed date, or operations never fully own the result. Don't Disappearing on go-live day. Never ending it, so operations never take full ownership. Step by step Agree the length Often two to six weeks.
Place people where problems appear Front desk, systems, phones.
Log every issue Fix urgent ones the same day.
Hand lasting fixes to operations With documentation.
End on the agreed date Open items owned by operations.
PreviewHypercare Closing and transition Something has just gone live and teething problems will appear. 5 Used by Project Manager Coaching · cheat sheet Active listening Listening to understand, then showing you understood, before giving any view of your own.
Common practice 6 steps Used by Scrum Master, Project Manager
What it is Listening to fully understand: attention on the speaker, checking understanding, and reflecting back what you heard before responding.
When to use it In every coaching conversation, and when people are upset.
Why it works People who feel heard are more open to solutions. You also learn what the real issue is.
Do Agreeing isn't required; understanding is. Step by step Give full attention No phone, no preparing your answer.
Let them finish Don't interrupt.
Reflect back “So what I'm hearing is…”
Ask open questions To understand more.
Acknowledge feelings “That sounds frustrating.”
Only then respond With facts or proposals.
PreviewActive listening Coaching Someone is upset or a conversation keeps going round in circles. 6 Used by Scrum Master, Project Manager Coaching · cheat sheet Difficult conversations Talking openly and respectfully about a problem, such as performance or behaviour, by describing specific facts, listening to the other side, and agreeing a way forward.
Common practice 6 steps Used by Project Manager
What it is Talking openly and respectfully about a problem, such as performance or behaviour, using specific facts, listening to the other side, and agreeing a way forward.
When to use it As soon as a problem is noticed, privately.
Why it works Avoided problems grow. An early, fair conversation usually solves things before formal steps are needed, and keeps trust.
Do Separate the person from the behaviour. Follow HR guidance if things become formal. Don't Waiting until it's a crisis. Generalising (“you always…”). Step by step Prepare Specific facts, their impact, and the outcome you want.
Meet privately and soon Not by email.
Describe, don't judge “The plan was due Tuesday and arrived Friday”, not “you're unreliable”.
Ask and listen “What's getting in the way?”
Agree expectations and support Clear, specific, with dates.
Follow up Recognise improvement; escalate fairly if needed.
PreviewDifficult conversations Coaching Someone's work or behaviour needs to change and you must say so. 6 Used by Project Manager Coaching · cheat sheet GROW coaching model A simple structure for a coaching conversation that helps someone find their own way forward.
Common practice 5 steps Used by Scrum Master
What it is A simple coaching conversation structure: Goal (what do you want?), Reality (where are you now?), Options (what could you do?), Will (what will you do, and when?).
When to use it One-on-ones and moments when someone asks you to solve a problem they could solve themselves.
Why it works It helps people find their own solutions, which they own and act on, instead of being told what to do.
Do Ask more than you tell; resist giving the answer. Don't Hiding your own answer inside “coaching” questions. Step by step Goal Ask what they want from the conversation and beyond.
Reality Explore facts: what's happening, what's been tried.
Options Generate several options without judging.
Will Agree a specific next step, with a date.
Follow up Ask how it went next time.
PreviewGROW coaching model Coaching Someone needs to find their own way forward, not be told. 5 Used by Scrum Master Coaching · cheat sheet One-on-ones Regular short conversations with each person, to understand them and help them grow.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is Regular, private conversations between a lead and each team member about how they are, their work, obstacles and growth.
When to use it From the first week, and after hard moments like conflict.
Why it works Problems, ideas and concerns surface early when people have a regular, safe place to raise them.
Do Cancelling one-on-ones tells people they're not a priority. Don't Turning them into status updates or performance reviews. Step by step Set a rhythm Every one to two weeks, 20 to 30 minutes.
Let them own the agenda Their topics first.
Ask how they are Workload, energy, blockers.
Listen more than talk Take notes on commitments.
Follow up On what you promised.
PreviewOne-on-ones Coaching You want problems and ideas to surface early from each person. 5 Used by Scrum Master, Project Manager Coaching · cheat sheet Powerful questions Open questions that help people think, instead of telling them the answer.
Common practice 5 steps Used by Scrum Master
What it is Open questions that help people think more deeply: “What would success look like?”, “What's really stopping you?”, “What else could you try?”.
When to use it Whenever the team brings you a problem they could solve, or a decision belongs to someone else.
Why it works Good questions surface assumptions and options that advice would miss, and leave ownership with the other person.
Do Silence after a good question is useful; don't fill it. Don't Leading questions with only one right answer. Step by step Ask open questions What, how, what else; avoid yes/no.
Ask one at a time Then wait.
Follow the answer Build the next question on what you heard.
Avoid hidden advice “Have you thought about…?” is advice in disguise.
Close with action “What will you do next?”
PreviewPowerful questions Coaching You want people to think deeper instead of waiting for answers. 5 Used by Scrum Master Data and statistics · cheat sheet Attribute agreement analysis A check of whether people sorting items into categories (pass or fail, urgent or routine) agree with themselves, with each other and with the correct answer.
Common practice 6 steps Used by Process Improvement Specialist
What it is When people sort items into categories, attribute agreement analysis checks how consistently they do it: with themselves, with each other, and with the correct answer.
When to use it When data comes from people's judgements and categories decide what happens next.
Why it works Categories often decide what happens next. If people sort inconsistently, the data and the decisions built on it are unreliable.
Do Include the hard cases on purpose. Share the results as a team, not as individual scores. Don't Choosing only easy items. Blaming individuals when everyone disagrees on the same items. Not retesting after fixing the rules. Step by step Choose items 20 to 30, including borderline ones, with a known answer.
Sort twice Each person, blind, in a different order.
Count agreement Within, between, and with the standard.
Compare with the guide 90%+ good; under 80% act.
Find the hard items They show unclear rules.
Fix and retest
PreviewAttribute agreement analysis Data and statistics People sort items into categories and must agree how. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet Box plot A compact picture of a group of values: a box from the first to the third quartile, a line at the median, and whiskers to the extremes, ideal for comparing several groups side by side.
Common practice 5 steps Used by Process Improvement Specialist
What it is A box plot summarises a group with five numbers: the smallest value, the first quartile, the median, the third quartile and the largest value. Values far from the box are marked as possible outliers.
When to use it When comparing the centre and spread of several groups, such as days, shifts, machines or suppliers.
Why it works It makes differences in centre and spread between groups visible at a glance, before any test.
Do Always show how many values are in each group. Don't Hiding small groups: show the number of values. Reading the box as the full range. Step by step Sort
Quartiles and median
Box and line
Whiskers Up to 1.5 × box length.
Side by side
PreviewBox plot Data and statistics You compare the centre and spread of several groups. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Box-Cox transformation A method that finds the power (λ) to raise data to, to make it as close to normal as possible: λ = 1 no change, 0.5 square root, 0 logarithm, −1 reciprocal.
Common practice 6 steps Used by Process Improvement Specialist
What it is Box-Cox raises each value to a power λ (with λ = 0 meaning the logarithm) and chooses the λ that makes the data most normal.
When to use it When skewed data needs to be used with tools that assume normal data, such as capability indices, t-tests or regression.
Why it works Many tools assume normal data. A transformation lets you use them honestly on skewed data, such as times and costs.
Do Transform limits and targets with the same λ. Report results back on the original scale. Don't Forgetting to transform the limits as well. Trusting the transformed model without checking it against reality. Step by step Check data is positive
Find λ
Round it
Transform and recheck
Analyse
Check against reality
PreviewBox-Cox transformation Data and statistics Skewed data must be used with tools that assume normal data. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet C chart A control chart for the number of defects found when the same amount is inspected every period.
Common practice 5 steps Used by Process Improvement Specialist
What it is A C chart plots the number of defects in a fixed amount of work each period, with limits c̄ ± 3√c̄.
When to use it For counts of errors, faults or complaints in a fixed amount of work: per batch, per 1,000 lines, per day of a fixed volume.
Why it works It shows whether the defect count is stable, and flags unusual periods, when the amount checked never changes.
Do Keep the amount inspected exactly the same; otherwise use a U chart. Don't Using it when the amount inspected varies (use a U chart). Counting defective items instead of defects (use a P or NP chart). Step by step Fixed amount
Count defects
Centre c̄
Limits
Investigate
PreviewC chart Data and statistics You monitor defect counts in a fixed amount of work. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet CUSUM chart A chart that adds up how far each value is from the target, so small sustained shifts build up and show quickly.
Common practice 5 steps Used by Process Improvement Specialist
What it is A CUSUM chart adds up the differences between each value and the target, minus an allowance k. Small sustained shifts build up until they cross the decision limit h.
When to use it When small, lasting shifts matter and a standard chart would be slow to catch them.
Why it works Standard charts are slow to catch small shifts. CUSUM catches them several times faster.
Do Use it alongside a standard chart, which catches big sudden jumps faster. Don't Using it instead of, rather than alongside, a standard chart: it's slower to catch large sudden jumps. Step by step Target and σ
Choose k and h 0.5σ and 4σ to 5σ.
Upper and lower sums
Signal above h
Act and restart
PreviewCUSUM chart Data and statistics Small sustained shifts must be caught early. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Chi-square test A test of whether two category variables are linked, by comparing the counts in a table with the counts expected if they weren't.
Common practice 5 steps Used by Process Improvement Specialist
What it is The chi-square test checks whether two categorical variables are independent, by comparing observed counts with the counts expected if they were.
When to use it When both things are categories: band and outcome, region and complaint type, shift and defect type.
Why it works It tests links between categories in one step.
Do Look at which cells contribute most: they tell the story. Don't Using percentages instead of counts. Expected counts below 5 in many cells (combine categories). Step by step Table of counts
Expected counts Row × column ÷ total.
Cell contributions
Sum and degrees of freedom
p-value
PreviewChi-square test Data and statistics You test whether two sets of categories are linked. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Confidence interval A range that probably contains the true value for the whole population (for example the true average), worked out from a sample.
Common practice 5 steps Used by Process Improvement Specialist
What it is A confidence interval gives a range for the true value, worked out from a sample, with a stated level of confidence, usually 95%.
The central limit theorem explains why it works: averages of samples are close to normal, and their spread is s ÷ √n, even when single values are skewed.
When to use it Whenever you report an average or a share from a sample, and when deciding whether a sample is big enough.
Why it works A single number from a sample hides how uncertain it is. The interval shows it, and helps decide whether more data is needed.
Do Quadrupling the sample halves the margin. Report the interval, not just the average. Don't Reading a 95% interval as “95% of values fall in it”. Ignoring how the sample was chosen. Very small samples with skewed data. Step by step Mean and s
Standard error s ÷ √n.
t value 95%, n − 1 degrees of freedom.
Margin t × standard error.
Interval Mean ± margin.
PreviewConfidence interval Data and statistics You report an average or share from a sample. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Correlation and scatter plot A scatter plot shows pairs of values as points; the correlation coefficient r (from −1 to +1) measures how closely they follow a straight line.
Common practice 5 steps Used by Process Improvement Specialist
What it is A scatter plot shows pairs of values as points. The correlation coefficient r summarises how closely they follow a straight line: +1 perfectly rising, −1 perfectly falling, 0 no straight-line link.
When to use it When you suspect two measures move together, before building a model.
Why it works It's the quickest way to see whether a suspected cause moves with the result.
Do Always plot before calculating. r only measures straight-line links. Don't Calculating r without looking at the plot. Reading correlation as proof of cause. Missing a curved relationship that r understates. Step by step Pair the data
Plot
Look at the shape
Calculate r
Test it
PreviewCorrelation and scatter plot Data and statistics You suspect two measures move together. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Descriptive statistics A few numbers that describe a set of data: where it centres (mean, median, mode), how much it spreads (range, standard deviation, quartiles) and its shape.
Common practice 5 steps Used by Process Improvement Specialist
What it is Descriptive statistics summarise data: the centre (mean, median, mode), the spread (range, standard deviation, quartiles) and the shape.
When to use it Whenever you need to describe data, before comparing or testing anything.
Why it works They turn a long list of numbers into a picture anyone can follow, and they feed every later calculation.
Do When mean and median differ a lot, the data is skewed: report the median. Always give the number of values. Don't Reporting only the mean for skewed data. Mixing data from different periods or processes. Forgetting the units. Step by step Look at the data Sort it, plot it.
Centre Mean, median, mode.
Spread Range, standard deviation, quartiles.
Shape Mean versus median; histogram.
Report together
PreviewDescriptive statistics Data and statistics You need to describe a set of numbers simply and honestly. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Designed experiments A planned set of runs that varies several factors at once, in a set pattern, to find which factors matter, how they interact and the best settings.
Common practice 6 steps Used by Process Improvement Specialist
What it is A designed experiment varies several factors together in a planned pattern, so their effects and interactions can be measured from few runs.
When to use it When several settings could affect a result and may interact, and testing one at a time would take too long or miss interactions. An optional extra beyond the Green Belt essentials.
Why it works Changing one factor at a time is slow and can miss combinations that matter.
Do Randomise run order. Repeat runs if results vary a lot. Don't Changing one factor at a time, which misses interactions. Not randomising the run order. Step by step Choose result and factors
Two levels each
Run all combinations Random order.
Effects
Interactions
Confirm
PreviewDesigned experiments Data and statistics Several settings may interact and you need the best combination. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet EWMA chart A chart of a weighted average that gives most weight to recent values and less to older ones, which smooths noise and shows small shifts.
Common practice 4 steps Used by Process Improvement Specialist
What it is An EWMA chart plots a weighted average where each new value counts for λ and the previous average for 1 − λ, so old values fade gradually.
When to use it When you want to detect small shifts, or the data is noisy or slightly skewed.
Why it works It smooths noise and reveals small shifts, and copes better than individuals charts with slightly skewed data.
Do λ between 0.1 and 0.3 suits most uses. Don't Choosing λ too large (close to an ordinary chart) or too small (slow to react). Step by step Choose λ Often 0.2.
Update the EWMA daily
Limits
Investigate
PreviewEWMA chart Data and statistics You want a smoothed chart that shows small shifts. 4 Used by Process Improvement Specialist Data and statistics · cheat sheet Friedman test A test of whether several treatments differ when each block (a week, a person, a machine) gets all of them, comparing ranks within each block.
Common practice 4 steps Used by Process Improvement Specialist
What it is The Friedman test compares several conditions measured in the same blocks, by ranking within each block and comparing the rank totals.
When to use it When the same blocks are measured under every condition, and the data isn't normal.
Why it works It removes block-to-block differences and doesn't need normal data.
Do Use it whenever the same blocks appear in every column. Don't Treating the values as independent and using Kruskal-Wallis instead. Step by step One row per block
Rank within rows
Rank sums per condition
Statistic and p-value
PreviewFriedman test Data and statistics The same blocks are measured under several conditions. 4 Used by Process Improvement Specialist Data and statistics · cheat sheet Histogram A bar chart of how many values fall into each range, showing the shape of the data: its centre, spread, skew and any second peak.
Common practice 5 steps Used by Process Improvement Specialist
What it is A histogram groups values into equal ranges and shows how many fall into each, as touching bars.
When to use it When you want to see how values are distributed, compare them with a limit, or check the shape before choosing tools.
Why it works It shows the shape of data at a glance: centre, spread, skew, outliers and two-peak patterns that point to mixed processes.
Do Two peaks usually mean two processes mixed together: separate them. Draw limits on it: it shows how much falls outside. Don't Too few or too many bins. Unequal bin widths. Drawing it for data that changes over time without also plotting it in time order. Step by step Choose bins Equal widths, often 6 to 12.
Count Values in each bin.
Draw Touching bars.
Add limits Targets or requirement limits.
Read the shape
PreviewHistogram Data and statistics You want to see the shape and spread of your data. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Hypothesis testing A way of deciding whether a difference seen in data is real or could be chance, by assuming there is no difference and checking how surprising the data would be.
Common practice 6 steps Used by Process Improvement Specialist
What it is A hypothesis test assumes nothing is going on (the null hypothesis, H0) and asks how surprising the data would be if that were true. The p-value is that chance.
Two risks: alpha, a false alarm (rejecting a true H0), usually 5%; beta, missing a real difference. Power = 1 − beta, usually aimed at 80%.
When to use it Whenever a decision depends on whether a difference or a link is real: comparing groups, before and after, against a target.
Why it works It stops teams acting on differences that are just noise, and from dismissing real ones.
Do Decide the test before seeing the data. p above 0.05 means “not shown”, not “no difference”. Don't Choosing the test after seeing the results. Treating p above 0.05 as proof of no difference. Ignoring practical significance with large samples. Step by step Practical question
H0 and H1
Alpha and sample size For enough power.
Choose the test See the table below.
Check assumptions
Decide p-value and practical size.
PreviewHypothesis testing Data and statistics A decision depends on whether a difference is real or chance. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet I-MR chart A pair of control charts for single measurements over time: one for the values, one for the change from each value to the next.
Common practice 6 steps Used by Process Improvement Specialist
What it is An I-MR chart plots single values and the moving range (the change from one value to the next). The moving range estimates the normal short-term variation.
When to use it When there is one value per period: daily averages, weekly totals, monthly figures, or slow or costly measurements.
Why it works Many measures come one at a time: daily, weekly, monthly. This chart tells normal ups and downs from real change.
Do Rules: a point outside, 8 in a row on one side, 6 rising or falling. Don't Reacting to points inside the limits. Very skewed data: transform it or use other charts. Step by step 20+ values
Moving ranges
Centre lines
Limits Average ± 2.66 × MR̄.
MR limit 3.267 × MR̄.
Read with rules
PreviewI-MR chart Data and statistics You monitor one value per period. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet Kruskal-Wallis test A test of whether three or more independent groups differ, using ranks instead of averages: the rank-based version of one-way ANOVA.
Common practice 4 steps Used by Process Improvement Specialist
What it is Kruskal-Wallis ranks all values from several groups together and tests whether the groups' average ranks differ.
When to use it When comparing several groups with skewed or ordinal data.
Why it works It's the ANOVA alternative for skewed data.
Do Box plots show which group differs. Don't Using it on related groups (use Friedman). Forgetting to say which group is different. Step by step Rank all
Average rank per group
H statistic
p-value Chi-square, groups − 1.
PreviewKruskal-Wallis test Data and statistics You compare several groups and the data isn't normal. 4 Used by Process Improvement Specialist Data and statistics · cheat sheet Mann-Whitney test A test of whether two independent groups differ, using the ranks of all values instead of their averages.
Common practice 4 steps Used by Process Improvement Specialist
What it is The Mann-Whitney test ranks all values from two groups together and checks whether one group's ranks are generally higher.
When to use it When comparing two groups with skewed data, small samples or ordinal data.
Why it works It compares two groups without assuming normal data.
Do Report medians alongside the p-value. Don't Using it on paired data (use Wilcoxon on the differences). Assuming it compares medians when the groups' shapes are very different. Step by step Rank all together
Rank sums
U statistic
p-value
PreviewMann-Whitney test Data and statistics You compare two groups and the data isn't normal. 4 Used by Process Improvement Specialist Data and statistics · cheat sheet Measurement system analysis Checking how much of the variation in your data comes from the measuring itself (the tool, the method, the people), before trusting the data.
Common practice 6 steps Used by Process Improvement Specialist
What it is Every measurement contains some error. Measurement system analysis finds out how much, and where it comes from: the method itself (repeatability) or differences between people (reproducibility).
It also covers accuracy: whether measurements are right on average (bias), whether that holds across the range (linearity) and over time (stability).
When to use it Before using data to make decisions, especially when people measure or judge by hand.
Variations Attribute agreement analysis The same idea for categories, such as pass or fail.Bias study Measuring a known standard many times to see whether results are right on average.Why it works If the measuring adds a lot of variation, you can chase causes that are really measurement errors, or miss real changes.
Do Choose items that differ as much as real ones do. Hide the item labels so people can't remember their first result. Don't Skipping it because the tool is new or digital. Testing items that are all alike, which hides the error. Letting people see their earlier results. Step by step Pick items Covering the normal range, often 10.
Measure repeatedly 2 or 3 people, 2 or 3 times each, blind, in random order.
Repeatability Spread within each person.
Reproducibility Differences between people.
Compare with total variation Gauge share of total.
Judge against purpose Under 10% good; 10 to 30% may be acceptable; over 30% fix it.
PreviewMeasurement system analysis Data and statistics You need to know whether your measurements can be trusted. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet Mood's median test A test of whether several groups have the same median, by counting how many values in each group fall above or below the overall median.
Common practice 4 steps Used by Process Improvement Specialist
What it is Mood's median test counts, for each group, how many values are above and at or below the overall median, then runs a chi-square test on those counts.
When to use it With skewed data that has extreme values, where even ranks might mislead.
Why it works Very robust: extreme values can't distort it.
Do Useful when a few values are wildly extreme. Don't Low power with small groups: it uses little information. Step by step Overall median
Count above and below Per group.
Chi-square on the table
p-value
PreviewMood's median test Data and statistics You compare medians of several groups with extreme values. 4 Used by Process Improvement Specialist Data and statistics · cheat sheet Multi-vari analysis Grouping data by possible sources of variation (time, place, person, product) and comparing them, to see which family causes most of the variation.
Common practice 5 steps Used by Process Improvement Specialist
What it is Multi-vari analysis splits variation into families, such as within one item, between items, over time, between people or places, and compares how much each family contributes.
