A step-by-step review of how a process could fail, what each failure would do, why it would happen, and how likely it is to be caught, ranked by a risk score.
Common practice 6 steps Used by Process Improvement Specialist
What it is
FMEA looks at each step of a process and asks how it could fail, what the effect would be, why it would happen and how it's caught. Each failure gets three scores, multiplied into a risk priority number.
When to use it
When you need to find and rank risks in a process: in Analyse to spot likely causes, and in Improve to check a new design before it goes live.
Why it works
It finds and ranks risks before they cause harm, including the quiet failures nobody complains about.
Do
Score as a team, with a simple agreed scale.
Always act on severity 9 or 10, whatever the RPN.
Don't
Scoring alone, without the people who do the work.
Arguing over single points instead of ranking.
Ignoring high-severity failures because their RPN is modest.
The team lists how the booking process can fail, then scores each failure for severity, how often it happens (occurrence) and how likely it is to go unnoticed (detection), each from 1 to 10.
Step by step
Severityhow bad the effect is for the patient: 1 none, 10 dangerous
Occurrencehow often the cause happens: 1 almost never, 10 constantly
Detectionhow likely it goes unnoticed before harm: 1 always caught, 10 never