Facilitation · cheat sheet

1-2-4-All

Think alone, then in pairs, then in fours, then as a whole group, so everyone's ideas are heard.

Common practice
5 steps
Used by Scrum Master

What it is

A facilitation pattern: think alone (1), then in pairs (2), then in fours (4), then share with the whole group (all).

When to use it

When a few voices dominate a meeting, or quiet people never speak.

Why it works

Everyone thinks before the loudest voices speak, ideas get better as they're combined, and large groups reach shared answers quickly.

Do

  • Keep the times short; energy matters more than completeness.

Don't

  • Skipping the silent first step.

Step by step

  1. Ask one clear question For example: “What's the biggest risk to our opening date?”
  2. 1: one minute alone Write ideas silently.
  3. 2: two minutes in pairs Build on each other's ideas.
  4. 4: four minutes in fours Pick the strongest ideas.
  5. All: five minutes together Each group shares one idea.
Also called: Think, pair, sharePrint the blank template ↗

Worked example

The situation. A 20-person kick-off needs to identify risks.

  1. Each group of four shares its top risk.
  2. Five strong risks emerge in 15 minutes, including one nobody had raised.

The result. A risk list owned by the whole group, not just the project manager.

1-2-4-All capture Print blank
GroupTheir stron­gest ideaWhy

Copy this structure, or print the blank version and fill it in by hand.

In the roles

How a Scrum Master uses it

In the vision workshop, Adam (CEO) talks first every time. Aaron (Scrum Master) uses 1-2-4-All and Ava (Developer)'s idea, “groceries in three taps”, makes it into the goal.

Questions people ask

Does it work online?

Yes, with breakout rooms.