When to use it Early in Analyse, when results vary a lot and you need to know where to look.
Why it works It narrows the search for causes quickly, often before any formal test.
Do Choose families before collecting data, so the data records them. Use it to choose what to test, not as proof. Don't Collecting data that doesn't record the families. Stopping at the chart without testing. Forgetting the variation within groups. Step by step List families Time, place, person, item.
Collect data Recording each family.
Average each group
Compare ranges Of group averages per family.
Pick the biggest Then test it.
PreviewMulti-vari analysis Data and statistics Results vary a lot and you need to know where to look first. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Multiple and non-linear regression Models with several inputs (y = b0 + b1 × x1 + b2 × x2 …) or a curved shape (for example y = b0 + b1 × x + b2 × x²), to explain and predict a result from its causes.
Common practice 6 steps Used by Process Improvement Specialist
What it is Multiple regression fits a result to several inputs at once, so each input's effect is measured while the others are held constant.
Non-linear (curved) regression adds terms such as x² when the data bends.
When to use it When several causes act together, or a straight line doesn't match the shape of the data.
Why it works Real results usually have several causes, and some relationships curve. Modelling them properly gives honest predictions.
Do Use roughly 10 or more data points for each input. If two inputs are strongly correlated with each other, keep one. Don't Too many inputs for the amount of data. Inputs that measure the same thing (they confuse each other). Extrapolating a curve. Step by step Choose inputs
Fit
Check each input
Adjusted R²
Residuals
Predict inside the range
PreviewMultiple and non-linear regression Data and statistics Several causes act together, or a straight line doesn't fit. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet NP chart A control chart for the number of items that fail a check, when the same number is checked every period.
Common practice 5 steps Used by Process Improvement Specialist
What it is An NP chart plots the number failing each period, when the same number is checked every time.
When to use it For yes-or-no outcomes with a constant sample size, where counts are easier to read than shares.
Why it works Counts are easier for teams to read than shares.
Do Keep n exactly the same every period. Don't Using it when the sample size changes (use a P chart). Step by step Fixed n
Count failing
Centre np̄
Limits
Investigate
PreviewNP chart Data and statistics You monitor the number failing a check, with a fixed sample size. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Normality test A test and a plot that check whether data fits the bell-shaped normal distribution, which many statistical tools assume.
Common practice 5 steps Used by Process Improvement Specialist
What it is A normality test checks whether data could come from a normal (bell-shaped) distribution. A normal probability plot shows the same thing visually: normal data falls along a straight line.
When to use it Before using tools that assume normal data: capability indices, t-tests, ANOVA, some control charts.
Why it works Many tools assume normal data. Using them on very skewed data can give badly wrong answers.
Do Always look at the plot: the p-value alone doesn't say how the data differs. Two groups mixed together can look non-normal: check for that first. Don't Deleting “outliers” to pass the test. Reading a high p-value as proof of normality. Testing huge samples, where tiny differences give low p-values. Step by step Plot Histogram and probability plot.
Test Anderson-Darling is common.
Read the p-value Below 0.05: probably not normal.
See how Skew, tail, two groups.
Choose tools That suit the data, or transform.
PreviewNormality test Data and statistics A tool you plan to use assumes bell-shaped data. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet One-sample Wilcoxon test A test of whether the median differs from a target that uses both the direction and the size of each value's distance from it, through ranks.
Common practice 4 steps Used by Process Improvement Specialist
What it is The one-sample Wilcoxon signed-rank test compares the median with a target using both the sign and the rank of each distance from it.
When to use it With continuous data that isn't normal but is roughly symmetrical around its median.
Why it works More powerful than the sign test, without assuming normal data.
Do Check the data is roughly symmetrical around the median. Don't Using it on very asymmetrical data, where the sign test is safer. Step by step Differences from target Drop zeros.
Rank absolute differences
Sum positive ranks
p-value
PreviewOne-sample Wilcoxon test Data and statistics You test a median with skewed but roughly symmetrical data. 4 Used by Process Improvement Specialist Data and statistics · cheat sheet One-sample sign test A simple test of whether the median differs from a target, using only whether each value is above or below it.
Common practice 3 steps Used by Process Improvement Specialist
What it is The sign test checks whether the median differs from a target by counting values above and below it. If the median were the target, each value would be equally likely to fall either side.
When to use it With very skewed data, ordinal data such as ratings, or when only the direction of each value can be trusted.
Why it works It makes almost no assumptions, so it works on very skewed or ordinal data.
Do Use it when only direction can be trusted. Don't Using it when distances are meaningful: it throws that information away and has low power. Step by step Count above and below Drop ties.
Binomial p-value
Decide
PreviewOne-sample sign test Data and statistics You test a median and only the direction of values can be trusted. 3 Used by Process Improvement Specialist Data and statistics · cheat sheet One-way ANOVA A test of whether the averages of three or more groups differ, by comparing the variation between groups with the variation within them.
Common practice 6 steps Used by Process Improvement Specialist
What it is One-way ANOVA tests whether three or more group averages differ, by comparing variation between groups with variation within them (the F ratio).
When to use it When comparing the averages of several groups at once, such as days, teams, machines or suppliers.
Why it works One test instead of many keeps the false-alarm risk at 5%.
Do Plot the groups as box plots first. If p is small, look at which group's average is out of line. Don't Running many t-tests instead. Ignoring very unequal spreads. Stopping at “they differ” without finding which. Step by step Check assumptions Normality, equal spreads.
Between mean square
Within mean square
F = between ÷ within
p-value
Find which differ
PreviewOne-way ANOVA Data and statistics You compare the averages of three or more groups. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet Operational definition An exact description of what is measured, how, from when to when, and in what units, so anyone measuring gets the same result.
Common practice 6 steps Used by Process Improvement Specialist
What it is An operational definition says exactly what is measured and how: start and end, units, rounding, what counts, data source and who records it.
When to use it Before collecting any data, and whenever people argue about what a number means.
Why it works Without one, people measure the same thing differently and the data can't be compared or trusted.
Do Write borderline cases in: they're where definitions break. Keep the definition with the data, always. Don't Definitions that sound clear but leave edges open (“waiting time”). Changing the definition halfway through. Different teams using different definitions for the same name. Step by step Name the measure
Start and stop Exactly when.
Units and rounding
What counts With borderline examples.
Source and recorder
Test it Two people, same records.
PreviewOperational definition Data and statistics People measure the same thing in different ways. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet P chart A control chart for the share of items that fail a check, when the number checked can change from one period to the next.
Common practice 5 steps Used by Process Improvement Specialist
What it is A P chart plots the share of items failing a check each period, with limits that depend on how many were checked.
When to use it For yes-or-no outcomes with varying sample sizes: share late, share defective, share not offered in time.
Why it works It shows whether a yes-or-no process is stable, and flags unusual periods, even when volumes change.
Do Make sure the definition of failing doesn't change. Don't Using one fixed limit when n changes a lot. Very small n with rare defects, where limits are meaningless. Step by step Record n and failures
Shares
Centre p̄
Limits per period
Investigate
PreviewP chart Data and statistics You monitor the share failing a check, with varying volumes. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Paired t-test A test of whether the average change is real when the same items are measured twice, before and after, by working on the differences.
Common practice 5 steps Used by Process Improvement Specialist
What it is A paired t-test compares two measurements on the same items by testing whether the average difference is zero.
When to use it When the same people, machines or items are measured under two conditions, such as before and after training.
Why it works Each item acts as its own control, removing differences between items, so real changes show more clearly than with a two-sample test.
Do Check the differences, not the raw values, for normality. Don't Using a two-sample test on paired data, which loses power. Ignoring very skewed differences (use Wilcoxon). Step by step Pair
Differences
Average and spread
t statistic
p-value and interval
PreviewPaired t-test Data and statistics The same items are measured before and after a change. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Probability distributions Mathematical patterns that describe how data behaves: normal for many measurements, binomial for yes-or-no out of a fixed number, Poisson for counts in a period, exponential for times between events.
Common practice 5 steps Used by Process Improvement Specialist
What it is A probability distribution describes how likely each value is. Four cover most improvement work: normal (measurements), binomial (yes-or-no out of a fixed number), Poisson (counts in a period) and exponential (time between random events).
When to use it When you need the chance of an event, to tell normal variation from a real signal, or to choose the right chart or test.
Why it works Knowing the distribution tells you what normal variation looks like, which charts and tests fit, and how likely an event is by chance.
Do Binomial: independent tries, same chance each time. Poisson: events independent, constant average rate. Don't Assuming everything is normal. Using a distribution whose conditions don't hold (for example events that aren't independent). Step by step Identify the data type
Pick the distribution
Estimate inputs
Calculate
Check against reality
PreviewProbability distributions Data and statistics You need the chance of an event or to know what normal variation looks like. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Process capability Measures of how well a stable process meets its requirement limits: the share outside the limits, capability indices and the sigma level.
Common practice 6 steps Used by Process Improvement Specialist
What it is Process capability compares what a stable process produces with what the customer requires.
Cp and Pp compare the width of the requirement limits with the spread. Cpk and Ppk also account for where the process is centred. Cp and Cpk use short-term variation; Pp and Ppk use the overall variation.
When to use it When you need to know whether a process can meet a customer requirement, as a baseline and after improvement.
Variations Attribute capability For yes-or-no data: the share defective, converted to defects per million and a sigma level.Non-normal capability Use the observed share outside, fit a suitable distribution, or transform the data first.Why it works It answers the question every sponsor asks: can this process meet the requirement, and how often does it fail?
Do Rough guide: Cpk 1.33 or more is often required in manufacturing; below 1 means regular failures. Always say what share is outside the limits: it's what people understand. Don't Calculating capability on an unstable process. Using normal-based indices on very skewed data without checking against the observed share. Confusing short-term (Cp, Cpk) and long-term (Pp, Ppk) figures. Step by step Check stability Run chart or control chart.
Check shape Normal or not.
Observed share outside Count it.
Index Cpk or Ppk = (nearest limit − mean) ÷ (3 × s).
Convert Parts per million, sigma level.
Explain in plain words
PreviewProcess capability Data and statistics You need to know how well a process meets its requirement. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet Proportion tests Tests for yes-or-no data: whether a share differs from a benchmark (one-proportion), or whether two groups' shares differ (two-proportion).
Common practice 4 steps Used by Process Improvement Specialist
What it is Proportion tests compare shares of yes-or-no outcomes, either with a benchmark or between two groups, using the normal approximation.
When to use it With pass or fail, attended or missed, complaint or not, and similar data.
Why it works Much improvement data is yes or no: defective or not, on time or late, attended or missed.
Do Yes-or-no data needs larger samples than measured data. Don't Small samples where the normal approximation fails (use an exact test). Reading a link between groups as proof of cause. Step by step Shares
z statistic
p-value
Report the difference In percentage points.
PreviewProportion tests Data and statistics You compare shares of yes-or-no outcomes. 4 Used by Process Improvement Specialist Data and statistics · cheat sheet Sample size and power Working out how much data is needed to estimate something precisely enough, or to give a test a good chance of detecting a difference that matters.
Common practice 5 steps Used by Process Improvement Specialist
What it is Sample size is how much data you need. Power is the chance a test detects a real difference of a given size. Too little data gives low power: real effects get missed.
When to use it Before collecting data for an estimate or a comparison, and when a test comes back “not significant”.
Why it works It avoids both wasted effort (too much data) and false comfort (too little).
Do Halving the difference you want to detect needs four times the data. Don't Guessing the spread. Running a test with too little data, then reading “not significant” as “no difference”. Step by step Agree what matters Precision or difference.
Estimate the spread
Choose alpha and power
Calculate
Round up
PreviewSample size and power Data and statistics You plan how much data an estimate or test needs. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Sampling methods Ways of choosing which items to measure so the sample represents the whole: random, stratified, systematic and cluster sampling.
Common practice 5 steps Used by Process Improvement Specialist
What it is Sampling means measuring part of a population to learn about all of it. The method decides whether the sample can be trusted.
When to use it Whenever measuring everything is too slow or costly, which is most of the time.
Why it works A well-chosen sample of 60 can tell you more, faster and cheaper, than a badly chosen sample of 6,000.
Do Write down the method before collecting. Avoid samples chosen by whoever is available. Don't Convenience samples: the easiest or most memorable items. Systematic samples that line up with a pattern (every 7th day is always a Monday). Sampling from a period when the process changed. Step by step Define the population Items and period.
Choose a method Random, stratified, systematic or cluster.
Size it From the precision needed.
Pick before measuring
Record how
PreviewSampling methods Data and statistics Measuring everything is too slow, and the sample must be trustworthy. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Simple linear regression A straight-line model of how a result (y) changes with one input (x): y = b0 + b1 × x, fitted to the data, used to understand and predict.
Common practice 6 steps Used by Process Improvement Specialist
What it is Simple linear regression fits the straight line y = b0 + b1 × x that best matches the data (least squares). The slope b1 says how much y changes for each unit of x.
When to use it When one input seems to drive a result and you want to know by how much, and to predict.
Why it works It turns “these go together” into “this much change in x gives this much change in y”, which is what decisions need.
Do Look at a plot of residuals against predicted values: it should look like random scatter. Don't Predicting far outside the data. Ignoring a pattern in the residuals. Treating R² as the only test of a good model. Step by step Plot
Fit
Slope and p-value
R²
Residuals
Predict with an interval
PreviewSimple linear regression Data and statistics You want to know how much one input moves a result, and predict it. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet Six Sigma metrics Ways of counting defects that make processes comparable: defects per unit, defects per million opportunities, first-time yield, rolled throughput yield and the sigma level.
Common practice 5 steps Used by Process Improvement Specialist
What it is Six Sigma metrics count defects in a way that allows comparison between very different processes. A unit is one item (an invoice, a request); a defect is any failure to meet a requirement; an opportunity is one place a defect could happen.
When to use it When sizing a problem at the start of a project, and to compare performance before and after.
Why it works They size the problem at the start, set a baseline, and show improvement in a common language.
Do Write the defect and opportunity definitions down before counting. Don't Inflating opportunities so the process looks better. Comparing sigma levels built on different defect definitions. Step by step Define unit, defect, opportunity
Defects per unit
Per million opportunities
Yields First-time and rolled throughput.
Sigma level Normal value + 1.5.
PreviewSix Sigma metrics Data and statistics You need to size a defect problem in a common language. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Tests for equal variances Tests that compare spreads: two groups (F-test), several groups (Levene's test, which doesn't need normal data), or one group against a target spread (chi-square test for variance).
Common practice 4 steps Used by Process Improvement Specialist
What it is Tests that compare spreads instead of averages: the F-test for two normal groups, Levene's test for two or more groups of any shape, and the chi-square test for one group against a target spread.
When to use it Before a two-sample t-test or ANOVA, and whenever consistency itself is the question (is one process more variable than another?).
Why it works Spread is often what customers feel. These tests also decide which version of a t-test or ANOVA to use.
Do Use Levene's test when data isn't normal. Don't Using the F-test on clearly non-normal data (use Levene's). Forgetting that reducing variation is often the real goal. Step by step Choose the test
Calculate F, Levene or chi-square.
p-value
Decide
PreviewTests for equal variances Data and statistics You need to know whether spreads differ, or before a t-test or ANOVA. 4 Used by Process Improvement Specialist Data and statistics · cheat sheet U chart A control chart for the number of defects per unit, when one unit can have several defects and the number of units checked varies. With a constant amount checked, the C chart charts the count directly.
Common practice 5 steps Used by Process Improvement Specialist
What it is A U chart plots defects per unit when units can have several defects and the number of units varies. A C chart plots the count when the amount checked is constant.
When to use it For counts of errors, faults or complaints, where several can occur on one item.
Why it works Some quality problems are counts of defects, not yes or no.
Do Use a Pareto of defect types to choose what to fix next. Don't Using a P chart when items can have several defects. Changing what counts as a defect midway. Step by step Units and defects
Rate
Centre ū
Limits per period
C chart c̄ ± 3√c̄.
PreviewU chart Data and statistics You monitor defects per unit where items can have several. 5 Used by Process Improvement Specialist Data and statistics · cheat sheet Xbar-R chart A pair of control charts for measured data collected in small subgroups (usually 2 to 9): one for the subgroup averages, one for their ranges.
Common practice 6 steps Used by Process Improvement Specialist
What it is An Xbar-R chart tracks a process with small subgroups: the averages show where the process is centred, the ranges how much it varies within each subgroup.
When to use it When you can take several measurements under the same conditions at regular intervals, such as 5 items an hour.
Why it works It separates normal variation from real changes, so people react only when something has really changed.
Do Constants for n = 2 to 9: A2 1.880, 1.023, 0.729, 0.577, 0.483, 0.419, 0.373, 0.337; D4 3.267, 2.574, 2.282, 2.114, 2.004, 1.924, 1.864, 1.816. Don't Subgroups that mix different conditions, which inflates the range and hides signals. Recalculating limits after every point. Step by step 20+ subgroups
Averages and ranges
Centre lines
Range limits D3, D4 × R̄.
Average limits X̿ ± A2 × R̄.
Read ranges first
PreviewXbar-R chart Data and statistics You monitor measured data in small subgroups. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet Xbar-S chart A pair of control charts for measured data in larger subgroups (10 or more): one for the subgroup averages, one for their standard deviations.
Common practice 6 steps Used by Process Improvement Specialist
What it is An Xbar-S chart is like Xbar-R but uses each subgroup's standard deviation, which measures spread better when subgroups are large.
When to use it When subgroups have 10 or more items, or vary in size.
Why it works With 10 or more items, the range only uses two of them; the standard deviation uses all.
Do Use it for subgroups of 10 or more. Don't Using it for small subgroups, where the range works as well and is simpler. Step by step Subgroups
Averages and s
Centre lines
S limits B3, B4 × s̄.
Average limits X̿ ± A3 × s̄.
Read S first
PreviewXbar-S chart Data and statistics You monitor measured data in subgroups of 10 or more. 6 Used by Process Improvement Specialist Data and statistics · cheat sheet t-test A test that compares averages: one average against a target (one-sample), two independent groups (two-sample), or the same items before and after (paired).
Common practice 5 steps Used by Process Improvement Specialist
What it is A t-test compares averages using the t distribution, which allows for the uncertainty of estimating the spread from a sample.
When to use it With continuous data that is roughly normal, or samples large enough for the central limit theorem to help.
Why it works It's the standard test for comparing averages of measured data.
Do For paired data, test the differences with a one-sample t-test. If spreads differ, use the unequal-variances version. Don't Using a two-sample test on paired data. Ignoring very different spreads. Small, very skewed samples. Step by step Choose the version
Check assumptions Normality, equal spreads.
t = difference ÷ standard error
p-value From t and degrees of freedom.
Report Difference and interval.
Previewt-test Data and statistics You compare averages of measured data. 5 Used by Process Improvement Specialist Discovery and evidence · cheat sheet Customer interviews Short conversations with real users about their past behaviour, to understand their problems.
Common practice 6 steps Used by Product Owner, Process Improvement Specialist
What it is Short, structured conversations with real users to understand their needs, problems and behaviour, before deciding what to build or change.
When to use it Before deciding what to build, and whenever data shows a problem you don't understand.
Why it works Assumptions about users are often wrong. Hearing them describe real situations shows what actually matters.
Do Don't pitch your idea in the interview; you'll hear politeness, not truth. Don't Asking leading questions. Treating one loud customer as everyone. Step by step Decide what you want to learn Two or three questions, not a feature list.
Find the right people Real or likely users, a mix of types. Five to eight interviews often reveal the main patterns.
Ask about past behaviour “Tell me about the last time you…” rather than “Would you use…?”
Listen more than you talk Follow up with “why?” and “what happened next?”
Take notes, then look for patterns Group findings across interviews.
Turn findings into decisions What will you change because of what you heard?
PreviewCustomer interviews Discovery and evidence You're unsure what users really need or why they behave as they do. 6 Used by Product Owner, Process Improvement Specialist Discovery and evidence · cheat sheet Evidence-Based Management measures Look at value from four sides: value today, value still possible, how fast you deliver, and how able you are to change.
Evidence-Based Management Guide 5 steps Used by Product Owner
What it is Evidence-Based Management (EBM) is a framework from Scrum.org for measuring the value a product delivers, using four key areas: current value, unrealised value, time to market and ability to innovate.
When to use it When reporting value to sponsors, beyond this week's numbers.
Why it works It moves the conversation from “how busy are we?” to “are we delivering value, and could we deliver more?”.
Do Explained in our own words; see the official EBM Guide from Scrum.org for the full framework. Don't Measuring output (features shipped) and calling it value. Step by step Pick measures for each area Current value (e.g. satisfaction), unrealised value (e.g. demand not met), time to market (e.g. lead time), ability to innovate (e.g. time spent on new work).
Set goals A strategic goal, intermediate goals and immediate tactical goals.
Measure regularly Look at trends.
Run small experiments Try changes and see how the measures move.
Adapt Keep what works, drop what doesn't.
PreviewEvidence-Based Management measures Discovery and evidence You want to know if a product delivers value, not just output. 5 Used by Product Owner Discovery and evidence · cheat sheet Hypotheses and experiments Turn an idea into a testable statement, then run the smallest experiment that shows if it's true.
Common practice 5 steps Used by Product Owner
What it is Writing an idea as a testable statement (“we believe X will cause Y, measured by Z”) and running a small experiment to check it before investing more.
