Lean and improvement · cheat sheet

Control plan

A table of the key measures that keep a process on track: what is measured, how, how often, by whom, against what limits, with which chart, and what to do when it goes wrong.

Common practice
5 steps
Used by Process Improvement Specialist

What it is

A control plan lists the measures that keep a process on track, with how each is checked and what happens when it goes wrong. The response plan is the “what happens” part.

When to use it

At the end of an improvement project, when handing the process to its owner, and whenever a process changes.

Why it works

Gains fade when attention moves on. A plan with owners and reactions keeps them.

Do

  • Control the causes as well as the result: they warn earlier.
  • Keep it to the measures that matter.

Don't

  • Measures with no owner.
  • Limits with no reaction plan.
  • Controlling only the result, not the causes.

Step by step

  1. Choose the measures Result and key causes.
  2. For each Definition, method, frequency, owner, limits, chart.
  3. Response plan Signal, first action, who to tell.
  4. Lean controls 5S, mistake-proofing, kanban checks.
  5. Sign and review
Also called: Process control plan, response plan, reaction planPrint the blank template ↗

Worked example

The situation. A bakery's improved proving process.

  1. Three measures in the plan.

The result. Complaints stayed below 3 a week for a year after the project.

Control plan Print blank
MeasureHow oftenOwnerLimits or targetChartIf it goes wrong
Loaf height5 loaves a batchHead baker9.5 to 11 cmXbar-RCheck proving time and temperature; hold the batch
Proving room temperatureHourlyShift baker26 to 28 °CI-MRReset thermostat; call maintenance
Customer complaintsWeeklyShop managerUnder 3 a weekC chartReview with the bakers

Filled in for: A bakery's improved proving process.

MeasureDefi­nitionHow measuredHow oftenOwnerLimits or targetChartResponse if it goes wrong

Copy this structure, or print the blank version and fill it in by hand.

In the roles

How a Process Improvement Specialist uses it

Five measures (waits, share within 7 days, missed appointments, urgent slot use, booking errors), each with an owner, a chart and a response.

Questions people ask

Who owns it?

The process owner, not the project team.