Backlog craft · cheat sheet

Acceptance criteria and Given/When/Then

The conditions an item must meet to do what the user needs, written so anyone can check them.

Common practice
6 steps
Used by Product Owner, Project Manager

What it is

Acceptance criteria are the specific, testable conditions something must meet to be accepted. They answer: how will we know this is done and right?

When to use it

For every item before it is selected in Sprint Planning. Different from the Definition of Done, which applies to all items.

Why it works

They remove ambiguity before work starts, give testers something to check, and stop arguments at the end about whether something is finished.

Do

  • Five to eight criteria per item is usually plenty; more suggests the item should be split.

Don't

  • Confusing them with the Definition of Done.
  • Writing them alone and handing them over.

Step by step

  1. Write them before the work starts Together with the people who'll use and build it.
  2. Make each one testable Yes or no, not “user-friendly”.
  3. Cover the important cases The normal case, edge cases, errors and limits.
  4. Keep them about the result What, not how it's built.
  5. Use a clear format A simple list, or Given / When / Then: Given a situation, When something happens, Then this result.
  6. Check them at the end Accept only when every criterion is met.
Also called: Conditions of satisfaction, scenariosPrint the blank template ↗

Worked example

The situation. A new building entrance must be accessible.

  1. Given a wheelchair user, when they arrive at the entrance, then they can enter without help.
  2. Door opens automatically or with less than 30 N of force.
  3. Ramp slope no steeper than 1:12.

The result. The inspector and the users checked the same list; the entrance was accepted the first time.

Acceptance criteria Print blank
Given (situa­tion)When (action)Then (result we can check)Met?

Copy this structure, or print the blank version and fill it in by hand.

In the roles

How a Product Owner uses it

Given I have items in my cart, When I tap Checkout and I'm not signed in, Then I am asked to sign in and my cart is kept.

How a Project Manager uses it

Each clinic deliverable gets a testable acceptance line: “Booking system: 50 test bookings succeed online and by phone”; “Floors: anti-slip and cleanable to infection-control standard”.

Questions people ask

Is this the same as a Definition of Done?

No. Acceptance criteria are specific to one item; a Definition of Done applies to all work.