When to use it When you aren't sure an idea will create value, and being wrong would be expensive.
Why it works It turns opinions into evidence and limits the cost of being wrong.
Do Decide the success measure before you see the data. Don't Moving the success line after seeing the result. Experiments too small to learn from. Step by step Write the hypothesis We believe [change] will lead to [result] for [who]. We'll know when [measure] reaches [target].
Design the smallest experiment A prototype, a test page, a pilot with a few users.
Decide the measure and the time Before you start, so you can't move the goalposts.
Run it Keep everything else as stable as possible.
Decide Keep, change or drop the idea based on the result.
PreviewHypotheses and experiments Discovery and evidence Opinions differ and a small test could settle it with evidence. 5 Used by Product Owner Discovery and evidence · cheat sheet Personas A short, evidence-based profile of a typical user group, to keep real people in mind when deciding.
Common practice 5 steps Used by Product Owner
What it is A short, realistic profile of a typical user group, based on research: their goals, frustrations, context and behaviour.
When to use it When the team keeps arguing about “the user” without knowing who that is.
Why it works It helps teams design for real people instead of “everyone”, and settle debates with “what would this person need?”.
Do Personas invented without research just repeat the team's assumptions. Don't Invented personas that only confirm what you wanted to build. Step by step Start from research Interviews, data, support requests.
Group similar users By goals and behaviour, not age or job title alone.
Write one page per persona A name, context, goals, frustrations, a typical day.
Keep to a few Three to five main personas.
Use them in decisions Refer to them when prioritising and designing.
PreviewPersonas Discovery and evidence A team designs for “everyone” and needs real user groups in mind. 5 Used by Product Owner Discovery and evidence · cheat sheet Product analytics and funnels Measure how users move through key steps, to see where they get stuck.
Common practice 6 steps Used by Product Owner
What it is Measuring how people actually use a product or service: what they do, where they drop out, and what changes after a release.
When to use it Once real users are using the product, to find where value leaks.
Why it works Behaviour data shows what's really happening, which surveys and opinions often miss.
Do Too many measures hide the important ones; pick a few. Don't Vanity numbers (downloads) instead of behaviour. Data without conversations: you see what, not why. Step by step Decide the questions What do you need to know? Where do users struggle?
Choose a few key measures For example completion rate, time to complete, repeat use.
Track them consistently Before and after changes.
Look at journeys, not just totals Where do people drop out?
Combine with talking to users Data shows what; conversations show why.
Respect privacy Collect only what you need, and follow the law.
PreviewProduct analytics and funnels Discovery and evidence You need to see what users actually do, not what they say. 6 Used by Product Owner Discovery and evidence · cheat sheet Prototyping and mock-ups Letting users try a simple version of a design (paper screens, cardboard rooms, clickable models) before it's built for real.
Common practice 5 steps Used by Project Manager
What it is Building a quick, cheap version of a design (paper screens, cardboard rooms, clickable models) so users can try it before the real thing is built.
When to use it When it's hard to judge a design from drawings or descriptions, and before costly building starts.
Why it works People can't judge a design from drawings as well as from trying it. Problems found on a prototype cost a tiny fraction of problems found later.
Do Rough prototypes get more honest feedback than polished ones. Don't Polishing the prototype instead of learning. Testing with the design team instead of real users. Step by step Decide the question What do we want to learn?
Build the cheapest thing that answers it Low fidelity first.
Use real tasks Ask users to do what they'd really do.
Watch and listen Behaviour beats opinions.
Change and repeat Until the big problems are gone.
PreviewPrototyping and mock-ups Discovery and evidence Users can't judge a design from drawings and changes later would be costly. 5 Used by Project Manager Discovery and evidence · cheat sheet Sprint Review (for stakeholders) In agile work, a regular session where the team shows what it built, stakeholders try it and give feedback, and the next steps are adjusted.
Common practice 6 steps Used by Project Manager
What it is In agile work, a regular session at the end of each cycle where the team shows what it built, stakeholders try it, and together they adjust what comes next.
When to use it Every Sprint or iteration, typically every one to four weeks.
Why it works Seeing and using real results is the fastest way to find out if work meets needs. Stakeholder feedback directly shapes the next steps.
Do As a project manager in a hybrid project, attend: it's where you see real progress. Don't Treating it as a status meeting. Giving developers direct instructions instead of feedback to the Product Owner. Step by step Know the goal of the cycle What was the team aiming for?
Bring the right people Users and stakeholders, not just managers.
Try the working results Hands on, not slides.
Give specific feedback Needs, problems, priorities.
Talk about what's next The person who orders the backlog decides, using what was heard.
Follow up See what changed in the next cycle.
PreviewSprint Review (for stakeholders) Discovery and evidence An agile team shows results and stakeholders should shape what comes next. 6 Used by Project Manager Discovery and evidence · cheat sheet Voice of the customer Gathering what customers say they need, from several sources, and sorting it into a few clear needs; weighed against the voice of the business and of employees.
Common practice 6 steps Used by Process Improvement Specialist
What it is The voice of the customer means what customers say they need, in their own words, gathered from several sources and sorted into a few clear needs.
It sits beside two other voices: the voice of the business (targets, costs, risks) and the voice of the employee (what makes the work hard). A good project goal satisfies all three.
When to use it When a project must decide what “good” means for the people it serves, usually early on.
Why it works Teams often assume they know what customers want. Asking shows what really matters, and stops effort going into the wrong improvements.
Do Talk to customers who don't complain, too. Ask open questions: “Tell me about the last time…” Don't Using only complaints, which come from the angriest few. Asking staff what customers want instead of asking customers. Leading questions that get the answer you hoped for. Step by step List sources Conversations, surveys, complaints, staff, behaviour data.
Collect words Quote, don't paraphrase.
Group into themes
Find the need behind each theme Ask why it matters.
Weigh them How often, how strongly.
Turn into requirements Measurable, with targets.
PreviewVoice of the customer Discovery and evidence You must decide what “good” means for the people you serve. 6 Used by Process Improvement Specialist Estimation · cheat sheet #NoEstimates Split work into similar small items and forecast by counting how many get Done, instead of estimating each one.
Common practice 5 steps Used by Product Owner
What it is An approach where a team stops estimating each item and instead splits work into similar small pieces, then forecasts by counting how many pieces it finishes.
When to use it With a stable team that already splits work small. Less useful when items vary a lot in size.
Why it works If items are all small and similar, counting them predicts as well as estimating them, and saves the time spent estimating.
Do It needs consistent splitting; it doesn't work with a mix of tiny and huge items. Don't Calling it “no planning”: it still needs a well-split, ordered backlog. Step by step Split work into small, similar pieces Aim for items that each take a few days at most.
Count what gets finished Track items finished per week.
Forecast with ranges Use the history: at 6 to 9 items a week, 40 items take about 5 to 7 weeks.
Keep splitting big things Anything that looks much bigger than usual gets split before it starts.
Check the forecast often Update it every week as real data comes in.
Preview#NoEstimates Estimation Work can be split into small, similar pieces and counted instead. 5 Used by Product Owner Estimation · cheat sheet Affinity estimation The team silently sorts many items from small to large on a wall, then agrees sizes in one go.
Common practice 5 steps Used by Product Owner
What it is A silent, fast way to size many items at once: the team places cards on a wall from small to large, without talking at first, then discusses only the items that keep moving.
When to use it When there are dozens of items to size, for example at the start of a product or a big new area.
Why it works It sizes dozens of items in under an hour, and the silence stops a few loud voices from dominating.
Do Have someone explain unclear items before the silent round starts. Don't Using it for items that need real discussion; use Planning Poker for those. Step by step Prepare the wall Write “smaller” on the left and “larger” on the right.
Place cards silently Each person places items relative to others. Anyone may move any card, still in silence.
Mark the contested cards Cards that move back and forth get a dot.
Discuss only the dotted ones Short conversations; decide together.
Draw size columns Group the line into sizes or point values.
PreviewAffinity estimation Estimation Dozens of items need sizing in under an hour. 5 Used by Product Owner Estimation · cheat sheet Analogous estimating Estimating from a similar past project, adjusted for the differences. Fast, but rough.
Common practice 5 steps Used by Project Manager
What it is Estimating a new piece of work from a similar past one, adjusted for differences. It's top-down and quick.
When to use it Early on, when little detail is known: in the business case or the charter.
Why it works When little is known, history is the best guide. It gives a reasonable first number for decisions like “is this worth doing?”.
Do Use actuals from the past project, not its original estimate. Don't Treating a rough comparison as a commitment. Comparing projects that aren't really alike. Step by step Find a comparable past project Similar type, size and context, with known actual costs and durations.
List the differences Size, location, prices, technology, team experience.
Adjust Scale up or down for each difference, and adjust for price changes since then.
Give a range Analogous estimates are rough; say so with a range, for example −25% to +50%.
Replace it later Once the work is broken down, make a bottom-up estimate.
PreviewAnalogous estimating Estimation Little is known yet and a similar past project exists. 5 Used by Project Manager Estimation · cheat sheet Bottom-up estimating Estimating each small piece of work separately and adding them up. Slower, but more accurate.
Common practice 6 steps Used by Project Manager
What it is Estimating each small piece of work separately and adding them up. It needs a work breakdown and is slower, but more accurate.
When to use it Once the work is broken down (a WBS exists) and quotes or expert input are available.
Why it works Small pieces are easier to estimate well, and the people doing the work can estimate their own parts.
Do Don't let each estimator pad silently; padding hidden everywhere adds up to a lot. Don't Every estimator adding their own hidden buffer. Forgetting management, testing or handover work. Step by step Start from the work breakdown Each lowest-level work package is estimated.
Estimate with the people doing the work Use quotes, rates and past data.
Record assumptions What each estimate includes and assumes (the basis of estimate).
Add up by branch Then the whole project.
Add contingency visibly For identified risks, as a separate line, not hidden in each estimate.
Compare with the top-down figure Explain any big difference before anyone decides.
PreviewBottom-up estimating Estimation The work is broken down and you need an accurate budget. 6 Used by Project Manager Estimation · cheat sheet Planning Poker Everyone estimates at the same time, so nobody anchors on the first number said out loud.
Common practice 6 steps Used by Product Owner
What it is A way for a team to estimate the relative size of work together. Each person picks a card with a number in secret; everyone shows at once; the highest and lowest explain their thinking; then they vote again.
When to use it In refinement, for items the team is about to work on, when you want the whole team's view and to surface hidden assumptions.
Why it works Showing cards at the same time stops people simply copying the most senior person. The discussion between high and low estimates uncovers hidden work and different assumptions.
Do Timebox each item; if it takes more than a few minutes, it needs splitting or research. Estimates are for the team's planning, not for comparing teams. Don't Averaging the numbers instead of talking about the difference. Senior people revealing first. Spending 20 minutes on one item; split it or park it instead. Step by step Prepare cards Usually a sequence like 1, 2, 3, 5, 8, 13, 20 plus “?”. The gaps grow because bigger items are less certain.
Explain the item The person who knows the need explains it and answers questions. They don't estimate.
Everyone picks a card in secret Only people who'll do the work estimate.
Reveal together If the numbers are close, take the common one.
Discuss the extremes Highest and lowest explain. Often one knows something the others don't.
Vote again Usually two rounds are enough. If not, split the item or investigate it first.
PreviewPlanning Poker Estimation A team estimates together and you want hidden assumptions to surface. 6 Used by Product Owner Estimation · cheat sheet Story points A unit for how big a piece of work is compared with other pieces, not how many hours it takes.
Common practice 6 steps Used by Product Owner
What it is Story points measure how big a piece of work is compared with other pieces, not how many hours it takes. Size includes effort, complexity and uncertainty together.
A team picks a reference item, gives it a number, and sizes everything else relative to it.
When to use it When the Developers want to compare the size of backlog items quickly and use their own history to forecast. Skip it if the team finds it creates more debate than value; the Scrum Guide doesn't require any estimation unit.
Why it works People are poor at predicting hours but fairly good at comparing: “this is about twice that”. Relative sizes, combined with the team's own history, give more reliable forecasts than hour estimates.
Do Never turn points back into hours or use them as targets. Points aren't comparable between teams; each team's scale is its own. Don't Turning points back into hours, or into a target. Comparing points between teams: each team's scale is its own. The Product Owner or a manager estimating for the Developers. Step by step Choose a reference item A small, well-understood piece of work the whole team knows. Give it 2 or 3, so smaller items still fit below it.
Use a coarse scale Often 1, 2, 3, 5, 8, 13. The growing gaps stop debates about tiny differences.
Compare, don't calculate For each new item ask: about the same as the reference, twice as big, much bigger?
Only the people doing the work estimate Others explain and answer questions.
Track what gets finished The points of finished work per period become the team's own pace (velocity) for forecasting.
Re-size when you learn If an item turns out much bigger, split it rather than changing history.
PreviewStory points Estimation You want to compare the size of work items without arguing about hours. 6 Used by Product Owner Estimation · cheat sheet T-shirt sizing Rough sizes like S, M and L for early or large items where numbers would pretend to be precise.
Common practice 5 steps Used by Product Owner
What it is A quick, rough way to size work using shirt sizes: XS, S, M, L, XL. It's used early, when detail is low and many items need a first sorting.
When to use it Early in a product, for big items far down the backlog, or for roadmap conversations with stakeholders.
Why it works Words like “medium” invite less false precision than numbers, so it's fast and keeps conversations at the right level for early planning.
Do Use it early; switch to finer estimates when you plan the near term in detail. Don't Treating an L as a commitment. Never refining big items into smaller ones. Step by step Agree what each size roughly means For example S ≈ a few days, M ≈ a couple of weeks, L ≈ a month, XL ≈ too big, split it.
Lay out the items Cards on a table or a board with size columns.
Sort quickly together Place each item in a column; move it if someone disagrees, and discuss only real disagreements.
Split the XLs Anything XL is too uncertain to plan; break it down.
Convert only when needed For budgets or roadmaps, map sizes to ranges, never to exact numbers.
PreviewT-shirt sizing Estimation You need a quick, rough sort of many ideas early on. 5 Used by Product Owner Estimation · cheat sheet Three-point estimating Estimating uncertain work with three numbers (best, most likely, worst case) and combining them into a more realistic figure.
Common practice 5 steps Used by Project Manager
What it is Instead of one number, you ask for three: the best case, the most likely case and the worst case. A weighted average gives a more realistic estimate, and the spread shows the uncertainty.
When to use it When an activity is uncertain or has never been done quite like this before.
Why it works Single numbers hide risk and are usually optimistic. Asking for the worst case makes people think about what could go wrong, and the spread tells you which estimates deserve attention.
Do Make sure the worst case is really bad, not “likely plus a bit”. Add estimates for whole chains with care: the chance of everything going to plan is small. Don't Asking for three numbers but only using the most likely one. Worst cases that are really just “likely plus a bit”. Step by step Pick the uncertain activities Use three-point estimates where it matters: long, new or risky work.
Ask the people who'll do the work Get best, most likely and worst cases. Ask what would have to happen for each.
Calculate Weighted (beta) average: (best + 4 × likely + worst) ÷ 6. Simple (triangular) average: (best + likely + worst) ÷ 3.
Look at the spread Worst minus best. A wide spread means a risk to watch and maybe to respond to.
Use it in the plan Schedule with the weighted estimate, record the range, and add contingency for the risky chains.
PreviewThree-point estimating Estimation An activity is uncertain and one number would hide the risk. 5 Used by Project Manager Facilitation · cheat sheet 1-2-4-All Think alone, then in pairs, then in fours, then as a whole group, so everyone's ideas are heard.
Common practice 5 steps Used by Scrum Master
What it is A facilitation pattern: think alone (1), then in pairs (2), then in fours (4), then share with the whole group (all).
When to use it When a few voices dominate a meeting, or quiet people never speak.
Why it works Everyone thinks before the loudest voices speak, ideas get better as they're combined, and large groups reach shared answers quickly.
Do Keep the times short; energy matters more than completeness. Don't Skipping the silent first step. Step by step Ask one clear question For example: “What's the biggest risk to our opening date?”
1: one minute alone Write ideas silently.
2: two minutes in pairs Build on each other's ideas.
4: four minutes in fours Pick the strongest ideas.
All: five minutes together Each group shares one idea.
Preview1-2-4-All Facilitation A big group needs everyone's ideas quickly, not just the loudest. 5 Used by Scrum Master Facilitation · cheat sheet Consent vs consensus Agree in advance how a decision is made: everyone loves it (consensus), nobody objects (consent), or one person decides.
Common practice 6 steps Used by Scrum Master
What it is A decision method where a proposal goes ahead unless someone has a reasoned objection: “Is it safe enough to try?” rather than “Does everyone love it?”.
When to use it Before a decision that tends to drag on, or when people argue about who decides.
Why it works It's faster than full consensus but still respects real concerns, and it encourages trying things and adjusting.
Do Preferences aren't objections; harm is. Don't Seeking consensus on everything, so nothing gets decided. Step by step Present the proposal Clearly, with its purpose.
Clarifying questions Only questions, no opinions yet.
Reactions round Each person says briefly what they think.
Ask for objections An objection must explain how the proposal would cause harm.
Adjust to resolve objections Then decide.
Set a review date Decisions are tried and reviewed.
PreviewConsent vs consensus Facilitation A group must decide fast but respect genuine objections. 6 Used by Scrum Master Facilitation · cheat sheet Fist of five A quick show of fingers (0 to 5) to see how much support a proposal really has.
Common practice 5 steps Used by Scrum Master
What it is A quick way to check agreement: everyone shows 0 to 5 fingers at the same time, from “I block this” to “I fully support it”.
When to use it To check agreement fast, or the team's confidence in a plan.
Why it works It reveals hidden doubts in seconds and focuses discussion on the people who aren't convinced.
Do Don't ignore 1s and 2s just because most people agree. Don't Pressuring the people who show low numbers. Step by step State the proposal clearly What exactly are we agreeing to?
Explain the scale 0 = block, 1–2 = serious concerns, 3 = can live with it, 4–5 = support.
Vote together On the count of three.
Hear the low votes What would make it acceptable?
Adjust and re-vote Or decide with the concerns noted.
PreviewFist of five Facilitation You need to check real agreement in seconds. 5 Used by Scrum Master Facilitation · cheat sheet Kick-off meeting The first meeting with everyone involved, to align on why the project exists, what it will deliver, who does what and how the team will work.
Common practice 6 steps Used by Project Manager
What it is The first meeting with everyone involved in a project, to align on purpose, scope, roles, ways of working, risks and first actions.
When to use it Once the project is authorised and the main people are known, before the detailed work starts.
Why it works People who start with the same picture make fewer conflicting assumptions, and a good start builds momentum and trust.
Do Leave at least a quarter of the time for questions. Send the notes the same day. Don't A long presentation with no conversation. No actions at the end. Missing key people, such as suppliers or users. Step by step Prepare Agenda, pre-read (charter summary), invite the right people including suppliers and users.
Open with why The sponsor explains why the project matters.
Cover what and who Objective, scope, milestones, roles (a RACI helps).
Agree how Ways of working, meetings, communication, decisions.
Surface risks and questions Give real time; park long debates.
Close with actions Owners and dates; send notes the same day.
PreviewKick-off meeting Facilitation A project or big piece of work is about to start with many people. 6 Used by Project Manager Facilitation · cheat sheet Parking lot A visible list for good topics that don't belong in the current discussion, so they aren't lost.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is A visible list where off-topic or too-long discussions are “parked” during a meeting, with a promise to deal with them later.
When to use it In any event that starts drifting, especially the Daily Scrum.
Why it works It keeps meetings on track without dismissing important points.
Do Never let the parking lot become a graveyard. Don't A parking lot nobody ever empties. Step by step Set it up at the start A flip chart or shared note.
Park topics politely “Important; let's park it so we finish the agenda.”
Note who raised it And what they need.
Review it at the end Decide for each: owner, date, or drop.
Follow up Or people stop trusting the parking lot.
PreviewParking lot Facilitation An important side topic threatens to take over a meeting. 5 Used by Scrum Master, Project Manager Facilitation · cheat sheet Silent brainstorming Everyone writes ideas on their own before anyone talks.
Common practice 5 steps Used by Scrum Master, Process Improvement Specialist
What it is Generating ideas by writing them down silently before discussing them.
When to use it Whenever you want many ideas and an equal voice, especially in Retrospectives and refinement.
Why it works It produces more ideas, avoids groupthink, and gives quieter people an equal voice.
Do No discussion until the writing stops. Don't Letting people talk during the silent part. Step by step Ask a clear question One question per session.
Write silently One idea per note, a few minutes.
Post and read Everyone reads all notes.
Cluster Group similar ideas.
Discuss and choose Then decide.
PreviewSilent brainstorming Facilitation You want many ideas without groupthink. 5 Used by Scrum Master, Process Improvement Specialist Facilitation · cheat sheet Timeboxing Give an event or activity a maximum length, and end it on time.
Named in the Scrum Guide 5 steps Used by Scrum Master, Product Owner, Project Manager
What it is Giving an activity a fixed maximum length of time and ending it when the time is up, whatever the state.
When to use it For every Scrum event (the Scrum Guide sets maximum durations) and for workshops or discussions that tend to drift.
Why it works It stops meetings and tasks from expanding, forces focus on what matters, and makes planning predictable.
