Scope and scheduling · cheat sheet

Critical path

The longest chain of dependent activities through the plan. It sets the end date; activities off it have slack.

Common practice
7 steps
Used by Project Manager

What it is

The critical path is the longest chain of dependent activities from start to finish. It sets the shortest possible duration of the project.

Activities on it have no slack: if one slips, the end date slips. Activities off it have float, so they can move a little without affecting the end.

When to use it

When building or changing a schedule, and whenever someone asks “can we finish earlier?”.

Variations

  • Critical chain adds shared buffers at the end of chains instead of padding each task.
  • Near-critical paths chains with very little float that deserve attention too.

Why it works

It tells you where to focus. Speeding up a non-critical task doesn't help the end date; protecting critical tasks does.

It also tells you what to say when someone asks “can we finish earlier?”: only by shortening the critical path.

Do

  • Outside dependencies (permits, deliveries, approvals) are often on the critical path and outside your control: book them early.
  • Show the critical path in a different colour on every Gantt chart you share.

Don't

  • Missing dependencies, so the path looks shorter than it is.
  • Ignoring near-critical paths with very little slack.

Step by step

  1. List the activities Use the work breakdown to list activities with a duration estimate each.
  2. Find the dependencies For each activity, ask: what must finish before this can start? Note outside dependencies too, like approvals or deliveries.
  3. Draw the network Boxes for activities, arrows for dependencies. Sticky notes on a wall work well.
  4. Walk forwards From the start, work out the earliest start and finish of each activity. The latest earliest-finish is the project end.
  5. Walk backwards From the end, work out the latest each activity can finish without delaying the end. The difference between latest and earliest is the float.
  6. Mark the zero-float chain Activities with zero float form the critical path. Highlight them in the schedule and watch them most closely.
  7. Recheck when things change A delay on a non-critical task can use up its float and make a new critical path.
Also called: Critical path method, CPM, float, slackPrint the blank template ↗

Worked example

The situation. Opening a new café: lease signed, fit-out, equipment, hiring, permit, opening.

  1. Fit-out takes 6 weeks, equipment delivery 4 weeks, hiring 3 weeks, the food permit 2 weeks after fit-out.
  2. Chain: lease → fit-out (6) → permit inspection (2) → opening: 8 weeks.
  3. Equipment (4) and hiring (3) can run alongside fit-out: they have float of 2 and 3 weeks.

The result. The owner stopped chasing the equipment supplier and focused on the fit-out contractor and the permit.

Activity network worksheet Print blank
ActivityDurationDepends onFloat
Fit-out6 wkLease0 (critical)
Permit inspection2 wkFit-out0 (critical)
Equipment4 wkLease4 wk
Hiring3 wkLease5 wk

Filled in for: Opening a new café: lease signed, fit-out, equipment, hiring, permit, opening.

ActivityDurationDepends onFloat

Copy this structure, or print the blank version and fill it in by hand. Write activities with durations and dependencies; mark the chain with zero float as critical.

Before you use it: check these

CheckIf it fails
Every activity has its predecessors recordedAn activity with no links hides float; link it before trusting the path
Durations are realistic, not wishesUse three-point estimates for uncertain work
People are not double-bookedLevel resources; the critical path can move

How to do it with real data

The full calculation, as it happens in the story: the data, every step, how to read the result, and the spreadsheet functions to do it yourself.

Worked example with real data

Finding the critical path

From Day 12: How long will it really take? of the Project Manager story

Twelve activities with durations (weeks) and what must finish first. A forward pass finds the earliest dates, a backward pass the latest; the difference is the float.

Float for each activity, in weeks (0 = critical)02468A1: 00A1A2: 00A2A3: 00A3A4: 00A4A5: 44A5A6: 77A6A7: 55A7A8: 55A8A9: 00A9A10: 00A10A11: 00A11A12: 00A12

Step by step

  1. Forward passeach activity starts when all its predecessors finish; earliest finish = start + duration= opening at the end of week 30
  2. Backward passfrom week 30 back, the latest each activity can finish without delaying the end
  3. Floatlatest start − earliest start= hiring 5, equipment order 4, booking setup 7
  4. Critical pathactivities with zero float= A1 → A2 → A3 → A4 → A9 → A10 → A11 → A12
IDActivityWeeksStarts weekFinishes weekFloat (weeks)
A1Survey and design7170
A2Purchase completes1880
A3Asbestos removal39110
A4Building works1412250
A5Equipment order and delivery148214
A6Booking system setup109187
A7Hiring129205
A8Training521255
A9Equipment installation226270
A10Inspection128280
A11Licence229300
A12Opening030300

How to read the result

Eight activities have no float: any delay to them delays opening. Hiring can slip 5 weeks and booking setup 7 without harm.

What it led to

Annelise (Project Manager) watches the building works and licence most closely, and uses the float in hiring when people are double-booked.

Do it in a spreadsheet

Earliest finish=start + duration (start = MAX of predecessors' finishes)
Float=latest start - earliest start
Gantt chartstacked bar chart: invisible bar for the start, visible bar for the duration
Try it yourself: If building works take 16 weeks instead of 14, when does the clinic open?

Building works are critical, so opening moves 2 weeks, to the end of week 32.

In the roles

How a Project Manager uses it

Purchase → asbestos removal → building works → equipment → inspection → licence → opening has no slack and ends in week 30. Hiring has 5 weeks of slack.

Questions people ask

Can there be more than one critical path?

Yes. If two chains have the same length, both are critical, and the project is riskier.

Does the critical path change?

Often. Re-check it whenever durations or dependencies change.