A diagram that groups possible causes of a problem into categories, to look at it from every side.
Common practice 6 steps Used by Scrum Master, Project Manager, Process Improvement Specialist
What it is
A diagram that looks like a fish skeleton: the problem is the head, and the bones are categories of possible causes, such as people, process, materials, equipment, environment and measurement.
When to use it
For bigger problems with many possible causes.
Why it works
It helps a group explore many possible causes systematically, instead of jumping to the first explanation.
Do
Check causes with evidence before acting.
Don't
Listing causes without checking any.
Step by step
Write the problem at the headSpecific and factual.
Draw the main bonesChoose categories that fit your work.
Brainstorm causes on each boneAsk “why could this happen?”.
Copy this structure, or print the blank version and fill it in by hand.
In the roles
How a Scrum Master uses it
Bugs on older phones: tools (no old test phones), process (testing late), communication (no device list in acceptance criteria). The team adds “tested on older phones” to the Definition of Done.
For the ventilation defect, the team checks causes under drawings, people, materials and process before agreeing the root cause: an uncontrolled drawing revision.