| Topic | |
|---|---|
| Date |
c̄ ______ upper limit c̄ + 3√c̄ ______
| Period | Amount checked (same each time) | Defects |
|---|---|---|
Letters and symbols: X̄ · X̿ · R̄ · s̄ · p̄ · ū · c̄ A bar over a letter means an average: X̄ a subgroup average, X̿ the average of the averages, R̄ the average range, s̄ the average standard deviation, p̄ the average share, ū and c̄ the average defect rate and count