Do A time box is a maximum; finishing early is fine. Don't Ending on time without an outcome. Letting the most senior person extend it. Step by step Set the time box Before starting.
Share the goal of the time box What should be done by the end?
Make time visible A clock or timer.
Check in near the end Five minutes left: what's most important?
Stop on time Decide what to do with anything unfinished.
PreviewTimeboxing Facilitation Meetings or tasks keep expanding to fill all available time. 5 Used by Scrum Master, Product Owner, Project Manager Facilitation · cheat sheet Urgent vs important Sorting tasks by urgency and importance into four boxes: do now, schedule, delegate, drop.
Common practice 6 steps Used by Project Manager
What it is Sorting tasks by urgency and importance into four boxes: do now (urgent, important), schedule (important, not urgent), delegate (urgent, not important), drop (neither).
When to use it When there's more to do than time, every day for busy leaders.
Why it works Busy leaders drift into urgent but unimportant work. The matrix protects time for the important work that drives results.
Do If everything is urgent, look at why; it often points to missing planning. Don't Spending all day on urgent but unimportant things. Never scheduling the important work. Step by step List everything on your plate Emails, meetings, requests, tasks.
Mark important or not Does it serve the project's goals?
Mark urgent or not Does it need doing now?
Sort into the four boxes Do, schedule, delegate, drop.
Block time For the “schedule” box, in your calendar.
Review daily or weekly Things move between boxes.
PreviewUrgent vs important Facilitation There's more to do than time and urgent things crowd out important ones. 6 Used by Project Manager Facilitation · cheat sheet Working agreements A short list of how the team chooses to work together, written by the team itself.
Common practice 5 steps Used by Scrum Master, Project Manager, Process Improvement Specialist
What it is A short list of rules a team agrees about how it works together: meetings, communication, decisions, availability.
When to use it When a team starts, when new people join, or after friction.
Why it works Unspoken expectations cause friction. Agreeing them openly makes behaviour predictable and gives a fair way to raise problems.
Do Five to eight agreements is enough. Don't Rules written by the Scrum Master for the team. Agreements nobody looks at again. Step by step Ask what's causing friction Or what people value.
Propose short agreements Specific behaviours, not values.
Agree together Everyone can live with each one.
Make them visible On the team board or page.
Review them Every few weeks, or when friction returns.
PreviewWorking agreements Facilitation Unspoken expectations are causing friction in a team. 5 Used by Scrum Master, Project Manager, Process Improvement Specialist Flow and visual management · cheat sheet Cycle time and throughput How long items take from start to Done, and how many get Done per week.
Common practice 5 steps Used by Scrum Master
What it is The time an item takes from when work starts until it's finished. Tracking it shows how fast work really flows.
When to use it To see whether work flows well and to forecast without estimates.
Why it works It helps forecast (“items usually take 3 to 7 days”) and shows whether changes speed things up.
Do Use it for forecasting single items: “within 7 days, 85% of the time”. Don't Using the numbers to compare or rank people. Step by step Record start and finish dates For each item.
Calculate cycle time Finish minus start.
Plot it A dot per item over time.
Use percentiles “85% of items finish within 7 days.”
Investigate outliers Why did some take much longer?
PreviewCycle time and throughput Flow and visual management You want to know how long work really takes, to forecast and improve. 5 Used by Scrum Master Flow and visual management · cheat sheet Impediment board A visible list of what is blocking the team, who is on it and its status.
Common practice 5 steps Used by Scrum Master
What it is A visible list of everything blocking the team, with who's handling it and its status.
When to use it From the first Sprint, so blockers never disappear into chat messages.
Why it works Blockers hidden in people's heads stay unsolved. Making them visible gets them owned and removed.
Do Escalate with a clear ask, not just a complaint. Don't A list that grows and is never cleared. Step by step Create the board Columns: New, Being handled, Waiting, Solved.
Add blockers as soon as they appear One card each, with impact.
Give each an owner Often the person best placed to remove it.
Review daily or weekly Escalate what's stuck.
Look for patterns Repeated blockers point to a deeper problem.
PreviewImpediment board Flow and visual management Blockers sit unsolved because nobody can see or owns them. 5 Used by Scrum Master Flow and visual management · cheat sheet Kanban board A board that shows every item and where it is in the work, so everyone sees progress and blockages.
Common practice 6 steps Used by Scrum Master
What it is A board with columns for the stages work goes through (for example To do, Doing, Done) and a card for each piece of work, moved as it progresses.
When to use it Almost always: it makes the Sprint Backlog transparent. The Developers decide its columns.
Why it works It makes work visible: everyone sees what's happening, what's stuck and what's next, without status meetings.
Do Columns should show where work really waits, not just activities. Don't A board updated only for the Scrum Master. Columns that copy a hand-off process. Step by step Map your real workflow The actual steps work goes through, not an ideal.
Make a column per step Add “waiting” columns where work waits for someone.
One card per item With an owner and key dates.
Move cards as work moves Update daily.
Look for stuck cards Discuss blockers in a short daily check.
Improve the flow Add limits on work in progress when ready.
PreviewKanban board Flow and visual management You want everyone to see the work, what's stuck and what's next. 6 Used by Scrum Master Flow and visual management · cheat sheet Swarming Several Developers work together on one item to finish it, instead of each starting something new.
Common practice 4 steps Used by Scrum Master, Product Owner
What it is Several people working together on one item to finish it faster, instead of each working on separate items.
When to use it When an important item is stuck or at risk, especially near the end of a Sprint.
Why it works Finishing one thing at a time delivers value sooner and reduces the risk of many half-done items.
Do It's a good habit near the end of a period, when many items are almost done. Don't Too many people on one small task. Step by step Pick the most important item Or the one that's blocked.
Ask who can help Even outside their speciality.
Split the work on that item Pair or divide tasks.
Finish it Then move to the next.
PreviewSwarming Flow and visual management One important item is blocked or nearly done and needs finishing. 4 Used by Scrum Master, Product Owner Flow and visual management · cheat sheet Work-in-progress (WIP) limits A maximum number of items allowed in a column at once, so the team finishes work before starting more.
Common practice 5 steps Used by Scrum Master
What it is A maximum number of items allowed in a column (or in progress overall) at one time. New work only starts when something finishes.
When to use it When many items are started and few are finished.
Why it works Starting too much slows everything down. Limits force people to finish work, expose bottlenecks and shorten delivery times.
Do Limits will feel uncomfortable at first; that discomfort shows where flow is blocked. Don't Ignoring the limit when under pressure. Step by step Measure today's work in progress Count cards per column.
Set limits a little below today For example, people × 1.5.
Write limits on the board Above each column.
When a column is full, help finish Instead of starting something new.
Adjust Lower limits until flow improves, raise them if people are idle.
PreviewWork-in-progress (WIP) limits Flow and visual management Too much is started and too little gets finished. 5 Used by Scrum Master Forecasting · cheat sheet Burn-up and burn-down charts Charts of work done over time that show a likely range for when a set of work might be finished.
Named in the Scrum Guide 6 steps Used by Product Owner, Scrum Master, Project Manager
What it is A chart with two lines over time: total work in scope and work completed. Where the completed line is heading shows when the work is likely to finish.
When to use it To answer “when?” with evidence. The Scrum Guide names burn-downs and burn-ups as useful, but says they don't replace empiricism.
Why it works It shows progress and scope changes on one chart, so stakeholders see both why dates move and how fast work is getting done.
Do Always show a range; a single line suggests false certainty. Don't Promising the fastest line. Using burn-downs to pressure the Developers. Step by step Choose a unit Items, points or value.
Plot total scope It goes up when scope is added.
Plot completed work Each period.
Draw the trend Use a range from slow to fast periods, not one line.
Read the forecast Where the completed range meets the scope line.
Update every period And explain scope changes.
PreviewBurn-up and burn-down charts Forecasting You want to show progress and scope changes together, with a forecast. 6 Used by Product Owner, Scrum Master, Project Manager Governance and roles · cheat sheet Management by exception Leaders agree limits (tolerances) for cost, time and scope; the project manager acts freely inside them and escalates only when a limit will be exceeded.
Common practice 6 steps Used by Project Manager
What it is Leaders agree limits (tolerances) for time, cost, scope, quality and risk. Within them, the project manager decides; beyond them, the issue is escalated at once.
When to use it When the project starts and the governance is set up; used every day after that.
Why it works It lets leaders steer without attending every meeting, and lets the project manager act quickly within clear limits.
Do Tolerances too tight mean everything escalates; too wide, and leaders lose control. Don't Tolerances so tight that everything is escalated. Escalating a problem without options. Hiding a breach until it can't be hidden. Step by step Agree tolerances For example ± €25,000 or ± 2 weeks per stage.
Write them down In the charter or plan.
Decide inside them And report afterwards.
Forecast regularly So you see an exception coming.
Escalate at once when a forecast exceeds them With options and a recommendation.
Let leaders review at set points Stage ends, monthly boards.
PreviewManagement by exception Governance and roles Leaders want control without being in every decision. 6 Used by Project Manager Governance and roles · cheat sheet RACI A simple way to say who is Responsible, Accountable, Consulted and Informed for each piece of work or decision.
Common practice 6 steps Used by Project Manager, Process Improvement Specialist
What it is A RACI chart is a grid. Down the side are the pieces of work or decisions; across the top are people or roles. In each cell you write one letter: R, A, C or I.
R (Responsible) does the work. A (Accountable) owns the result and signs it off; there is exactly one per row. C (Consulted) is asked for input before. I (Informed) is told after.
When to use it When several people or organisations work on the same deliverables, or when ownership is unclear or disputed.
Variations RASCI adds S for Support: people who help the responsible person.DACI Driver, Approver, Contributors, Informed: used for decisions rather than deliverables.Delegation levels a finer scale for how much a team decides on its own.Why it works Most project friction comes from unclear ownership: two people both think they decide, or nobody does. A RACI makes the assumptions visible so they can be agreed before they cause trouble.
Because each row has exactly one A, the chart also tells you who to go to when something about that deliverable needs a decision.
Do Build it with the people named, not alone at your desk. When someone is accountable for everything, nobody else feels accountable for anything. Keep it to one page; link to it from the project plan. Don't Two people accountable for one thing, or nobody. Consulting everyone on everything. Making the chart alone and announcing it. Step by step List what needs owning Write the main deliverables and the recurring decisions, one per row. Ten to twenty rows is usually enough; more detail rarely helps.
List the people or roles Use roles where people may change, names where it helps. Include suppliers and approvers, not just the core team.
Fill in A first For each row, agree who is accountable. If two people claim it, settle it now with the sponsor. If nobody wants it, that's a risk to raise.
Add R, then C and I Responsible can be several people. Keep C small: every C is someone who can slow a decision down. I is cheap; use it generously.
Check the columns A column full of R's is an overloaded person. A column of only I's may not need to be in the meetings. A column with no letters may be a missing stakeholder.
Agree it, then use it Walk through it with everyone named. Share it, refer to it in disputes, and update it when people or deliverables change.
PreviewRACI Governance and roles Two people think they own the same thing, or nobody does. 6 Used by Project Manager, Process Improvement Specialist Governance and roles · cheat sheet Stage gate A decision point at the end of each stage where the board decides to continue, continue with conditions, or stop.
Common practice 5 steps Used by Project Manager, Process Improvement Specialist
What it is A decision point at the end of a stage where leaders decide to continue, continue with conditions, or stop, based on evidence.
When to use it At the end of every management stage.
Why it works It makes continuing a conscious decision, checks the business case regularly, and lets projects stop before more money is wasted.
Do A gate where “stop” is never an option isn't a gate. Don't A gate nobody would ever close. Gates without an updated business case. Step by step Prepare an end-stage report Performance against baselines, risks, lessons.
Update the business case Costs, benefits, dates.
Present the next stage's plan What, when, how much.
Decide Go, go with conditions, or stop.
Record the decision And any conditions.
PreviewStage gate Governance and roles A stage ends and someone must decide whether to continue. 5 Used by Project Manager, Process Improvement Specialist Governance and roles · cheat sheet Tailoring the approach Adapting how a project is run (life cycle, documents, controls, meetings) to its size, risk and type of work, and choosing predictive, agile or hybrid for each part.
Common practice 6 steps Used by Project Manager
What it is Adapting how a project is run (its life cycle, documents, controls and meetings) to its size, risk and kind of work. It includes choosing predictive, agile or hybrid delivery for each part.
When to use it At the start of a project, and at stage ends if the situation changes.
Why it works No method fits every project as written. Too much process wastes time; too little loses control. Tailoring keeps what's useful and explains what's left out.
Do Write down what you dropped and why; auditors and sponsors will ask. Don't One approach forced on everything. Dropping controls without saying why. Step by step Look at each part of the work How clear are requirements? How costly is change? How much do users need to try things?
Choose the approach per part Predictive for clear, costly-to-change work; agile where learning from users matters; hybrid to combine them.
Choose the controls Which documents, reviews and meetings does this project actually need?
Agree with the standards owner The portfolio office or PMO.
Record the decisions and why In the plan.
Review at stage ends Adjust if the situation changes.
PreviewTailoring the approach Governance and roles A standard method or one approach doesn't fit every part of the work. 6 Used by Project Manager Governance and roles · cheat sheet Work authorisation Formally handing a piece of work to a team or supplier, with what to deliver, how it's accepted, dates, limits and reporting, so it starts at the right time with clear ownership.
Common practice 6 steps Used by Project Manager
What it is Formally handing a piece of work to a team or supplier with what to deliver, acceptance criteria, dates, limits and reporting.
When to use it Each time a piece of work starts during executing.
Why it works It makes ownership clear and gives everyone the same picture of “done”, which prevents disputes later.
Do Verbal go-aheads are easily forgotten; write it down, even briefly. Don't Starting work with a verbal “go ahead”. No acceptance criteria, so “done” is argued about later. Step by step Take the work package From the WBS and schedule.
Write what and how accepted Deliverables and criteria.
Add dates, effort and tolerances How far time and cost may move.
Agree reporting How and how often.
Both sides confirm Then work starts.
Close it on acceptance And record actual effort.
PreviewWork authorisation Governance and roles A piece of work starts and ownership must be unmistakable. 6 Used by Project Manager Lean and improvement · cheat sheet 5S Five steps to organise a workplace so the right things are in the right place, easy to find, and stay that way.
Common practice 5 steps Used by Process Improvement Specialist
What it is 5S is a method for organising a workplace: sort, set in order, shine, standardise, sustain.
When to use it When clutter, searching or out-of-date materials slow work or cause mistakes, and before introducing a new way of working.
Why it works Searching, clutter and old versions waste time and cause mistakes. A new process needs a workplace that supports it.
Do Take before and after photos. Sustain is the step most often skipped, and the one that matters most. Don't A one-off tidy-up with no sustain step. Doing it to people instead of with them. Step by step Sort Remove the unneeded.
Set in order A place for everything.
Shine Clean and inspect.
Standardise Agree and show how it should look.
Sustain Regular short checks.
Preview5S Lean and improvement Clutter or searching slows work or causes mistakes. 5 Used by Process Improvement Specialist Lean and improvement · cheat sheet CTQ tree A tree that turns a vague customer need into specific, measurable requirements, each with a target.
Common practice 5 steps Used by Process Improvement Specialist
What it is A tree that starts with a customer need on the left and branches to the right into drivers and then measurable requirements with targets.
CTQ means critical to quality: what must be right for the customer to be satisfied.
When to use it After gathering the voice of the customer, when needs must become something the project can measure.
Why it works Needs like “easy” or “fast” mean different things to different people. A CTQ tree turns them into measures everyone agrees on.
Do Use the customer's own words for the need. Keep only the requirements that matter most: two or three per need. Don't Measures that are easy to collect but don't reflect the need. Targets set without asking customers. Too many requirements to track. Step by step Need In plain words.
Drivers What the need means in practice.
Requirements Measurable for each driver.
Targets What good looks like.
Check with customers
PreviewCTQ tree Lean and improvement A vague customer need has to become something you can measure. 5 Used by Process Improvement Specialist Lean and improvement · cheat sheet Cause-and-effect matrix A table that scores how strongly each possible cause (input) affects each customer requirement (output), weighted by importance, to decide what to measure or analyse first.
Common practice 5 steps Used by Process Improvement Specialist
What it is A table with customer requirements across the top (weighted) and possible causes down the side. Each cause is scored for how strongly it affects each requirement.
When to use it After a fishbone or process map produces many possible causes, and you can only study a few.
Why it works It turns a long list of possible causes into a short, agreed list to measure first.
Do Score as a group, with people who know the process. Use 0, 1, 3, 9: the gaps make strong effects stand out. Don't Treating high scores as proven causes. Scoring without people who know the process. Using a 1-to-5 scale, which hides strong effects. Step by step Weight the requirements From the customer's needs.
List possible causes From the fishbone or process map.
Score 0, 1, 3 or 9.
Multiply and add
Sort and choose The top few.
PreviewCause-and-effect matrix Lean and improvement A long list of possible causes must be cut to a few worth measuring. 5 Used by Process Improvement Specialist Lean and improvement · cheat sheet Control plan A table of the key measures that keep a process on track: what is measured, how, how often, by whom, against what limits, with which chart, and what to do when it goes wrong.
Common practice 5 steps Used by Process Improvement Specialist
What it is A control plan lists the measures that keep a process on track, with how each is checked and what happens when it goes wrong. The response plan is the “what happens” part.
When to use it At the end of an improvement project, when handing the process to its owner, and whenever a process changes.
Why it works Gains fade when attention moves on. A plan with owners and reactions keeps them.
Do Control the causes as well as the result: they warn earlier. Keep it to the measures that matter. Don't Measures with no owner. Limits with no reaction plan. Controlling only the result, not the causes. Step by step Choose the measures Result and key causes.
For each Definition, method, frequency, owner, limits, chart.
Response plan Signal, first action, who to tell.
Lean controls 5S, mistake-proofing, kanban checks.
Sign and review
PreviewControl plan Lean and improvement An improved process must be kept on track after the project. 5 Used by Process Improvement Specialist Lean and improvement · cheat sheet DMAIC A five-phase path for improvement projects: define the problem, measure it, find the root causes, fix them, and keep the gains.
Common practice 5 steps Used by Process Improvement Specialist
What it is DMAIC is the five-phase path most Lean Six Sigma projects follow: Define, Measure, Analyse, Improve, Control.
Each phase answers one question, and a short review with the sponsor closes it before the team moves on.
When to use it When a problem matters, keeps coming back, and nobody knows its real cause. For obvious fixes, just do them.
Variations Plan-do-study-act A shorter cycle for small, fast improvements.Define, Measure, Analyse, Design, Verify Used when designing a new process rather than fixing an old one.Why it works It stops teams jumping to a solution before they understand the problem, and it makes sure fixes are proven and kept.
Do Write down your guesses about causes in Define, then test them in Analyse instead of acting on them. Keep each phase review short: what we learned, what's next, any help needed. Don't Jumping to a solution in Define before the causes are known. Spending months measuring and never improving. Skipping Control, so the process slides back within weeks. Step by step Define What is the problem, for which customer, and what does good look like? Agree the goal and the scope.
Measure How does the process perform today? Map it and collect data you can trust.
Analyse Why does it perform like that? Find the root causes and prove them with data.
Improve What will remove the causes? Test changes on a small scale, then put them in place.
Control How will the gains last? Set measures, routines and owners, then hand the process back.
PreviewDMAIC Lean and improvement A problem matters, keeps coming back, and nobody knows its real cause. 5 Used by Process Improvement Specialist Lean and improvement · cheat sheet FMEA A step-by-step review of how a process could fail, what each failure would do, why it would happen, and how likely it is to be caught, ranked by a risk score.
Common practice 6 steps Used by Process Improvement Specialist
What it is FMEA looks at each step of a process and asks how it could fail, what the effect would be, why it would happen and how it's caught. Each failure gets three scores, multiplied into a risk priority number.
When to use it When you need to find and rank risks in a process: in Analyse to spot likely causes, and in Improve to check a new design before it goes live.
Why it works It finds and ranks risks before they cause harm, including the quiet failures nobody complains about.
Do Score as a team, with a simple agreed scale. Always act on severity 9 or 10, whatever the RPN. Don't Scoring alone, without the people who do the work. Arguing over single points instead of ranking. Ignoring high-severity failures because their RPN is modest. Step by step Walk the map Step by step.
Failure, effect, cause For each step.
Score Severity, occurrence, detection: 1 to 10.
Multiply Risk priority number.
Act Highest first; severity 9 to 10 always.
Re-score After actions.
PreviewFMEA Lean and improvement You need to find and rank the ways a process could fail. 6 Used by Process Improvement Specialist Lean and improvement · cheat sheet Gemba walk Going to where the work actually happens to watch, ask questions and understand the real process, without judging.
Common practice 6 steps Used by Process Improvement Specialist
What it is A gemba walk means going to the place where the work is done to see it with your own eyes. Gemba is Japanese for “the real place”.
You watch, ask questions and take notes. You don't inspect, judge or fix on the spot.
When to use it At the start of any improvement, and regularly afterwards, whenever reports and meetings don't explain what's really going on.
Why it works Reports show summaries. The real process, with its waits, workarounds and frustrations, is only visible where the work happens.
Do Go at the busiest time, not when it's quiet. Stand where you can see without getting in the way. Leaders who walk regularly learn more than those who come once. Don't Turning it into an inspection, so people put on a show. Walking past without stopping to watch the work. Promising fixes you can't deliver. Step by step Choose a focus One process or one question, such as “why do orders wait?”.
