Inspection and testing
Checking a deliverable against its requirements by looking, measuring or testing, and recording what passes and what must be fixed.
What it is
Checking a deliverable against its requirements by looking, measuring or testing, and recording what passes and what must be fixed.
When to use it
At planned points throughout the work, before work is covered up or handed over, and before acceptance.
Variations
- Testing for systems: unit, integration, user acceptance.
- Audit checks that processes are followed (quality assurance).
Why it works
Defects found early are cheap to fix. Inspections at the right moments prevent costly rework later.
Do
- Inspect before work is hidden; after, fixes cost ten times more.
Don't
- Inspecting only at the very end.
- Checklists that don't link to requirements.
Step by step
- Plan inspection points Especially before work is covered up or handed over.
- Use a checklist from the requirements Each check linked to a requirement.
- Inspect and record Pass or fail, with evidence.
- Log defects With an owner and a fix date.
- Re-inspect fixes Before closing.
- Look for patterns Repeated defects mean a process problem.