Lean and improvement · cheat sheet5S
Five steps to organise a workplace so the right things are in the right place, easy to find, and stay that way.
Common practice
5 steps
Used by Process Improvement Specialist
What it is
5S is a method for organising a workplace: sort, set in order, shine, standardise, sustain.
When to use it
When clutter, searching or out-of-date materials slow work or cause mistakes, and before introducing a new way of working.
Why it works
Searching, clutter and old versions waste time and cause mistakes. A new process needs a workplace that supports it.
Do
- Take before and after photos.
- Sustain is the step most often skipped, and the one that matters most.
Don't
- A one-off tidy-up with no sustain step.
- Doing it to people instead of with them.
Step by step
Sort Remove the unneeded.
Set in order A place for everything.
Shine Clean and inspect.
Standardise Agree and show how it should look.
Sustain Regular short checks.
Worked example
The situation. A hospital supply room.
- Before: 14 minutes average to find an item. 5S with the nursing team.
The result. Average time to find an item fell to 2 minutes.
| Step | What the team did |
|---|
| Sort | Removed 30% of stock: expired or unused |
| Set in order | Shelves labelled; most-used items at waist height |
| Shine | Cleaned; damaged packs removed |
| Standardise | Photo of each shelf, minimum and maximum levels |
| Sustain | Weekly 5-minute check by rota |
Filled in for: A hospital supply room.
Copy this structure, or print the blank version and fill it in by hand.
In the roles
How a Process Improvement Specialist uses it
The booking desk: one current rota, one urgent guide, old versions removed, a weekly 5-minute check.
Questions people ask
Is 5S only for factories?
No: offices, clinics, shared drives and email folders benefit too.
← All techniques and tools