Tell people Explain you're there to understand the process, not to check on them.
Watch and follow Follow one item from start to finish; time the steps and the waits.
Ask open questions What makes this hard? What happens when it goes wrong?
Note facts What you saw, when and how long. Not opinions.
Share and thank Tell people what you saw and what happens next.
PreviewGemba walk Lean and improvement Reports don't explain what's really happening in the work. 6 Used by Process Improvement Specialist Lean and improvement · cheat sheet Kanban replenishment A pull system where using up stock triggers its replacement: a card or empty bin signals the order, sized to cover the supplier's lead time plus a safety margin.
Common practice 5 steps Used by Process Improvement Specialist
What it is Kanban replenishment uses a visual signal, such as an empty bin or a card, to trigger reordering only what has been used.
When to use it For supplies used regularly, to stop both shortages and overstocking without counting stock.
Why it works It prevents both shortages and overstock without anyone counting stock.
Do Put the card where nobody can miss it when the bin empties. Don't Bins sized by guesswork. Cards that get lost, so nothing is ordered. Step by step Use and lead time
Bin size Use × lead time + safety.
Round to boxes
Two bins and cards
Review
PreviewKanban replenishment Lean and improvement Supplies run out or pile up. 5 Used by Process Improvement Specialist Lean and improvement · cheat sheet Mistake-proofing Designing a process so mistakes are impossible, or show up immediately, instead of relying on memory, care or inspection.
Common practice 5 steps Used by Process Improvement Specialist
What it is Mistake-proofing (poka-yoke in Japanese) designs processes so errors can't happen, or are noticed immediately.
When to use it When the same mistake keeps happening, especially when people are busy.
Why it works People make mistakes, especially when busy. Designing them out works better than asking people to be careful.
Do Prefer prevention to detection, and detection to inspection. Keep warnings rare, or people learn to ignore them. Don't Relying on reminders and training alone. Warnings that appear so often people click past them. Step by step Find the mistake
Prevent if possible
Otherwise detect at once
Test with users
Check over time
PreviewMistake-proofing Lean and improvement The same mistake keeps happening. 5 Used by Process Improvement Specialist Lean and improvement · cheat sheet Plan-do-study-act A small, planned test of a change: plan it with a prediction, do it, study the results against the prediction, then act: adopt, adapt or drop it.
Common practice 4 steps Used by Process Improvement Specialist
What it is Plan-do-study-act is a short cycle for testing a change: plan with a prediction, do it on a small scale, study the results against the prediction, then act.
When to use it Before rolling out any change that affects customers or staff.
Why it works Small tests find problems early and cheaply, and build confidence and evidence before a full roll-out.
Do Write the prediction before the test. Keep cycles short: days or weeks. Don't Pilots without a success measure. Changing the measure between baseline and pilot. Declaring success before studying the data. Step by step Plan Change, scope, measures, prediction.
Do Run it; note problems.
Study Compare with baseline and prediction.
Act Adopt, adapt or drop.
PreviewPlan-do-study-act Lean and improvement You want to test a change on a small scale before rolling it out. 4 Used by Process Improvement Specialist Lean and improvement · cheat sheet Problem statement A few sentences saying what is wrong, where, since when, how big it is and what it costs, with no causes or solutions, followed by a measurable goal.
Common practice 6 steps Used by Process Improvement Specialist
What it is A short description of the problem, written before anyone discusses causes: what is wrong, where, since when, how big, and what it costs.
It is followed by a goal statement saying what will change, by how much and by when.
When to use it At the start of an improvement project, before anyone discusses causes or fixes.
Why it works A shared, factual problem keeps the team from chasing a favourite solution, and gives a starting point to measure progress against.
Do Read it aloud to someone outside the team. If they ask “why is that?”, you've written it well. If you find yourself writing “because”, delete what follows. Don't Hiding a cause or a solution in the problem (“because we lack staff”). No numbers, so progress can't be shown. A goal so ambitious that nobody believes it. Step by step What In the customer's terms.
Where and since when Which process, which period.
How big A number from data.
Impact On customers, money and risk.
Remove causes and solutions Check every word.
Write the goal How far, by when, measured how.
PreviewProblem statement Lean and improvement A project starts and everyone already has a favourite cause or fix. 6 Used by Process Improvement Specialist Lean and improvement · cheat sheet Process map A diagram of every step, decision, hand-off and loop in a process as it really works, with one lane for each person or system.
Common practice 6 steps Used by Process Improvement Specialist
What it is A process map shows every step of a process in order, with decisions, loops and hand-offs. A swimlane map puts each person or system in its own lane, so every hand-off crosses a line.
When to use it When a team needs to see exactly how work flows, and where it waits, loops or changes hands.
Why it works Most delays and errors happen between steps and between people. A real, shared map makes them visible.
Do Use sticky notes on a wall first; draw it neatly later. Map one typical path first, then the exceptions. Don't Mapping the procedure instead of reality. Too much detail too early. Mapping alone, without the people who do the work. Step by step Agree start and end From the SIPOC.
Draw lanes One per person, team or system.
Walk and add steps With the people who do the work.
Add decisions and loops
Mark problems Waits, hand-offs, rework.
Check it With people who weren't there.
PreviewProcess map Lean and improvement You need to see exactly how work flows, hands over and loops. 6 Used by Process Improvement Specialist Lean and improvement · cheat sheet Project selection matrix A table that scores improvement ideas against criteria agreed with the sponsor, so the most worthwhile one becomes the next project.
Common practice 6 steps Used by Process Improvement Specialist
What it is A table that scores candidate improvement projects against weighted criteria agreed with the sponsor.
It turns a debate about favourites into a clear, explainable choice.
When to use it When there are more improvement ideas than people to work on them, and you need a fair, explainable choice.
Why it works There are always more ideas than people. Choosing openly, on agreed criteria, builds support and stops the loudest voice winning.
Do Agree the criteria before anyone sees the candidates. If the result feels wrong, discuss why rather than changing the numbers. Don't Adjusting the scores until the favourite wins. Choosing the easiest project instead of one that matters. Never telling people what happened to their ideas. Step by step Sort the ideas first Obvious fixes are just done; small known problems get a short workshop.
Agree criteria and weights With the sponsor.
Score together 1 to 5, using facts where possible.
Calculate totals Score × weight, added up.
Discuss the top two Then decide.
Record and tell people Including why other ideas weren't chosen.
PreviewProject selection matrix Lean and improvement There are more improvement ideas than people to work on them. 6 Used by Process Improvement Specialist Lean and improvement · cheat sheet SIPOC A one-page, high-level picture of a process: who supplies what, the five or six main steps, and what goes to which customers.
Common practice 5 steps Used by Process Improvement Specialist
What it is A table with five columns: Suppliers, Inputs, Process, Outputs, Customers. The process column holds five or six main steps.
It gives everyone the same high-level picture before any detail.
When to use it Early in a project, to agree the process and its edges before mapping the detail.
Why it works It agrees the edges of the process and who is involved, so the team doesn't map the wrong thing in detail.
Do Write the process steps on sticky notes so the team can move them. Keep it to one page. Don't Too many steps: it becomes a detailed map. Forgetting internal customers and suppliers. Starting with suppliers instead of the process. Step by step Name and bound the process Start and end points.
Main steps Five or six verbs.
Outputs and customers What comes out, for whom.
Inputs and suppliers What each step needs, from whom.
Check With people who do the work.
PreviewSIPOC Lean and improvement A team needs a shared, one-page picture of a process and its edges. 5 Used by Process Improvement Specialist Lean and improvement · cheat sheet Solution selection matrix A table that scores candidate solutions against weighted criteria, such as effect on root causes, cost, speed, acceptance and risk, to choose a set that works.
Common practice 5 steps Used by Process Improvement Specialist
What it is A solution selection matrix scores candidate solutions against criteria agreed with the sponsor, each with a weight, to choose a set that removes the proven causes at acceptable cost and risk.
When to use it When there are several possible solutions and you need a fair, explainable choice.
Why it works It makes the choice fair and explainable, and stops favourite ideas winning without evidence.
Do Score cost so that 5 means cheapest: every column then reads “higher is better”. Don't Choosing the favourite and scoring to fit. Picking one solution when several causes need several fixes. Step by step List causes and solutions
Agree criteria and weights Before scoring.
Score 1 to 5
Weighted totals
Check cause coverage
PreviewSolution selection matrix Lean and improvement Several solutions compete and you need a fair choice. 5 Used by Process Improvement Specialist Lean and improvement · cheat sheet Spaghetti diagram A floor plan with a line drawn wherever a person or item goes during a process, showing wasted walking and carrying.
Common practice 6 steps Used by Process Improvement Specialist
What it is A floor plan with a line drawn for every trip a person, or an item, makes during a process. The tangle of lines looks like spaghetti.
It shows wasted walking and carrying at a glance.
When to use it When people walk or move things a lot during their work, or a layout feels awkward.
Why it works Movement feels like work, so nobody notices it. A drawing makes it visible and easy to discuss.
Do Follow the person for long enough: a full cycle of their work. Show the before and after drawings side by side. Don't Watching too short a period to see the pattern. Making it about one person's habits rather than the layout. Step by step Get a floor plan A simple sketch is enough.
Choose who or what to follow One person or one item, for a set period.
Draw every trip From where they start to where they go.
Count and estimate distance
Ask why Why is each trip needed?
Redesign and redraw Move things closer, then compare.
PreviewSpaghetti diagram Lean and improvement People walk or carry things a lot during their work. 6 Used by Process Improvement Specialist Lean and improvement · cheat sheet Standard work A short description of the current best way to do a task, agreed by the people who do it, kept at the workplace, and updated when a better way is found.
Common practice 5 steps Used by Process Improvement Specialist
What it is Standard work is the current best method for a task, written briefly, agreed by the people who do it, and kept where the work happens.
When to use it When a new way of working must be done the same way by everyone, and as the base for further improvement.
Why it works Consistent methods give consistent results, make training easier, and give a clear starting point for the next improvement.
Do Photos beat words. Standard work is meant to change when someone finds a better way. Don't Long procedures nobody reads. Written by managers without the people who do the work. Never updated. Step by step Agree the best method
One page
At the workplace
Train and check
Update
PreviewStandard work Lean and improvement A task must be done the same, best way by everyone. 5 Used by Process Improvement Specialist Lean and improvement · cheat sheet The eight wastes Eight common kinds of work that use time or money without helping the customer, used to spot and sort waste in any process.
Common practice 5 steps Used by Process Improvement Specialist
What it is Waste is anything that uses time, effort or money without making things better for the customer.
Eight kinds turn up in almost every kind of work: waiting, extra processing, unnecessary movement, unnecessary transport, rework and errors, overproduction, excess stock and unused talent.
When to use it After watching a process, to sort what you saw, or during a walk to train your eye.
Variations Seven wastes The original list, without unused talent.Failure demand A service version: work caused by not doing something right the first time.Why it works Naming the waste trains your eye. Sorting observations into the eight kinds shows which ones cost the most.
Do Don't argue about the category; agree it's waste and move on. Remember that waste is in the process; the people doing it usually hate it too. Don't Arguing about which category something belongs to instead of removing it. Treating every non-value step as waste, including legally required ones. Blaming the people who do the wasteful work. Step by step Learn the eight Use everyday examples from your own area.
Observe Walk the process or use your notes.
Tag Give each observation one kind of waste.
Count See which kinds dominate.
Ask why Find what causes the biggest group before fixing anything.
PreviewThe eight wastes Lean and improvement You've watched a process and want to sort where the time goes. 5 Used by Process Improvement Specialist Lean and improvement · cheat sheet Value stream map A map of a process that adds the working time and waiting time of each step, showing the total lead time and how little of it adds value.
Common practice 6 steps Used by Process Improvement Specialist
What it is A value stream map adds time to a process map: working time per step, waiting time between steps, and totals for lead time and value-added time.
It often includes takt time: the pace customers demand.
When to use it When customers wait much longer than the work takes, and you need to see where the time goes.
Why it works It shows, in one picture, that most of the time customers wait is not work at all.
Do Use real averages from data, not what people think. Show the timeline as a ladder under the map: work up, waits down. Don't Using best-case times instead of real averages. Leaving out waits because nobody owns them. Drawing it once and never using it. Step by step Pick 5 to 10 steps
Record times Working time and the wait before the next step.
Add the totals Lead time and value-added time.
Efficiency Value-added ÷ lead time.
Takt time Available time ÷ demand; compare with cycle times.
Mark the biggest waits
PreviewValue stream map Lean and improvement Customers wait far longer than the work itself takes. 6 Used by Process Improvement Specialist Lean and improvement · cheat sheet Value-added analysis Sorting every step of a process into value-adding, needed but not value-adding, and waste, then measuring how much of the time adds value.
Common practice 6 steps Used by Process Improvement Specialist
What it is Every step in a process is sorted into three groups: value-adding (the customer would gladly pay or wait for it), required but not value-adding (needed for legal, safety or business reasons), and waste.
Dividing the value-adding time by the total time shows how much of the process actually helps the customer.
When to use it When a process takes far longer than the work in it, and you want to show where the time goes.
Why it works It shows, with numbers, how much time is lost and where. That usually changes the conversation from “work harder” to “remove the waits”.
Do Ask a real customer what they value, rather than guessing. Waits count as steps. Don't Calling steps value-adding because staff are busy doing them. Removing required steps without checking why they exist. Step by step List the steps In order, with times, including waits.
Test each step Does it change something the customer cares about?
Mark required steps Check why they're required.
Mark the rest as waste
Calculate Value-adding time ÷ total time.
Act Remove waste, reduce required steps, protect value.
PreviewValue-added analysis Lean and improvement A process takes far longer than the work inside it. 6 Used by Process Improvement Specialist Metrics · cheat sheet Useful team metrics (and velocity traps) Measures that help a team improve, and the common ways velocity gets misused.
Common practice 5 steps Used by Scrum Master, Product Owner
What it is A small set of measures a team uses to understand and improve how it works: for example throughput, cycle time, quality and satisfaction.
When to use it When leaders ask for numbers, or the team wants to see if changes helped.
Why it works Measures show trends and the effect of changes; they turn improvement into evidence instead of opinion.
Do When a measure becomes a target, it stops being a good measure. Don't Rewarding higher velocity: estimates simply grow. Comparing teams' velocity. Step by step Ask what you want to improve Speed, predictability, quality, wellbeing?
Choose a few measures Three to five.
Collect them simply Ideally automatically.
Look at trends together In reviews.
Never use them to compare or punish That makes people game them.
PreviewUseful team metrics (and velocity traps) Metrics A team wants evidence of whether its changes help. 5 Used by Scrum Master, Product Owner Monitoring and control · cheat sheet Change board The agreed group or person that decides on changes beyond the project manager's authority, based on impact and options.
Common practice 5 steps Used by Project Manager
What it is The agreed person or group that decides on changes beyond the project manager's authority, based on impact and options.
When to use it Set up in planning; meets when a change needs a decision, or at regular intervals.
Why it works It makes sure significant changes are decided by the right people, consistently, and recorded.
Do Batch small changes for regular meetings; urgent ones can be decided by email with a record. Don't Every small change going to the board. Decisions taken outside the board, then reported. Step by step Define authority levels Project manager within tolerance; board above it.
Choose members Sponsor, user side, supplier side where relevant.
Decide on evidence Impact analysis and options.
Record decisions and reasons In the change log.
Make sure updates happen Plans, baselines, contracts, communication.
PreviewChange board Monitoring and control A change is beyond the project manager's authority. 5 Used by Project Manager Monitoring and control · cheat sheet Earned value A way to measure progress objectively by comparing the work planned, the work actually done (valued at its budget) and what it actually cost.
Common practice 6 steps Used by Project Manager
What it is Earned value compares three numbers at a point in time: planned value (the budgeted cost of the work planned by now), earned value (the budgeted cost of the work actually done) and actual cost (what that work really cost).
From them come two simple indices: schedule performance (EV ÷ PV) and cost performance (EV ÷ AC). Below 1 means behind schedule or over cost.
When to use it Throughout executing, at each reporting period, on any project with a time-phased budget.
Variations Earned schedule expresses schedule performance in time units instead of money.Burn-up chart a visual cousin used in agile work.Why it works Comparing money spent with money planned says nothing about progress: you might have spent less because nothing happened. Earned value ties money to the work actually done.
It gives an early, objective warning, and a way to forecast the final cost while there's still time to act.
Do Agree the progress rules before work starts; arguments about “percent complete” ruin earned value. Show the trend, not just one point: three periods of falling CPI say more than one low number. Don't Measuring progress by money spent. Guessing percent complete instead of using clear rules (for example 0/100 or 50/50 per task). Step by step Make a time-phased budget Each piece of work has a budget and a planned time. Adding them up by period gives the planned value curve.
Agree how to measure progress Use simple rules per task: 0/100 (counts only when done), 50/50 (half when started), or measured milestones. Avoid guessing percentages.
At each reporting date, collect three numbers PV from the plan, EV from the progress rules, AC from finance.
Calculate the indices SPI = EV ÷ PV, CPI = EV ÷ AC. Also the variances: SV = EV − PV, CV = EV − AC.
Forecast the finish Estimate at completion: if past overruns were one-offs, AC + (budget − EV). If they'll continue, budget ÷ CPI.
Act on it Look for causes behind low indices, report honestly, and decide on actions before the gap grows.
PreviewEarned value Monitoring and control You need to know if you're really on schedule and on budget. 6 Used by Project Manager Monitoring and control · cheat sheet Impact analysis Working out what a proposed change does to scope, time, cost, quality, risk and other work before anyone decides.
Common practice 5 steps Used by Project Manager
What it is Working out what a proposed change does to scope, time, cost, quality, risk and other work before anyone decides.
When to use it For every change request, and for operational requests that might touch the project.
Why it works Changes that look small often have hidden knock-on effects. Knowing the impact makes decisions fair and fast.
Do Include the impact of not making the change. Don't Deciding first and assessing afterwards. Missing knock-on effects on other teams or suppliers. Step by step Describe the change and the reason Clearly.
Ask the people who'll do the work For time and cost.
Check knock-on effects Critical path, other teams, contracts, risks, benefits.
Prepare options Now, later, differently, or not at all.
Recommend one And send it to the right decision-maker.
PreviewImpact analysis Monitoring and control Someone asks for a change and you need its real cost before deciding. 5 Used by Project Manager Monitoring and control · cheat sheet RAG status Showing status as red, amber or green per area, using rules everyone has agreed, so the colour means the same to everyone.
Common practice 5 steps Used by Project Manager
What it is Showing status as red, amber or green per area, using rules everyone has agreed, with a one-line reason.
When to use it In status reports and dashboards, every reporting period.
Why it works It gives leaders a quick, comparable view, but only if the colours mean the same thing to everyone.
Do A watermelon (green outside, red inside) report destroys trust when it's discovered. Don't “Watermelon” reports: green outside, red inside. Colours without reasons. Step by step Agree the rules Green: on plan. Amber: off plan, recoverable within tolerance, with a plan. Red: beyond tolerance or needs a decision.
Rate each area Scope, time, cost, quality, risk.
Add a reason Always one line why.
Report the rule's colour Not the comfortable one.
Watch trends Amber for many weeks is a warning too.
PreviewRAG status Monitoring and control Leaders need a quick, honest view of status they can trust. 5 Used by Project Manager Organisation and impediments · cheat sheet Dependency board A shared, visible map of what each team needs from others, and when.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is A visual board showing which teams or suppliers are waiting for which others, and when.
When to use it As soon as two or more teams depend on each other.
Why it works Dependencies between teams are where most delays hide. Seeing them early lets you plan handovers instead of discovering gaps.
Do A three-week look-ahead is often enough to avoid most surprises. Don't Discovering dependencies at integration time. Step by step List teams or suppliers Across the top or side.
Add each dependency Who needs what from whom, by when.
Draw the links Strings, lines or arrows.
Review weekly In a short coordination meeting.
Flag the at-risk ones And escalate early.
PreviewDependency board Organisation and impediments Several teams or suppliers wait on each other. 5 Used by Scrum Master, Project Manager Organisation and impediments · cheat sheet Escalating impediments Move a blocker to the people who can decide, with the impact made clear, quickly and openly.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is An agreed route for problems a person or team can't solve themselves: who to go to, how quickly, and with what information.
When to use it When the team can't remove an impediment on its own.
Why it works Without a clear path, problems either sit unsolved or jump straight to the top. A good path gets decisions at the right level, fast.
Do Escalating isn't failing; waiting too long is. Don't Escalating everything, so nobody listens. Workarounds that hide the problem. Step by step Define levels Team → project manager → sponsor or board.
Set triggers Time (stuck for two days), size (beyond tolerance), type (safety, legal).
Agree response times For example same day, two days.
Escalate with options Problem, impact, options, recommendation.
Record outcomes In the issue or decision log.
PreviewEscalating impediments Organisation and impediments A problem is beyond what you or your team can solve. 5 Used by Scrum Master, Project Manager Organisation and impediments · cheat sheet Scrum of Scrums A short regular meeting where people from several teams coordinate shared work and dependencies.
Common practice 4 steps Used by Scrum Master
What it is A short, regular meeting where representatives of several teams working on one product coordinate dependencies and blockers.
When to use it When several teams work on one product or depend on each other.
