Data and statistics · cheat sheet

Process capability

Measures of how well a stable process meets its requirement limits: the share outside the limits, capability indices and the sigma level.

Common practice
6 steps
Used by Process Improvement Specialist

What it is

Process capability compares what a stable process produces with what the customer requires.

Cp and Pp compare the width of the requirement limits with the spread. Cpk and Ppk also account for where the process is centred. Cp and Cpk use short-term variation; Pp and Ppk use the overall variation.

When to use it

When you need to know whether a process can meet a customer requirement, as a baseline and after improvement.

Variations

  • Attribute capability For yes-or-no data: the share defective, converted to defects per million and a sigma level.
  • Non-normal capability Use the observed share outside, fit a suitable distribution, or transform the data first.

Why it works

It answers the question every sponsor asks: can this process meet the requirement, and how often does it fail?

Do

  • Rough guide: Cpk 1.33 or more is often required in manufacturing; below 1 means regular failures.
  • Always say what share is outside the limits: it's what people understand.

Don't

  • Calculating capability on an unstable process.
  • Using normal-based indices on very skewed data without checking against the observed share.
  • Confusing short-term (Cp, Cpk) and long-term (Pp, Ppk) figures.

Step by step

  1. Check stability Run chart or control chart.
  2. Check shape Normal or not.
  3. Observed share outside Count it.
  4. Index Cpk or Ppk = (nearest limit − mean) ÷ (3 × s).
  5. Convert Parts per million, sigma level.
  6. Explain in plain words
Also called: Cp, Cpk, Pp, Ppk, sigma levelPrint the blank template ↗

Worked example

The situation. A bottling line fills 500 ml bottles; limits 495 to 505 ml.

  1. Mean 501, standard deviation 1.5 ml, stable and normal.

The result. Re-centring raised Cpk to 1.11 without any new equipment.

Capability worksheet Print blank
MeasureCal­culationResult
Cp(505 − 495) ÷ (6 × 1.5)1.11
Cpk(505 − 501) ÷ (3 × 1.5)0.89
Meaningspread fits, but off-centreRe-centre to 500

Filled in for: A bottling line fills 500 ml bottles; limits 495 to 505 ml.

ItemValueCal­culation

Copy this structure, or print the blank version and fill it in by hand. Lower limit · Upper limit · Mean · Standard deviation · Share outside · Cp or Pp = (upper − lower) ÷ (6s) · Cpk or Ppk = nearest limit distance ÷ (3s) · Sigma level

Before you use it: check these

CheckIf it fails
The process is stable (run chart or control chart)Fix the instability first, or describe only a stable period
The measurement system is trustedCheck it before calculating capability
The data is roughly normal for Cp and CpkUse the observed share outside the limits, or transform the data (Box-Cox)
Enough data: 50 or more valuesReport the index with a wide margin, or collect more

How to do it with real data

The full calculation, as it happens in the story: the data, every step, how to read the result, and the spreadsheet functions to do it yourself.

Worked example with real data

Capability against the 7-day requirement

From Day 22: How capable is the process? of the Process Improvement Specialist story

The requirement has an upper limit only: no more than 7 days. Amara uses the 60 waits from weeks 12 to 20, the stable period since the shift.

Waiting times against the 7-day upper limit0102030400 to 3: 03 to 6: 21216 to 9: 779 to 12: 8812 to 15: 9915 to 18: 6618 to 21: 5521 to 24: 1124 to 27: 1127 to 30: 22036912151821242730Upper limit 7

Step by step

  1. Observed performancewaits over 7 days: 33 of 60= 55%
  2. In parts per million0.55 × 1,000,000= 550,000
  3. Capability index (upper)Ppk = (upper limit − mean) ÷ (3 × standard deviation) = (7 − 10.43) ÷ (3 × 6.46)= −0.18
  4. Why negativethe mean is already past the limit
  5. Z valuethe normal value with 45% below it= −0.13
  6. Sigma levelZ + 1.5 (the usual long-term shift)= about 1.4
RequestWait (days)
R0112
R0213
R0312
R0428
R0511
R0612
R0716
R087
R093
R104
R114
R1210
R134
R1417
R155
R168
R175
R185
R195
R2020
R213
R2215
R235
R249
R255
R265
R2715
R2815
R2914
R3013
R3118
R3216
R333
R345
R3510
R367
R376
R3810
R3910
R405
R415
R424
R435
R446
R457
R4611
R4711
R483
R4913
R5026
R5112
R5222
R5327
R5418
R554
R5614
R5720
R583
R596
R6019

How to read the result

The process can't meet the requirement: more than half the patients wait too long. Because the data is skewed, the observed 55% is more trustworthy than a normal-based index; both say the same thing here.

What it led to

Baseline confirmed: 45% within 7 days, sigma level about 1.4 on this requirement. The goal of 90% within 7 days stays.

Do it in a spreadsheet

Share over the limit=COUNTIF(B2:B61,">7")/COUNT(B2:B61)
Ppk (upper)=(7-AVERAGE(B2:B61))/(3*STDEV.S(B2:B61))
Z value=NORM.S.INV(1-D2) (D2 = share over the limit)
Sigma level=NORM.S.INV(1-D2)+1.5
Try it yourself: At the goal (10% over 7 days), what would the sigma level be?

Z = NORM.S.INV(0.90) = 1.28; + 1.5 = about 2.8.

Worked example with real data

Capability before and after

From Day 45: The Improve review of the Process Improvement Specialist story

Amara repeats the Measure-phase capability calculation on the pilot data, against the same 7-day upper limit.

Step by step

  1. Share over 77 of 60= 12%
  2. Sigma levelnormal value with 88% below it, + 1.5: 1.19 + 1.5= 2.7
  3. Ppk(7 − 4.28) ÷ (3 × 2.33)= 0.39
  4. Why Ppk still looks lowthe data is still skewed: a few long waits widen the standard deviation= use the observed share
  5. Against the goal90% within 7 days needs about 10% over= nearly there
MeasureBeforePilot
Median wait (days)104
Mean (days)10.434.28
Standard deviation (days)6.462.33
Over 7 days55%12%
Parts per million over 7550,000117,000
Sigma level1.42.7
Ppk (upper)−0.180.39

How to read the result

Patients waiting more than 7 days fell from 55% to 12%, and the sigma level rose from 1.4 to 2.7. The process is now close to meeting the requirement.

What it led to

Move to Control with the full package plus cover for the lost sessions, and confirm 90% in the first weeks of roll-out.

Do it in a spreadsheet

Share over 7=COUNTIF(B2:B61,">7")/60
Sigma level=NORM.S.INV(1-D2)+1.5
Ppk=(7-AVERAGE(B2:B61))/(3*STDEV.S(B2:B61))
Try it yourself: What sigma level would 10% over 7 days give?

NORM.S.INV(0.90) = 1.28; + 1.5 = 2.8.

In the roles

How a Process Improvement Specialist uses it

Against the 7-day limit: 55% over, Ppk −0.18, sigma level about 1.4.

Questions people ask

Why can Cpk be negative?

When the average is already beyond a limit. More than half the output then fails that requirement.

Related techniques