A straight-line model of how a result (y) changes with one input (x): y = b0 + b1 × x, fitted to the data, used to understand and predict.
Common practice 6 steps Used by Process Improvement Specialist
What it is
Simple linear regression fits the straight line y = b0 + b1 × x that best matches the data (least squares). The slope b1 says how much y changes for each unit of x.
When to use it
When one input seems to drive a result and you want to know by how much, and to predict.
Why it works
It turns “these go together” into “this much change in x gives this much change in y”, which is what decisions need.
Do
Look at a plot of residuals against predicted values: it should look like random scatter.
Copy this structure, or print the blank version and fill it in by hand. Equation y = b0 + b1 × x · R² · p-value of slope · residual check (pattern? spread?) · prediction and interval
Before you use it: check these
Check
If it fails
Residuals look random, with even spread
Try a curve or a transformation
Residuals roughly normal
Predictions are fine; intervals less so: transform or use more data
Predict only inside the data's range
Collect data for the range you need
How to do it with real data
The full calculation, as it happens in the story: the data, every step, how to read the result, and the spreadsheet functions to do it yourself.
Slots explain three quarters of the week-to-week variation. Getting back to 262 routine slots a week would bring the weekly median back to about 8.3 days: better, but not the 5-day goal on its own.
What it led to
Restoring lost capacity is necessary but not enough. Model the other causes together.
Do it in a spreadsheet
Slope and intercept
=SLOPE(D2:D21,B2:B21) and =INTERCEPT(D2:D21,B2:B21)
R²
=RSQ(D2:D21,B2:B21)
Full output
=LINEST(D2:D21,B2:B21,TRUE,TRUE), or Data Analysis, Regression
Prediction
=FORECAST.LINEAR(262,D2:D21,B2:B21)
Try it yourself: Why is the prediction interval (±2.13) so much wider than the confidence interval (±0.61)?
The confidence interval is for the average wait of all weeks with 262 slots. The prediction interval is for one single week, which also varies around that average.
In the roles
How a Process Improvement Specialist uses it
Weekly median wait = 35.85 − 0.105 × routine slots; R² 0.75; 262 slots predicts 8.3 days ± 2.1.