Why it works It keeps several teams aligned without everyone attending everything.
Do Keep it about the teams' coordination, not individual status. Don't A long status meeting nobody needs. Step by step Each team sends a representative Often someone who knows the work.
Meet briefly and regularly Two or three times a week, 15 minutes.
Focus on cross-team issues What we need from you, what might affect you.
Record and follow up Blockers get owners.
PreviewScrum of Scrums Organisation and impediments Several teams work on one product and must coordinate. 4 Used by Scrum Master Prioritisation · cheat sheet Buy a feature Stakeholders get a limited budget to “buy” features, which reveals what they really value when they must choose.
Common practice 5 steps Used by Product Owner
What it is A prioritisation game: stakeholders get a limited budget of play money and “buy” features priced by their cost. Expensive features need people to pool money.
When to use it When several stakeholders all say their item is the top priority.
Why it works It forces trade-offs and reveals what people really value when they can't have everything. Pooling money creates useful discussion.
Do Keep budgets tight; generous budgets remove the trade-offs. Don't Treating the result as a vote that decides the order. Step by step Price the features Roughly by cost or effort.
Give each player a budget Enough for about a third of the features in total.
Let them buy Alone or by pooling money; they must explain pooled purchases.
Listen The conversations matter more than the result.
Use the result as input The accountable person still decides.
PreviewBuy a feature Prioritisation Stakeholders must make real trade-offs between features they all want. 5 Used by Product Owner Prioritisation · cheat sheet Dot voting Each person gets a few dots to place on the options they think matter most.
Common practice 5 steps Used by Product Owner, Scrum Master
What it is Everyone gets a few dots (for example 3) and places them on the options they prefer. The dots show the group's preferences quickly.
When to use it To narrow down many options quickly in a workshop.
Why it works It's fast, includes everyone, and turns a long discussion into a visible result in minutes.
Do Dot voting shows preference, not value; combine it with facts for big decisions. Don't Popular isn't always valuable. Letting the vote override the Product Owner's accountability. Step by step Make the options clear Each on its own card.
Give each person the same number of dots Usually about a third of the number of options.
Agree the rules Can people stack dots on one option?
Vote at the same time To reduce copying.
Discuss the result Especially close calls and options with no dots.
PreviewDot voting Prioritisation A group needs to see its preferences in minutes. 5 Used by Product Owner, Scrum Master Prioritisation · cheat sheet Kano model Customers react differently to basics they expect, performance they value more of, and surprises that delight.
Common practice 5 steps Used by Product Owner, Process Improvement Specialist
What it is The Kano model sorts features by how they affect satisfaction: basics people expect (missing them causes anger), performance features (more is better) and delighters (unexpected pleasures).
When to use it When deciding which features customers expect versus which would set the product apart.
Why it works It shows that not all features are equal: basics must be there, but adding more of them doesn't please anyone, while a small delighter can stand out.
Do Ask real users; teams often misjudge what's basic. Don't Delighters become basics over time, so revisit the categories. Step by step List candidate features From research, requests and ideas.
Ask users two questions per feature How would you feel if it were there? And if it weren't?
Classify Basic, performance, delighter, indifferent.
Plan the mix All basics first, enough performance to compete, a few delighters.
Re-check over time Today's delighter becomes tomorrow's basic.
PreviewKano model Prioritisation You need to know which features users expect, value or love. 5 Used by Product Owner, Process Improvement Specialist Prioritisation · cheat sheet MoSCoW Sort items for a release or goal into Must have, Should have, Could have and Won't have this time.
Common practice 6 steps Used by Product Owner, Project Manager
What it is A way to sort requirements into four groups: Must have, Should have, Could have and Won't have (this time). It forces honest choices about what really matters.
When to use it For a fixed date or release, to agree what is truly essential. Less useful for ordering a whole backlog one item at a time.
Why it works When everything is “high priority”, nothing is. MoSCoW makes trade-offs explicit and agreed, so that when time or money is short, everyone already knows what gives way.
Do Ask “what if we don't?” for every must. Won't doesn't mean never; date it or link it to a later stage. Don't Everything becomes a Must. Treating “Won't” as “never” instead of “not this time”. Step by step Agree what “must” means Must = without it, the result is useless, unsafe or illegal. Everything else is not a must.
List the requirements One per line, clear enough that people agree what each means.
Sort them together With the users and decision-makers. Challenge every must: “What happens if we don't have it?”
Check the balance A common rule: musts use no more than about 60% of the effort, so there is room to absorb surprises.
Record the won'ts Write down what is not included this time, and why. It prevents the same debate later.
Revisit at each stage Priorities change; re-sort when they do.
PreviewMoSCoW Prioritisation Everything is called a priority and time or money is fixed. 6 Used by Product Owner, Project Manager Prioritisation · cheat sheet Value vs effort Place items on a simple grid of how valuable they are against how much effort they take.
Common practice 5 steps Used by Product Owner, Project Manager
What it is A simple 2×2 grid: value on one axis, effort on the other. Items land in four boxes: quick wins (high value, low effort), big bets, fill-ins and time sinks.
When to use it As a first, fast sort of a messy backlog, and to explain ordering to stakeholders visually.
Why it works It makes trade-offs visible at a glance, so a group can agree what to do first without long debates.
Do Effort estimates should come from the people who'd do the work. Don't Forgetting dependencies: a quick win may need something else first. Letting the loudest stakeholder decide where “value” sits. Step by step List the options Features, improvements or ideas, one per card.
Agree what value means For example revenue, customer impact, risk reduced.
Score value and effort Rough is fine: low, medium, high.
Place them on the grid Discuss outliers.
Decide Quick wins first, plan big bets carefully, fit fill-ins where there's room, drop time sinks.
PreviewValue vs effort Prioritisation You must pick quickly among many options with limited capacity. 5 Used by Product Owner, Project Manager Prioritisation · cheat sheet WSJF and cost of delay Do first what loses the most value per week of waiting, divided by how long it takes.
Common practice 5 steps Used by Product Owner, Project Manager
What it is Weighted Shortest Job First: rank work by the cost of waiting divided by its size. Things that lose a lot of value by waiting, and are small, go first.
When to use it When several big items compete and waiting has a real cost, for example a competitor or a deadline.
Why it works It adds the cost of delay to prioritisation. A small, urgent item can be worth more now than a big valuable one later.
Do Use relative numbers (like 1, 2, 3, 5, 8, 13), not money, unless you really know it. Don't Fake precision: the scores are rough relative guesses. Using it for small items where a quick conversation is faster. Step by step Estimate the cost of delay Often as the sum of three relative scores: value to users, time criticality, and risk reduction or opportunity.
Estimate the size Relative size or duration.
Divide WSJF = cost of delay ÷ size.
Rank by the result Highest first.
Re-score regularly Time criticality changes, especially near deadlines.
PreviewWSJF and cost of delay Prioritisation Waiting costs differ between items and you must choose what goes first. 5 Used by Product Owner, Project Manager Problem-solving · cheat sheet 5 Whys Ask “why?” several times to get from a symptom to the cause you can actually fix.
Common practice 6 steps Used by Scrum Master, Project Manager, Process Improvement Specialist
What it is A simple way to find the root cause of a problem: ask “why?” about the problem, then about the answer, and so on, until you reach a cause you can fix in the process.
When to use it When the same problem keeps coming back.
Variations Fishbone diagram for problems with several possible causes.Fault tree for complex technical failures.Why it works Most first answers are symptoms. Fixing symptoms means the problem returns. Asking why several times moves the discussion from people to the system they work in.
Do Do it with the people closest to the work. Several answers at one step? Follow each branch. Don't Stopping at a person (“because Abel (IT Operations Manager) didn't…”) instead of a process. Step by step Write the problem clearly One specific sentence: what happened, where, how often. Not “quality is bad”.
Ask why it happened Write the answer as a fact you can check.
Ask why again, about that answer Repeat. Five is a guide; stop when you reach something in the process you can change.
Check the chain Read it backwards with “therefore”. If it doesn't make sense, a step is missing or wrong.
Agree a fix for the root cause Give it an owner and a date. Then check later whether the problem stopped.
Keep it blameless If the answer is a person, ask why the process allowed it.
Preview5 Whys Problem-solving A problem keeps coming back after you fix it. 6 Used by Scrum Master, Project Manager, Process Improvement Specialist Problem-solving · cheat sheet Blameless review Look at what went wrong by asking how the system allowed it, not who to blame.
Common practice 6 steps Used by Scrum Master, Project Manager, Process Improvement Specialist, Product Owner
What it is A review of something that went wrong that focuses on how the system and process allowed it, not on who to blame.
When to use it After a failure, a shortcut that backfired, or an incident.
Why it works When people fear blame, they hide problems. Blameless reviews surface the real causes and lead to lasting fixes.
Do “Human error” is a starting point, not a conclusion. Don't Saying “blameless” but still naming a culprit. Step by step State the purpose Learning, not blaming.
Build a timeline What happened, in order, from all perspectives.
Ask how, not who How did the process allow this?
Find contributing causes Usually several.
Agree improvements With owners and dates.
Share the learning So others benefit.
PreviewBlameless review Problem-solving Something went wrong and you want to fix the process, not find a culprit. 6 Used by Scrum Master, Project Manager, Process Improvement Specialist, Product Owner Problem-solving · cheat sheet Fishbone diagram A diagram that groups possible causes of a problem into categories, to look at it from every side.
Common practice 6 steps Used by Scrum Master, Project Manager, Process Improvement Specialist
What it is A diagram that looks like a fish skeleton: the problem is the head, and the bones are categories of possible causes, such as people, process, materials, equipment, environment and measurement.
When to use it For bigger problems with many possible causes.
Why it works It helps a group explore many possible causes systematically, instead of jumping to the first explanation.
Do Check causes with evidence before acting. Don't Listing causes without checking any. Step by step Write the problem at the head Specific and factual.
Draw the main bones Choose categories that fit your work.
Brainstorm causes on each bone Ask “why could this happen?”.
Dig deeper Add smaller bones for causes of causes.
Check the likely ones With data or tests.
Fix the root cause And check it worked.
PreviewFishbone diagram Problem-solving A problem may have several causes and you want to explore them all. 6 Used by Scrum Master, Project Manager, Process Improvement Specialist Problem-solving · cheat sheet Pareto chart A bar chart of problems grouped by cause, sorted from most to least frequent, showing the few causes behind most problems.
Common practice 5 steps Used by Project Manager, Process Improvement Specialist
What it is A bar chart of problems grouped by cause, sorted from most to least frequent, often with a line showing the cumulative percentage.
When to use it When there are many defects or complaints and you need to decide where to start.
Why it works It shows the few causes behind most problems, so you fix what matters most first.
Do Don't ignore a rare but severe problem just because its bar is short. Don't Grouping by symptom instead of cause. Ignoring a rare but severe problem because it's small on the chart. Step by step Collect problems Over a defined period.
Group by cause Not by symptom.
Count and sort Largest first.
Draw bars and the cumulative line Often 2 or 3 causes cover most problems.
Fix the top causes Then measure again.
PreviewPareto chart Problem-solving There are many problems and you need to know which causes matter most. 5 Used by Project Manager, Process Improvement Specialist Procurement · cheat sheet Contract types The main ways to pay a supplier, which decide who carries the cost risk: fixed price, time and materials, or cost plus a fee.
Common practice 5 steps Used by Project Manager
What it is The main ways to pay a supplier, each putting cost risk in a different place: fixed price (supplier carries it), time and materials (buyer carries it), cost-reimbursable plus fee (shared, often with incentives).
When to use it When planning what to buy, before the tender.
Variations Fixed price with economic price adjustment for long contracts where material prices may change.Target cost with shared savings buyer and supplier share any savings or overruns.Why it works Choosing the wrong type causes padded prices, endless claims or runaway costs. The right type fits how well the scope is known.
Do Fixed price on vague scope isn't safe; it's expensive. Don't Fixed price on unclear scope: big buffers and endless claims. Open time and materials with no cap. Step by step Ask how clear the scope is Clear → fixed price; unclear → time and materials or cost-reimbursable.
Ask who can best manage the risk Put the risk where it can be controlled.
Add protections Caps on time and materials, milestones and acceptance on fixed price, incentives where useful.
Define changes How changes are priced and approved.
Write acceptance and payment terms Pay against accepted deliverables.
PreviewContract types Procurement You're about to buy work and must decide who carries the cost risk. 5 Used by Project Manager Procurement · cheat sheet Make or buy Deciding whether to do work in-house or buy it, by comparing whole-life cost, time, risk, skills and support.
Common practice 6 steps Used by Project Manager
What it is Deciding whether to do work in-house or buy it from outside, by comparing whole-life cost, time, risk, skills and support.
When to use it In planning, for every major piece of work or product.
Why it works The cheapest-looking option often isn't. A structured comparison avoids building what you should buy, or buying what you should keep in-house.
Do Include the cost of your own people's time when you “make”. Don't Comparing only the purchase price. Building because the team wants to, not because it's better. Step by step Describe what's needed The need, not a solution.
List options Make, buy, or a mix (buy and adapt).
Compare whole-life cost Not just the purchase: running, maintenance, support over years.
Compare time, risk and skills Can you do it? How fast? What could go wrong?
Consider strategy Is it core knowledge to keep in-house?
Decide and record why For later audits and lessons.
PreviewMake or buy Procurement You could do work in-house or buy it and must choose. 6 Used by Project Manager Procurement · cheat sheet Procurement review A short review at the end of a contract of how the buying went: what worked, what didn't, and what to change next time.
Common practice 5 steps Used by Project Manager
What it is A short review, at the end of a contract or project, of how the buying went: what worked, what didn't, and what to change next time.
When to use it When contracts close, before the project closes.
Why it works Buying mistakes repeat if nobody records them. The review also checks that records are complete for audits and warranties.
Do Include the supplier's view; they often know what made things hard. Don't Skipping it because the work is done. Only blaming the supplier. Step by step Gather evidence Contract, change log, supplier reviews, claims.
Review each step Choice of contract type, tender, managing the contract, closing.
Note what to keep and change Specific recommendations.
Check records are complete And archived.
Share the lessons With procurement and future projects.
PreviewProcurement review Procurement A contract ends and the next purchase should be better. 5 Used by Project Manager Procurement · cheat sheet Supplier scorecard A regular, evidence-based score of a supplier against agreed measures, discussed with the supplier to agree improvements.
Common practice 5 steps Used by Project Manager
What it is A regular, evidence-based score of a supplier on agreed measures, discussed with them to agree improvements.
When to use it Monthly or at milestones for every major supplier.
Why it works It keeps supplier conversations factual, catches problems early, and turns complaints into actions.
Do Recognise good performance too; suppliers respond to it. Don't Scores without evidence. Using the scorecard only to punish. Step by step Agree measures at the start Time, quality, safety, communication, cost.
Score 1 to 5 with evidence Dates, inspection results, incidents.
Share before meeting No surprises.
Discuss strengths and gaps Both.
Agree actions With owners and dates; check next time.
PreviewSupplier scorecard Procurement A supplier's performance needs a regular, fact-based conversation. 5 Used by Project Manager Procurement · cheat sheet Tender evaluation Choosing a supplier fairly by scoring every bid against published criteria, with conflicts of interest declared.
Common practice 6 steps Used by Project Manager
What it is Choosing a supplier fairly by scoring every bid against criteria and weights published in advance, with conflicts of interest declared.
When to use it After bids arrive, before a contract is signed.
Why it works It leads to the best value, protects against favouritism, and can be defended if a losing bidder complains.
Do Never change the criteria after seeing the bids. Don't Changing criteria after seeing the bids. Undeclared relationships with bidders. Step by step Publish criteria and weights With the request for bids: for example price 40%, experience 20%, method 25%, timeline 15%.
Declare conflicts of interest Anyone with a link to a bidder steps out.
Score independently Each panel member first, then agree together.
Check value, not just price The lowest price may be the highest risk.
Record scores and reasons And the decision.
Debrief unsuccessful bidders Honestly and briefly.
PreviewTender evaluation Procurement Several suppliers bid and the choice must be fair and defensible. 6 Used by Project Manager Quality · cheat sheet Control chart A chart of a measure over time (for example defects per test cycle), with an average line and limits, showing whether a process is stable or changing.
Common practice 5 steps Used by Project Manager, Process Improvement Specialist
What it is A chart of a measure over time with an average line and upper and lower limits, showing whether a process is stable or changing.
When to use it When you measure something repeatedly and want to know if changes are real or just noise.
Why it works It separates normal variation from real change, so you don't overreact to noise or miss a real drift.
Do Don't change the process after every bad point; look for patterns. Don't Reacting to every small change. Ignoring a steady drift. Step by step Pick a regular measure Defects per cycle, waiting time per day.
Plot points over time In order.
Draw the average And limits (often average ± 3 standard deviations).
Look for signals Points outside limits, seven or more in a row on one side, steady trends.
Investigate signals only Leave normal variation alone.
PreviewControl chart Quality You measure something regularly and want to know if changes are real. 5 Used by Project Manager, Process Improvement Specialist Quality · cheat sheet Cost of quality Comparing what you spend on preventing and checking for defects with what failures cost when they're found late or after handover.
Common practice 5 steps Used by Project Manager, Process Improvement Specialist
What it is Comparing the cost of preventing and checking for defects with the cost of failures: rework, delays, complaints, warranty claims.
When to use it When planning quality and when defects keep appearing.
Why it works Failures found late are much more expensive than prevention. Seeing the full cost justifies investing in getting it right first time.
Do Failure costs are often hidden; ask the people who do the rework. Don't Cutting reviews to save time, then paying for rework. Only counting the costs you can see. Step by step List prevention costs Training, clear requirements, design reviews.
List appraisal costs Inspections, testing, audits.
List internal failure costs Rework and delays before handover.
List external failure costs Complaints, fixes after handover, reputation.
Compare and decide Where would more prevention save money overall?
PreviewCost of quality Quality Defects keep costing time and you're weighing prevention against fixing. 5 Used by Project Manager, Process Improvement Specialist Quality · cheat sheet Inspection and testing Checking a deliverable against its requirements by looking, measuring or testing, and recording what passes and what must be fixed.
Common practice 6 steps Used by Project Manager
What it is Checking a deliverable against its requirements by looking, measuring or testing, and recording what passes and what must be fixed.
When to use it At planned points throughout the work, before work is covered up or handed over, and before acceptance.
Variations Testing for systems: unit, integration, user acceptance.Audit checks that processes are followed (quality assurance).Why it works Defects found early are cheap to fix. Inspections at the right moments prevent costly rework later.
Do Inspect before work is hidden; after, fixes cost ten times more. Don't Inspecting only at the very end. Checklists that don't link to requirements. Step by step Plan inspection points Especially before work is covered up or handed over.
Use a checklist from the requirements Each check linked to a requirement.
Inspect and record Pass or fail, with evidence.
Log defects With an owner and a fix date.
Re-inspect fixes Before closing.
Look for patterns Repeated defects mean a process problem.
PreviewInspection and testing Quality Work must be checked against requirements before it's covered up or accepted. 6 Used by Project Manager Quality · cheat sheet Run chart A line chart of a measure in time order, with the median drawn across it, showing trends, shifts and patterns that a single number hides.
Common practice 6 steps Used by Process Improvement Specialist
What it is A line chart of one measure in time order, with a horizontal line at the median.
It shows how a process behaves over time: steady, drifting, shifting or repeating.
When to use it Whenever you have repeated measurements over time and want to see how the process behaves before analysing it further.
Variations Control chart Adds limits calculated from the data, to tell everyday variation from unusual events.Why it works Averages and totals hide patterns. A run chart is the simplest way to see them before deciding what to do.
Do Note events on the chart: a new rule, a holiday, a staff change. Don't redraw the median after every point. Don't Reacting to every single high or low point. Too few points to see a pattern; aim for at least 20. Changing how the measure is collected halfway through. Step by step Collect in time order Daily, weekly or per item.
Plot the points Joined by a line.
Draw the median Half the points above, half below.
Look for patterns A run of 6 or more on one side, 5 or more steadily up or down, a repeating cycle.
Ask what happened Before acting.
Keep plotting To see whether a change worked.
PreviewRun chart Quality You have repeated measurements and want to see the pattern over time. 6 Used by Process Improvement Specialist Quality · cheat sheet Version control Keeping one register of the current versions of key documents, drawings and settings, withdrawing old versions and making sure everyone uses the latest.
Common practice 6 steps Used by Project Manager
What it is Keeping one register of the current versions of key documents, drawings and settings, approving changes before new versions are issued, and withdrawing old versions.
When to use it Whenever several people or suppliers work from the same documents.
Why it works When several people or suppliers work from copies, someone will use an old one. Version control prevents costly mistakes and rework.
Do Mark old printed copies “superseded” or remove them from site. Don't Versions emailed around with no register. Old copies left on site. Step by step List what's controlled Drawings, specifications, plans, system settings.
Number versions and set statuses Draft, approved, withdrawn.
Keep one register The single source everyone checks.
Approve changes first Linked to change control.
Withdraw old versions And confirm everyone has the latest.
Audit occasionally Spot-check what's actually in use.
PreviewVersion control Quality Several people work from documents or drawings that keep changing. 6 Used by Project Manager Retrospectives · cheat sheet 4Ls: Liked, Learned, Lacked, Longed for Four prompts that bring out both feelings and lessons from the Sprint.
