Problem-solving · cheat sheet

5 Whys

Ask “why?” several times to get from a symptom to the cause you can actually fix.

Common practice
6 steps
Used by Scrum Master, Project Manager, Process Improvement Specialist

What it is

A simple way to find the root cause of a problem: ask “why?” about the problem, then about the answer, and so on, until you reach a cause you can fix in the process.

When to use it

When the same problem keeps coming back.

Variations

  • Fishbone diagram for problems with several possible causes.
  • Fault tree for complex technical failures.

Why it works

Most first answers are symptoms. Fixing symptoms means the problem returns. Asking why several times moves the discussion from people to the system they work in.

Do

  • Do it with the people closest to the work.
  • Several answers at one step? Follow each branch.

Don't

  • Stopping at a person (“because Abel (IT Operations Manager) didn't…”) instead of a process.

Step by step

  1. Write the problem clearly One specific sentence: what happened, where, how often. Not “quality is bad”.
  2. Ask why it happened Write the answer as a fact you can check.
  3. Ask why again, about that answer Repeat. Five is a guide; stop when you reach something in the process you can change.
  4. Check the chain Read it backwards with “therefore”. If it doesn't make sense, a step is missing or wrong.
  5. Agree a fix for the root cause Give it an owner and a date. Then check later whether the problem stopped.
  6. Keep it blameless If the answer is a person, ask why the process allowed it.
Also called: Root cause analysisPrint the blank template ↗

Worked example

The situation. Customers keep receiving the wrong product.

  1. Why? The picker took the wrong item.
  2. Why? Two products look the same and sit next to each other.
  3. Why? Shelf places are given by arrival order.
  4. Why? Nobody owns the warehouse layout.
  5. Fix: the warehouse lead owns the layout; similar products are separated and labelled.

The result. Wrong deliveries dropped by 80% in a month, with nobody blamed.

Five whys worksheet Print blank
Why?Answer (a fact you can check)

Copy this structure, or print the blank version and fill it in by hand.

In the roles

How a Scrum Master uses it

Why was tracking blocked? No map licence. Why? IT and finance each said it's the other's job. Why? No rule for small tool purchases. Fix: a fast path for small purchases.

How a Project Manager uses it

Why were the ducts wrong? The subcontractor used an old drawing. Why? The revision never reached him. Why? There was no drawing log. The fix is a log every trade confirms.

How a Process Improvement Specialist uses it

Call back tomorrow → no slots by 8:20 → only today's slots released at 8 am → an old rule to cut missed appointments → nobody reviewed it.

Questions people ask

Is it always five?

No. Sometimes three is enough, sometimes seven. Stop at a cause you can fix in the process.