Spaghetti diagram
A floor plan with a line drawn wherever a person or item goes during a process, showing wasted walking and carrying.
What it is
A floor plan with a line drawn for every trip a person, or an item, makes during a process. The tangle of lines looks like spaghetti.
It shows wasted walking and carrying at a glance.
When to use it
When people walk or move things a lot during their work, or a layout feels awkward.
Why it works
Movement feels like work, so nobody notices it. A drawing makes it visible and easy to discuss.
Do
- Follow the person for long enough: a full cycle of their work.
- Show the before and after drawings side by side.
Don't
- Watching too short a period to see the pattern.
- Making it about one person's habits rather than the layout.
Step by step
- Get a floor plan A simple sketch is enough.
- Choose who or what to follow One person or one item, for a set period.
- Draw every trip From where they start to where they go.
- Count and estimate distance
- Ask why Why is each trip needed?
- Redesign and redraw Move things closer, then compare.