Common practice 5 steps Used by Scrum Master
What it is A review format with four columns: Liked, Learned, Lacked, Longed for.
When to use it When a team's Retrospectives feel repetitive, or after a Sprint with a lot of learning.
Why it works It balances positive and negative, and the “learned” column captures insights that other formats miss.
Do Read “learned” notes aloud; they're often the most valuable. Don't Spending all the time on Liked. Step by step Explain the four columns Liked, Learned, Lacked, Longed for.
Write notes silently A few minutes.
Read and cluster Group similar notes.
Discuss the biggest clusters Especially lacked and longed for.
Agree actions One or two, with owners.
Preview4Ls: Liked, Learned, Lacked, Longed for Retrospectives You want a balanced review that captures what was learned. 5 Used by Scrum Master Retrospectives · cheat sheet Mad, Sad, Glad A format about how the Sprint felt, useful when emotions are getting in the way of work.
Common practice 5 steps Used by Scrum Master
What it is A review format focused on feelings: what made people mad, sad or glad during the period.
When to use it After a stressful Sprint, conflict or pressure, when facts alone won't move the team forward.
Why it works Emotions affect how people work. Naming them openly can surface problems that factual formats miss, especially after a hard period.
Do Use it when the mood is low; skip it if trust is too weak for honesty. Don't Turning it into blaming people. Skipping to solutions before people feel heard. Step by step Set safety first Agree it's about events, not individuals.
Write notes in the three columns Silently.
Share and listen Without arguing with feelings.
Find themes What's behind the mad and sad notes?
Agree actions For one or two themes.
PreviewMad, Sad, Glad Retrospectives After a hard period, feelings need space before facts. 5 Used by Scrum Master Retrospectives · cheat sheet Retrospective actions that stick Turn Retrospective ideas into one or two small, specific changes, and check them next time.
Common practice 5 steps Used by Scrum Master
What it is Turning review ideas into a few concrete improvement actions with owners and dates, and checking them next time.
When to use it At the end of every Retrospective, and at the start of the next one.
Why it works Reviews without follow-through make people cynical. A small number of real actions shows that reviews change things.
Do “Communicate better” is not an action; “share notes within 24 hours” is. Don't Vague actions like “communicate better”. Never checking whether last Sprint's change worked. Step by step Choose one or two From the most important themes.
Make each specific What exactly, who, by when.
Make it visible On the team board or in the plan.
Check at the next review Done? Did it help?
Keep, adjust or drop Based on the result.
PreviewRetrospective actions that stick Retrospectives Reviews produce ideas but nothing changes afterwards. 5 Used by Scrum Master Retrospectives · cheat sheet Sailboat A picture of a boat: wind pushes it forward, anchors hold it back, rocks are risks ahead, the island is the goal.
Common practice 5 steps Used by Scrum Master
What it is A visual review: a boat sailing to an island. Wind is what helps, anchors are what slow you down, rocks are risks ahead, and the island is the goal.
When to use it To make a stuck or tired team talk more openly; the picture lowers the tension.
Why it works The picture makes it easier to talk about risks and obstacles, and is a gentle way for quieter people to contribute.
Do It also works as a quick risk workshop. Don't Spending the session drawing instead of deciding. Step by step Draw the picture Boat, island (goal), wind, anchors, rocks.
Add notes silently Each in the right area.
Discuss anchors and rocks Which slow us most? Which could hurt us?
Strengthen the wind What helps us that we could do more of?
Agree actions Lift one anchor, avoid one rock.
PreviewSailboat Retrospectives A team should talk about goals, obstacles and risks in a gentle way. 5 Used by Scrum Master Retrospectives · cheat sheet Start, Stop, Continue Three columns: what we should start doing, stop doing and keep doing.
Common practice 6 steps Used by Scrum Master, Project Manager
What it is A simple review format with three questions: what should we start doing, stop doing, and continue doing?
When to use it A good first format for a new team: simple, quick and easy to explain.
Why it works It's quick, easy for new groups, and leads straight to actions rather than general complaints.
Do Limit actions to one or two; long action lists rarely get done. Don't Ending with a long list and no action. Using the same format for months until it goes stale. Step by step Set the scene Remind people of the period and the goal; agree it's about the process, not blame.
Collect ideas silently Everyone writes notes under start, stop and continue.
Share and group Read notes aloud and cluster similar ones.
Vote on what matters most For example with dots.
Agree one or two actions With an owner and a date.
Check the actions next time Did they help?
PreviewStart, Stop, Continue Retrospectives A group needs a quick, action-focused look back. 6 Used by Scrum Master, Project Manager Retrospectives · cheat sheet Timeline Retrospective Lay out what happened over a longer period on a timeline, then look for patterns.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is A review where the group draws a timeline of the whole period and marks key events, highs and lows, then looks for patterns.
When to use it After several Sprints or a release, when you want the bigger picture.
Why it works It's ideal for long periods or whole projects: it rebuilds a shared memory and shows patterns that single events hide.
Do Invite suppliers and users if they were part of the story. Don't Only looking back, without deciding anything. Step by step Draw a long line From start to end of the period.
Add events Everyone adds what happened, with dates.
Mark highs and lows A mood line above and below.
Look for patterns What came before each low? What caused the highs?
Turn patterns into lessons Recommendations for next time.
PreviewTimeline Retrospective Retrospectives You're reviewing a long period or a whole project. 5 Used by Scrum Master, Project Manager Risk · cheat sheet Expected value and decision trees Multiplying each possible outcome's probability by its impact and adding them up, to compare choices under uncertainty. A decision tree draws the choices, chances and outcomes.
Common practice 5 steps Used by Project Manager
What it is Expected value is probability × impact, added up across the possible outcomes of a choice. A decision tree draws the choices (squares), the chances (circles) and the outcomes, so options can be compared.
When to use it For decisions with uncertain outcomes and significant money at stake.
Why it works It makes decisions under uncertainty clearer and easier to defend, especially when choosing whether to pay now to avoid a possible cost later.
Do Probabilities are estimates; show what happens if they're wrong. Don't Treating guessed probabilities as precise. Ignoring a catastrophic worst case because its expected value is small. Step by step Draw the decision A square with a branch for each option.
Add chance branches Possible outcomes for each option, with probabilities that add up to 100%.
Put a cost or value on each outcome Including the option's own cost.
Calculate Multiply probability × value and add per option.
Compare and sense-check Lowest expected cost, but can we survive the worst case?
PreviewExpected value and decision trees Risk You must choose between options with uncertain costs. 5 Used by Project Manager Risk · cheat sheet Probability-impact matrix A grid that ranks risks by how likely they are and how much they'd hurt (or help), using agreed scales.
Common practice 6 steps Used by Project Manager
What it is A grid that ranks risks by how likely they are and how much they'd affect the objectives, using scales everyone has agreed. Each risk lands in a cell; the colour of the cell suggests how urgently to act.
When to use it After identifying risks, to decide which deserve detailed responses. Repeat at each review.
Why it works Without shared scales, every risk is “high”. Agreed definitions turn opinions into a ranking, so attention goes to the few risks that matter most.
Do Scores are a ranking aid, not precise numbers. Don't let a low score hide a catastrophic but unlikely risk; some deserve a plan anyway. Don't Scales without definitions, so “high” means different things to different people. Treating the score as precise; it's a ranking aid. Step by step Agree the scales For likelihood and impact, define 1 to 5 with concrete examples: “impact 5 = more than a month late or over €100k”.
Score each risk With the people who know the area. Score the risk as it is now, before new responses.
Place them on the grid Likelihood on one axis, impact on the other. Write the risk ID in the cell.
Agree the zones For example: score 15 or more needs a response now, 8 to 14 needs an owner and watching, below 8 can be accepted.
Plan responses for the top ones Then re-score after responses to see the expected effect.
Re-score regularly At each risk review, move risks as things change.
PreviewProbability-impact matrix Risk Every risk is called “high” and you need a fair ranking. 6 Used by Project Manager Risk · cheat sheet Reserve analysis Checking how much contingency and management reserve has been used, how much is left, and whether it still covers the risks that remain.
Common practice 5 steps Used by Project Manager
What it is Checking how much contingency and management reserve has been used, how much is left, and whether it covers the risks still open.
When to use it At every risk review and stage end, and whenever contingency is used.
Why it works Reserves run out quietly. Regular checks show early whether you'll need more, or can release some.
Do Contingency is for risks, not for new scope. Don't Spending contingency on new scope. Not noticing contingency running out until it's gone. Step by step Start from the reserves Contingency (known risks) and management reserve (unknown).
Record each use Which risk or change it paid for.
Compare what's left with open risks Their likely cost.
Release what's no longer needed When risks pass.
Escalate early If it looks too small.
PreviewReserve analysis Risk You need to know if the money set aside for risks is still enough. 5 Used by Project Manager Risk · cheat sheet Risk identification Ways to find what could go wrong (or better than expected) before it happens: brainstorming, checklists, past projects and checking assumptions.
Common practice 6 steps Used by Project Manager
What it is Finding the uncertain events that could affect your objectives, positively or negatively, before they happen.
When to use it From the very start, at every stage and whenever something changes. Not a one-off workshop.
Why it works You can only manage risks you know about. Early identification gives you time and cheap options.
Do “Budget risk” isn't a risk; name the cause and the effect. Don't Writing vague worries (“budget risk”) instead of specific causes and effects. Only looking for threats and missing opportunities. Identifying risks once and never again. Step by step Gather different perspectives Team, users, suppliers, experts.
Use prompts Checklists of common risk areas, past lessons, the assumptions list, the WBS.
Write each risk properly Because of [cause], [event] may happen, which would [effect].
Look for opportunities too Things that could go better than planned.
Give each risk an owner And a first estimate.
Repeat At every stage and when things change.
PreviewRisk identification Risk You're starting, planning or changing course and need to know what could go wrong. 6 Used by Project Manager Risk · cheat sheet Risk responses The ways to deal with a risk before it happens: for threats avoid, transfer, reduce or accept; for opportunities exploit, enhance, share or accept.
Common practice 6 steps Used by Project Manager
What it is The ways to deal with a risk before it happens. For threats: avoid, transfer, reduce or accept. For opportunities: exploit, enhance, share or accept.
When to use it For every significant risk, as soon as it's analysed.
Why it works Different risks need different responses. Choosing deliberately is cheaper than reacting when the risk happens.
Do Adding contingency money is acceptance, not reduction; prefer responses that change the risk. Don't Always choosing “add contingency”. Responses that are never put into the plan. Step by step Start with the highest risks From your ranking.
Consider each strategy Avoid (change the plan), transfer (contract, insurance), reduce (lower likelihood or impact), accept (maybe with money aside).
For opportunities Exploit (make sure), enhance (make likelier), share (with a partner), accept.
Choose and cost the response Is it worth it?
Give it an owner and a date And add it to the plan.
Check if it worked Re-score the risk.
PreviewRisk responses Risk An important risk needs a deliberate plan before it happens. 6 Used by Project Manager Risk · cheat sheet Schedule simulation Running the schedule hundreds of times with each activity's duration picked from its range, to see how likely each finish date is.
Common practice 6 steps Used by Project Manager
What it is Running a schedule or budget model hundreds or thousands of times, each time picking every uncertain value from its range, to see how likely each result is.
When to use it When the board needs a confidence level for a date or budget, on projects with uncertain activities.
Why it works A single date or cost hides uncertainty. Simulation gives honest confidence levels and shows which activities drive the risk.
Do The answer is only as good as the ranges; ask the people who do the work. Don't Presenting the result as more precise than the inputs. Ignoring dependencies between risks. Step by step Give uncertain items ranges Best, likely, worst.
Build the model The schedule logic or cost lines.
Run it many times With a tool or a spreadsheet.
Read confidence levels For example: 50% by date X, 80% by date Y.
Find the drivers Which items affect the result most?
Act and re-run Reduce the biggest uncertainties.
PreviewSchedule simulation Risk The board asks how confident you are about a date or budget. 6 Used by Project Manager Scope and scheduling · cheat sheet Critical path The longest chain of dependent activities through the plan. It sets the end date; activities off it have slack.
Common practice 7 steps Used by Project Manager
What it is The critical path is the longest chain of dependent activities from start to finish. It sets the shortest possible duration of the project.
Activities on it have no slack: if one slips, the end date slips. Activities off it have float, so they can move a little without affecting the end.
When to use it When building or changing a schedule, and whenever someone asks “can we finish earlier?”.
Variations Critical chain adds shared buffers at the end of chains instead of padding each task.Near-critical paths chains with very little float that deserve attention too.Why it works It tells you where to focus. Speeding up a non-critical task doesn't help the end date; protecting critical tasks does.
It also tells you what to say when someone asks “can we finish earlier?”: only by shortening the critical path.
Do Outside dependencies (permits, deliveries, approvals) are often on the critical path and outside your control: book them early. Show the critical path in a different colour on every Gantt chart you share. Don't Missing dependencies, so the path looks shorter than it is. Ignoring near-critical paths with very little slack. Step by step List the activities Use the work breakdown to list activities with a duration estimate each.
Find the dependencies For each activity, ask: what must finish before this can start? Note outside dependencies too, like approvals or deliveries.
Draw the network Boxes for activities, arrows for dependencies. Sticky notes on a wall work well.
Walk forwards From the start, work out the earliest start and finish of each activity. The latest earliest-finish is the project end.
Walk backwards From the end, work out the latest each activity can finish without delaying the end. The difference between latest and earliest is the float.
Mark the zero-float chain Activities with zero float form the critical path. Highlight them in the schedule and watch them most closely.
Recheck when things change A delay on a non-critical task can use up its float and make a new critical path.
PreviewCritical path Scope and scheduling You need to know which activities decide the end date. 7 Used by Project Manager Scope and scheduling · cheat sheet Gantt chart A chart with activities down the side and time across, each activity shown as a bar, often with links and milestones.
Common practice 6 steps Used by Project Manager, Process Improvement Specialist
What it is A bar chart of a schedule: activities down the side, time across the top, each activity a bar from start to finish, often with dependencies and milestones.
When to use it To show and discuss the schedule with the team, the sponsor and suppliers.
Why it works It's the easiest way to show a plan to people: what happens when, what overlaps, and what's critical.
Do Show only as much detail as the audience needs. Don't Drawing bars without dependencies: it looks like a plan but can't be recalculated. Too much detail for the audience. Step by step List activities Grouped by deliverable.
Set durations and dependencies From estimates and logic.
Draw the bars Against a time scale.
Add milestones As diamonds.
Highlight the critical path In a different colour.
Update with progress And show the baseline for comparison.
PreviewGantt chart Scope and scheduling People need to see the schedule at a glance. 6 Used by Project Manager, Process Improvement Specialist Scope and scheduling · cheat sheet Requirements traceability Linking each requirement to where it comes from, the deliverable that meets it and the test that checks it.
Common practice 6 steps Used by Project Manager
What it is Linking each requirement to its source, to the deliverable that meets it, and to the test that checks it, usually in a traceability matrix.
When to use it Once requirements are agreed, and kept up to date through design, build, test and changes.
Why it works It shows at any moment whether every need is covered, built and tested, and what a change will affect.
Do Keep it as simple as the project allows; a spreadsheet is often enough. Don't A matrix nobody updates after design. Requirements without tests. Step by step Number every requirement Unique IDs.
Record the source Who asked and why.
Link to deliverables Which part of the design or product meets it?
Link to tests Which test proves it?
Track status Designed, built, tested, accepted.
Use it for changes Find every requirement a change touches.
PreviewRequirements traceability Scope and scheduling Many requirements, suppliers and tests risk something being forgotten. 6 Used by Project Manager Scope and scheduling · cheat sheet Resource levelling Adjusting the schedule so nobody is booked for more than they can do, by moving work that has float, sharing it, or adding help.
Common practice 6 steps Used by Project Manager
What it is Adjusting a schedule so nobody is booked for more than they can do, by moving work that has float, sharing it, or adding help.
When to use it After the first schedule exists and whenever people's availability changes.
Why it works Plans that overload people fail quietly: work slips, quality drops, people burn out. Levelling makes the plan doable.
Do Nobody can work at 100% on project tasks for long; leave room for the unexpected. Don't Looking only at totals per person. Forgetting people's other jobs. Step by step Load tasks per person over time Include holidays and other duties.
Chart it A bar per week or month; mark 100%.
Find the peaks Who is over 100%, and when?
Move tasks with float Into quieter periods.
Share or add help Where moving isn't enough.
Touch the critical path last Only then does the end date move.
PreviewResource levelling Scope and scheduling Someone is booked for more than they can do. 6 Used by Project Manager Scope and scheduling · cheat sheet Rolling-wave planning Planning the near term in detail and later work in outline, adding detail as information arrives.
Common practice 5 steps Used by Project Manager
What it is Planning the near term in detail and later work in outline, adding detail as you learn more.
When to use it On any project where later work depends on what you learn earlier.
Why it works Detailed plans for work far ahead are usually wrong. Rolling-wave planning puts effort where it's useful and keeps plans realistic.
Do Rolling-wave isn't an excuse to skip planning ahead; the outline must still be there. Don't Using it as an excuse to never plan ahead. Detailed plans for work nobody can yet describe. Step by step Plan the next stage in detail Activities, owners, dates.
Plan later stages in outline Deliverables, milestones, rough estimates.
Set a point to plan the next wave Usually near the end of each stage.
Use what you learned To plan the next wave.
Keep the baselines Unless a change is approved.
PreviewRolling-wave planning Scope and scheduling Later work can't be planned in detail yet. 5 Used by Project Manager Scope and scheduling · cheat sheet Schedule compression Ways to shorten a schedule without cutting scope: add resources to critical work (crashing) or overlap activities (fast-tracking).
Common practice 6 steps Used by Project Manager
What it is Ways to shorten a schedule without cutting scope: crashing (adding resources to critical work) and fast-tracking (overlapping activities).
When to use it When the end date must move earlier, or to recover a delay.
Why it works When a date must move earlier or a delay must be recovered, these are the main options, each with a cost or a risk.
Do Shortening non-critical activities doesn't help the end date. Don't Compressing activities that aren't critical. Fast-tracking so much that rework wipes out the gain. Step by step Find the critical path Only critical activities affect the end date.
Crashing Which critical activities can go faster with more people or equipment, and at what cost?
Fast-tracking Which can overlap, and what rework risk does that add?
Compare options Time saved, cost, risk.
Let the sponsor decide With the trade-offs clear.
Re-check the critical path A new one may appear.
PreviewSchedule compression Scope and scheduling The end date must move earlier or a delay must be recovered. 6 Used by Project Manager Scope and scheduling · cheat sheet Work breakdown (decomposition) Splitting the whole scope into deliverables, then into smaller pieces, until each piece can be estimated, scheduled and owned.
Common practice 6 steps Used by Project Manager
What it is Breaking the whole scope of a project into deliverables, then into smaller pieces, until each piece can be estimated, scheduled and owned. The result is a tree called a work breakdown structure (WBS).
When to use it In planning, after the scope is agreed. Also useful any time a piece of work feels too big to estimate.
Why it works It makes sure all the work is included exactly once. Schedules, budgets, responsibilities and risks are all built on it, so gaps in the WBS become gaps everywhere.
Do Nouns, not verbs: “Training materials”, not “write training materials”. Stop splitting when more detail wouldn't change how you manage it. Don't Mixing activities and deliverables. Forgetting project management work itself. Going so deep that tracking costs more than doing. Step by step Start with the whole Put the project or main deliverable at the top.
Split into major deliverables Usually 4 to 8 nouns (things, not activities). Include project management as its own branch.
Keep splitting Break each deliverable into smaller pieces until each can be estimated, given to one owner and done in a reasonable time.
Apply the 100% rule The children of each box add up to exactly the parent: nothing missing, nothing extra.
Number every box 1, 1.1, 1.1.1 so everyone refers to the same thing.
Write a short dictionary For important pieces: what's included, acceptance criteria, owner, estimate.
PreviewWork breakdown (decomposition) Scope and scheduling A project feels too big to plan and nothing must be forgotten. 6 Used by Project Manager Stakeholders · cheat sheet Negotiation Reaching an agreement where both sides' real interests are met, rather than haggling over fixed positions.
Common practice 6 steps Used by Project Manager
What it is Reaching an agreement where both sides' real interests are met, by focusing on why people want something rather than on fixed positions.
When to use it Claims and disputes with suppliers, competing needs between stakeholders, agreeing people's time.
Why it works Positional haggling damages relationships and often leaves value on the table. Interest-based negotiation finds better deals and keeps people working together.
Do Never start with your final offer. Silence is a tool; don't rush to fill it. Don't Starting with your final offer. Winning the deal and losing the relationship. Step by step Prepare Know the facts, your interests, theirs, and your walk-away point (best alternative).
Separate the people from the problem Stay respectful, even when firm.
Ask about interests “Why is that important to you?”
Create options Several ways to meet both sides' interests.
Use fair criteria The contract, market rates, evidence.
Write down what was agreed And confirm it.
PreviewNegotiation Stakeholders Two sides want different things and you need a deal both accept. 6 Used by Project Manager Stakeholders · cheat sheet Saying no with reasons Turn a no into a clear, respectful “not now” or “not for this product”, backed by value and the goal.
Common practice 6 steps Used by Product Owner, Project Manager
What it is Turning down or deferring a request in a way that keeps the relationship: explaining the reason, the trade-off, and offering an alternative.
