A pair of control charts for measured data collected in small subgroups (usually 2 to 9): one for the subgroup averages, one for their ranges.
Common practice 6 steps Used by Process Improvement Specialist
What it is
An Xbar-R chart tracks a process with small subgroups: the averages show where the process is centred, the ranges how much it varies within each subgroup.
When to use it
When you can take several measurements under the same conditions at regular intervals, such as 5 items an hour.
Why it works
It separates normal variation from real changes, so people react only when something has really changed.
Do
Constants for n = 2 to 9: A2 1.880, 1.023, 0.729, 0.577, 0.483, 0.419, 0.373, 0.337; D4 3.267, 2.574, 2.282, 2.114, 2.004, 1.924, 1.864, 1.816.
Don't
Subgroups that mix different conditions, which inflates the range and hides signals.
Filled in for: A bottling line takes 5 bottles an hour.
Subgroup
1
2
3
4
5
Average
Range
Copy this structure, or print the blank version and fill it in by hand. X̿ ______ R̄ ______ limits: X̿ ± A2 × R̄ · R chart: D3 × R̄ to D4 × R̄ (n = 5: A2 0.577, D3 0, D4 2.114)
Before you use it: check these
Check
If it fails
Subgroups of 2 to 9, the same size
Use Xbar-S for 10 or more, or varying sizes
Read the R chart first
If ranges are out of control, the Xbar limits are wrong
How to do it with real data
The full calculation, as it happens in the story: the data, every step, how to read the result, and the spreadsheet functions to do it yourself.
The new process is stable: apart from day 14, every day's average and range sits inside the limits. 91% of the 100 waits are 7 days or less: the 90% goal is met.
What it led to
Day 14 has a known special cause. The response plan adds: when a doctor is off at short notice, use the cover list the same day. The chart continues with the recalculated limits.
Do it in a spreadsheet
Average and range
=AVERAGE(B2:F2) and =MAX(B2:F2)-MIN(B2:F2)
Limits
=AVERAGE(G2:G21)+0.577*AVERAGE(H2:H21), and minus for the lower
Chart
line chart of the averages, with three extra series for the centre line and limits
Try it yourself: Why read the R chart before the Xbar chart?
The Xbar limits are calculated from the average range. If the ranges aren't stable, the Xbar limits are wrong.
In the roles
How a Process Improvement Specialist uses it
5 waits a day for 20 days: centre 4.42, limits 1.85 to 6.99; day 14 (a doctor off sick) above the limit.