When to use it Every time a request doesn't fit the current goal or the vision.
Why it works Saying yes to everything breaks promises and priorities. A respectful no, with reasons and options, protects the work and keeps trust.
Do “No, and here's what I can do” works better than “no”. Don't A no without a reason. A yes to keep the peace that breaks the Sprint Goal. Step by step Listen and understand the need Ask why it matters to them.
Check it against goals and priorities Does it fit? What would it replace?
Explain the trade-off “If we do this, X moves later.”
Offer an alternative Later, smaller, different, or someone else.
Record it So it isn't lost and can come back.
Escalate if needed When it's not your decision.
PreviewSaying no with reasons Stakeholders A request would break priorities but the relationship matters. 6 Used by Product Owner, Project Manager Stakeholders · cheat sheet Stakeholder communication plan Decide who gets told what, how and how often, so nobody is surprised.
Common practice 6 steps Used by Product Owner, Project Manager
What it is A planned way of keeping each stakeholder group informed: what they need to know, in what format, how often and from whom. Often written as a communication plan.
When to use it Once you know your stakeholders, and whenever someone says they were surprised.
Why it works People who feel uninformed fill the gap with rumours or resistance. Regular, fitting updates build trust and reduce interruptions.
Do One clear message, repeated in several channels, beats many different messages. With n people there are n × (n − 1) ÷ 2 possible channels; plan which ones matter. Don't Status reports that replace looking at the real product. Step by step List the audiences From your stakeholder map.
Ask what each needs Decisions, progress, dates, impact on them.
Choose format and frequency A one-page email, a meeting, a newsletter, a dashboard.
Name a sender for each So it actually happens.
Include bad news early With what you're doing about it.
Check it's working Ask people if the updates help, and adjust.
PreviewStakeholder communication plan Stakeholders Different people need different information at different times. 6 Used by Product Owner, Project Manager Stakeholders · cheat sheet Stakeholder engagement assessment A table comparing how engaged each key stakeholder is today with how engaged you need them to be, so you know where to spend your time.
Common practice 5 steps Used by Project Manager, Process Improvement Specialist
What it is A table comparing how engaged each key stakeholder is today with how engaged you need them to be, using levels like unaware, resistant, neutral, supportive and leading.
When to use it After the stakeholders are identified, and again at each stage or when someone's attitude changes.
Why it works It shows where the gaps are, so you spend time on the people whose engagement must change, not on those already on board.
Do Moving someone from resistant to neutral is often enough. Don't Wanting everyone to be “leading”: most only need to be supportive or neutral. Guessing positions without talking to the people. Step by step List key stakeholders From the stakeholder map.
Mark current engagement Based on what they say and do, not assumptions.
Mark the needed level Most people only need to be supportive or neutral.
Plan actions for the gaps Specific next steps with an owner.
Review regularly People move both ways.
PreviewStakeholder engagement assessment Stakeholders You need to know whose support must change, and how. 5 Used by Project Manager, Process Improvement Specialist Stakeholders · cheat sheet Stakeholder map (power and interest) Place each stakeholder by how much influence they have and how much they care, then engage each group differently.
Common practice 6 steps Used by Project Manager, Product Owner, Scrum Master, Process Improvement Specialist
What it is A stakeholder map places everyone affected by, or able to affect, your work on a simple grid: how much influence they have, and how interested they are.
The four boxes suggest how to involve each group: manage closely (high, high), keep satisfied (high influence, low interest), keep informed (low influence, high interest) and monitor (low, low).
When to use it At the start, and whenever new people appear or someone's interest changes.
Variations Engagement assessment compares how engaged each person is now with how engaged you need them to be.Salience model adds urgency and legitimacy to power.Why it works You can't give everyone the same attention. The map helps you spend your time where it matters, and makes sure nobody important is forgotten.
It also shows risks: a powerful person who isn't interested yet can suddenly block you.
Do Don't ignore end users just because they look low-influence; their reaction decides whether the result is used. Keep the map private if it contains frank views. Don't Making the map once and forgetting it. Ignoring end users because they look low-influence. Step by step Brainstorm everyone With the team, list people and groups who are affected or can affect the work: users, managers, finance, legal, suppliers, regulators, neighbours. Use checklists and past projects.
Rate influence and interest For each, ask: can they change or stop the work? How much do they care about it? Use high, medium, low.
Place them on the grid Draw the four boxes and write names in them. Discuss disagreements; they often reveal something important.
Decide how to engage each box Manage closely: regular personal contact. Keep satisfied: short updates on what matters to them. Keep informed: regular news. Monitor: light touch.
Turn it into actions Add owners and channels, often in a stakeholder register or communication plan.
Revisit it People move boxes. Update the map at each stage or when something changes.
PreviewStakeholder map (power and interest) Stakeholders You need to see who matters most and how to involve each. 6 Used by Project Manager, Product Owner, Scrum Master, Process Improvement Specialist Strategy and planning · cheat sheet Benefits tracking Measuring each expected benefit against its baseline and target after the project, with an owner who acts when it lags.
Common practice 6 steps Used by Project Manager
What it is Measuring each expected benefit after a project against its baseline and target, at agreed points, with an owner in the organisation who acts if it lags.
When to use it Planned in the business case, handed over at closure, reviewed at set points after go-live.
Why it works Projects are funded for their benefits, which usually arrive after the project ends. Without tracking, nobody knows if the money achieved anything.
Do Don't change targets to match results; explain the gap instead. Don't Owners who leave with the project. Only one measurement, too early to show anything. Step by step Define each benefit What improves, the measure, the baseline today, the target and the date.
Name an owner who stays Someone in the organisation, not in the project team.
Agree review points For example 6 and 12 months after go-live.
Measure and compare Actual vs baseline and target; look at the trend.
Find causes and act For benefits that lag, agree actions.
Report honestly Separate project success from benefit success.
PreviewBenefits tracking Strategy and planning The project is ending and its benefits will arrive later. 6 Used by Project Manager Strategy and planning · cheat sheet Minimum viable product (MVP) The smallest version that lets real users get value and lets you learn whether you're right.
Common practice 5 steps Used by Product Owner
What it is A minimum viable product is the smallest version of something that lets you test whether it's worth building more, with real users.
When to use it Early, when the biggest risk is building something nobody wants.
Why it works It avoids spending months building something nobody wants. Learning early is cheaper than learning late.
Do Minimum doesn't mean poor quality; it means small scope. Don't A “minimum” product so poor that it teaches nothing. Never measuring after releasing. Step by step Write the key assumption What must be true for this to succeed?
Design the smallest test What could prove or disprove it quickly?
Build only that Leave out everything not needed for the test.
Put it in front of real users Measure what they do, not just what they say.
Decide Build more, change direction, or stop.
PreviewMinimum viable product (MVP) Strategy and planning You want to test if an idea is worth building before investing more. 5 Used by Product Owner Strategy and planning · cheat sheet OKRs An inspiring objective plus a few measurable key results that show whether you reached it.
Common practice 5 steps Used by Product Owner
What it is Objectives and Key Results: an objective is a qualitative goal; key results are 2 to 4 measurable outcomes that show whether you got there.
When to use it To connect product goals to measurable outcomes the company cares about, usually per quarter.
Why it works They connect daily work to outcomes, and make progress measurable without dictating how to achieve it.
Do “Launch the app” is a task, not a key result. Ask what launching should change. Don't Key results that are task lists (“build ratings”). Too many OKRs. Step by step Write an inspiring objective Qualitative, clear, time-bound.
Add 2 to 4 key results Measurable outcomes, not tasks.
Set ambitious but honest targets Teams often aim for about 70% achievement.
Review progress regularly Weekly or monthly check-ins.
Score and learn at the end What worked, what to change.
PreviewOKRs Strategy and planning You want work tied to measurable outcomes rather than task lists. 5 Used by Product Owner Strategy and planning · cheat sheet PESTLE analysis A checklist for scanning the outside world for factors that affect a project or decision: Political, Economic, Social, Technological, Legal and Environmental.
Common practice 5 steps Used by Project Manager
What it is A checklist for scanning the world outside a project for things that could affect it: Political, Economic, Social, Technological, Legal and Environmental factors.
When to use it At the start, in feasibility studies and business cases, and when the environment changes.
Why it works Projects fail from outside causes as often as inside ones. Going letter by letter stops you forgetting whole areas.
Do Stay specific to this project; generic lists don't help. Don't Listing everything without judging what matters. Doing it once and never again. Step by step Gather a mix of people Different views find different factors.
Go letter by letter List factors under each heading.
Judge importance High, medium or low for this project.
Turn the important ones into action Risks, constraints, requirements or questions for the feasibility study.
Revisit when things change Elections, new laws, price shocks.
PreviewPESTLE analysis Strategy and planning You need to scan the outside world for factors that could affect a project. 5 Used by Project Manager Strategy and planning · cheat sheet Product roadmap (now, next, later) A visual forecast of where the product is heading, shown as goals and outcomes over time, not a list of dates.
Common practice 5 steps Used by Product Owner, Project Manager
What it is A roadmap shows, at a high level, the direction and the main steps over time: what's planned now, next and later, and why. It's a communication tool, not a detailed plan.
When to use it To align stakeholders on direction and sequence. Not in the Scrum Guide; it sits between the vision and the Product Backlog.
Variations Timeline roadmap uses dates or quarters, common for projects with fixed milestones.Outcome roadmap lists outcomes instead of features.Why it works It aligns people on direction and order without promising exact dates far ahead, which are rarely accurate.
Do Avoid exact dates for the “later” column. Don't Feature-and-date roadmaps that become promises. Roadmaps nobody updates. Confusing the roadmap with the Product Backlog. Step by step Start from goals or outcomes What do we want to achieve?
Group work into themes Not individual tasks.
Arrange in time horizons Now (committed), next (likely), later (ideas).
Show confidence honestly Near items are firm; far items are directional.
Share and review Update it regularly as you learn.
PreviewProduct roadmap (now, next, later) Strategy and planning Leaders need the direction and order on one page, without exact dates. 5 Used by Product Owner, Project Manager Strategy and planning · cheat sheet Product vision and elevator pitch One short, memorable direction for the product: who it's for, what it does for them, why it's different.
Common practice 6 steps Used by Product Owner
What it is A short statement of the future a product or project aims to create: for whom, what problem it solves, and why it's better than the alternatives.
When to use it At the start, and whenever people pull the product in different directions.
Why it works It gives everyone a shared direction, helps make trade-offs, and lets people say no to things that don't fit.
Do If nobody can repeat the vision from memory, it's too long. Don't Vague slogans that decide nothing. A vision nobody outside the product team knows. Step by step Name the target group Who is it for?
Name the need What problem or opportunity?
Describe the outcome What changes for them?
Say what makes it different Why this, not the alternatives?
Make it short One or two sentences people can remember.
Use it Refer to it when deciding priorities.
PreviewProduct vision and elevator pitch Strategy and planning People pull in different directions and need a shared aim. 6 Used by Product Owner Strategy and planning · cheat sheet Release planning Decide what makes a release valuable enough to ship, and forecast roughly when it can happen.
Common practice 5 steps Used by Product Owner
What it is Deciding which features or results go out in which release, and roughly when, based on value, capacity and dependencies.
When to use it When the business needs to plan launches, marketing or support. Scrum itself allows releasing any time an Increment is valuable.
Why it works It sets expectations for stakeholders and helps the team focus on a usable whole rather than scattered pieces.
Do Release goals beat feature lists: they let you swap items without breaking the promise. Don't Waiting for “everything” before releasing. Treating the forecast as a fixed promise. Step by step Set the release goal What should users be able to do after it?
Pick the items that serve the goal In order of value.
Check capacity Use the team's pace or throughput.
Check dependencies Other teams, suppliers, approvals.
Set a target with a range Update as work progresses.
PreviewRelease planning Strategy and planning Stakeholders need to know what's coming in which release, roughly when. 5 Used by Product Owner Strategy and planning · cheat sheet SWOT analysis A simple grid of internal Strengths and Weaknesses and external Opportunities and Threats, used to judge an idea or situation.
Common practice 6 steps Used by Project Manager
What it is A grid of four boxes: internal Strengths and Weaknesses, external Opportunities and Threats.
When to use it In feasibility studies, strategy discussions and when comparing options.
Why it works It gives a quick, balanced picture of an idea or situation and points to strategies: use strengths, fix weaknesses, seize opportunities, guard against threats.
Do End with decisions; a SWOT without actions is decoration. Don't Long lists with no conclusions. Confusing internal and external factors. Step by step List strengths What do we do well or have?
List weaknesses What do we lack?
List opportunities Outside things that could help.
List threats Outside things that could harm.
Combine Strengths × opportunities = what to pursue; weaknesses × threats = what to protect against.
Decide Turn it into actions or risks.
PreviewSWOT analysis Strategy and planning You need a quick, balanced view of an idea's strengths, weaknesses and context. 6 Used by Project Manager Team development · cheat sheet Conflict styles People handle conflict in different ways; knowing them helps you guide a disagreement towards working it out together.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is Five common ways people handle conflict: competing (win), accommodating (give in), avoiding, compromising (split the difference) and collaborating (solve it together).
When to use it When a disagreement repeats or gets personal.
Why it works Each style fits some situations. Knowing them helps you choose deliberately instead of reacting.
Do Avoiding is fine for trivial issues, harmful for important ones. Don't Deciding who is right. Pushing for a quick compromise that solves nothing. Step by step Notice the conflict early Before it becomes personal.
Separate the issue from the people Talk about the problem.
Choose a style for the situation Collaborate when both sides' needs matter and there's time; compete when safety is at stake; compromise when time is short.
Start from the shared goal And the facts.
Agree and record the outcome So it doesn't return.
PreviewConflict styles Team development A disagreement is growing and you need to choose how to handle it. 5 Used by Scrum Master, Project Manager Team development · cheat sheet Delegation levels Make clear, decision by decision, how much the team decides itself and how much a leader decides.
Common practice 5 steps Used by Scrum Master, Project Manager, Product Owner
What it is A scale for how much a team or person decides on their own, from “I decide” to “you decide”, agreed per type of decision.
When to use it When managers and teams keep stepping on each other's decisions, or as a team grows more self-managing.
Why it works Unclear delegation causes either micro-management or surprises. Agreeing levels per decision builds trust and speed.
Do Delegation without the information to decide well isn't delegation. Don't Delegating a decision, then taking it back. Step by step List recurring decisions Tools, budget, hiring, priorities, working hours.
Use a scale For example: tell, sell, consult, agree, advise, inquire, delegate.
Agree a level per decision Together.
Make it visible A simple table.
Move levels as trust grows Review every few months.
PreviewDelegation levels Team development It's unclear how much a team or person may decide alone. 5 Used by Scrum Master, Project Manager, Product Owner Team development · cheat sheet Knowledge transfer Making sure what a person knows is passed on before they leave or change role: by working together, writing things down and naming a successor.
Common practice 6 steps Used by Project Manager, Scrum Master
What it is Passing what a person knows to others before they leave or move: by working together, writing down what matters, and naming a successor.
When to use it When someone resigns, moves role or goes on long leave, and routinely for critical knowledge.
Why it works Much project knowledge isn't written anywhere. Losing it causes delays, errors and repeated mistakes.
Do Start on the day you hear someone is leaving. Don't Starting the handover in the last week. A long document nobody reads instead of working together. Step by step Find what only this person knows Systems, contacts, decisions and why, open issues.
Name a successor And agree overlap time.
Work alongside On real work, not just meetings.
Write short notes Setups, contacts, decisions. Keep passwords in the proper secure place.
Update roles and contacts RACI, contact lists.
Check it worked Can the successor handle a real case alone?
PreviewKnowledge transfer Team development Someone who knows things nobody else does is leaving or moving on. 6 Used by Project Manager, Scrum Master Team development · cheat sheet Psychological safety The shared belief that it's safe to speak up, admit mistakes and disagree without being punished.
Common practice 5 steps Used by Scrum Master
What it is A shared belief in a team that it's safe to speak up, ask questions, admit mistakes and disagree without being punished or embarrassed.
When to use it Always: without it, transparency is only for show.
Why it works Teams where people speak up learn faster, catch problems earlier and make better decisions.
Do How a leader reacts to the first bad news decides whether there's a second. Don't Confusing safety with avoiding hard conversations. Step by step Model it Leaders admit their own mistakes and uncertainty.
Invite input Ask quieter people directly, and thank them.
Respond well to bad news Curiosity, not anger.
Make mistakes learning Use blameless reviews.
Set clear standards Safety isn't lowering expectations; it's making it safe to meet them.
PreviewPsychological safety Team development People hold back questions, concerns or mistakes. 5 Used by Scrum Master Team development · cheat sheet Recognition Noticing and thanking people for specific contributions, publicly or privately, so good work and effort are seen.
Common practice 5 steps Used by Project Manager
What it is Noticing and thanking people for specific contributions, publicly or privately.
When to use it Continuously, and especially during long or stressful phases.
Why it works People who feel their work is seen stay motivated and engaged, especially in long or stressful work.
Do Generic thanks fade; specific thanks stick. Don't Generic thanks (“great job, everyone”) that nobody remembers. Always recognising the same few people. Step by step Notice specific actions Not just results.
Say it soon Close to when it happened.
Be specific What they did and why it mattered.
Match the person Public or private.
Be fair Spread recognition across the team.
PreviewRecognition Team development People work hard and you want them to know it's seen. 5 Used by Project Manager Team development · cheat sheet Situational leadership Adapting how you lead to each person and task: more directing for someone new to a task, coaching while they learn, supporting and then delegating as they gain confidence.
Common practice 6 steps Used by Project Manager
What it is Adapting your leadership to each person and task: directing when someone is new to a task, coaching while they learn, supporting as they gain skill, and delegating when they're capable and confident.
When to use it Every day, especially with mixed teams of new and experienced people.
Why it works People need different things at different times. Leading everyone the same way frustrates experienced people and leaves new ones lost.
Do The same person may need directing on one task and delegating on another. Don't One style for everyone. Delegating to someone who isn't ready. Step by step Look at the person and the task How skilled and confident are they at this task?
New and unsure Clear instructions, close follow-up.
Learning Explain why, coach, encourage.
Skilled but hesitant Support, involve, build confidence.
Skilled and confident Delegate, step back.
Re-check often People grow; adjust your style.
PreviewSituational leadership Team development People with different experience need different kinds of leadership. 6 Used by Project Manager Team development · cheat sheet Team health check A regular, quick self-assessment of how the team is doing on things like pace, fun, quality and support.
Common practice 5 steps Used by Scrum Master
What it is A short, regular check where team members rate areas like clarity, collaboration, pace and support, to spot problems early.
When to use it Every few Sprints, to spot trends before they become problems.
Why it works Small problems are easier to fix before they grow; regular checks make it normal to talk about them.
Do Act on results, or people stop answering honestly. Don't Using it to judge the team from outside. Step by step Pick a few areas For example clarity of goals, workload, support, fun, learning.
Rate each Green, amber, red, or 1 to 5, anonymously if needed.
Show the trend Compared with last time.
Discuss the lowest areas What's behind them?
Agree one action And check it next time.
PreviewTeam health check Team development You want to spot team problems early, before they grow. 5 Used by Scrum Master Team development · cheat sheet Team stages (forming to performing) New teams often move through forming, storming, norming and performing, and the Scrum Master's help changes with each stage.
Common practice 6 steps Used by Scrum Master, Project Manager
What it is A model of how groups develop: forming (polite, unsure), storming (friction), norming (agreeing how to work) and performing (working well together). Some add adjourning, when the group ends.
When to use it To understand what a team needs now, and not panic when it storms.
Why it works Knowing that friction is a normal stage helps leaders respond calmly and help the team move on.
Do Don't skip storming by imposing rules; it returns later. Don't Treating the stages as a fixed timetable. Avoiding storming instead of helping through it. Step by step Recognise the stage From behaviour: politeness, conflict, agreement, flow.
Forming: give clarity Purpose, roles, first goals.
Storming: help resolve Make conflict open and fair; agree rules together.
Norming: step back Let the team own its ways of working.
Performing: protect and challenge Remove obstacles, set bigger goals.
Expect to go back New members or big changes can restart the cycle.
PreviewTeam stages (forming to performing) Team development A new team is clashing and you wonder if something is wrong. 6 Used by Scrum Master, Project Manager Team development · cheat sheet The change curve A way to understand how people react to change over time, often from shock and resistance through exploration to acceptance and commitment, so you can support each stage.
Common practice 6 steps Used by Project Manager, Process Improvement Specialist
What it is A way to understand how people react to change over time, often from shock and resistance, through exploring the new, to acceptance and commitment.
When to use it When a project changes how people work.
Why it works Projects that change how people work only deliver benefits if people adopt the change. Knowing the stages helps you give the right support at the right time.
Do Resistance is a stage, not a character flaw. Don't Expecting everyone to accept change at once. Treating resistance as bad behaviour instead of a stage. Step by step Expect different reactions People move at different speeds.
Early on: explain why Clearly and repeatedly, with the reasons.
During resistance: listen Acknowledge what people lose; answer concerns honestly.
During exploration: involve and train Let people shape the new ways.
Towards commitment: recognise Celebrate progress; use champions.
Check readiness By what people can do, not what they say.
PreviewThe change curve Team development A project changes how people work and some resist. 6 Used by Project Manager, Process Improvement Specialist