Data and statistics · cheat sheet

Normality test

A test and a plot that check whether data fits the bell-shaped normal distribution, which many statistical tools assume.

Common practice
5 steps
Used by Process Improvement Specialist

What it is

A normality test checks whether data could come from a normal (bell-shaped) distribution. A normal probability plot shows the same thing visually: normal data falls along a straight line.

When to use it

Before using tools that assume normal data: capability indices, t-tests, ANOVA, some control charts.

Why it works

Many tools assume normal data. Using them on very skewed data can give badly wrong answers.

Do

  • Always look at the plot: the p-value alone doesn't say how the data differs.
  • Two groups mixed together can look non-normal: check for that first.

Don't

  • Deleting “outliers” to pass the test.
  • Reading a high p-value as proof of normality.
  • Testing huge samples, where tiny differences give low p-values.

Step by step

  1. Plot Histogram and probability plot.
  2. Test Anderson-Darling is common.
  3. Read the p-value Below 0.05: probably not normal.
  4. See how Skew, tail, two groups.
  5. Choose tools That suit the data, or transform.
Also called: Anderson-Darling test, normal probability plotPrint the blank template ↗

Worked example

The situation. Call lengths at a help desk, 80 calls.

  1. p = 0.002; the plot curves at the top: a few very long calls.

The result. The team used medians and a rank-based test to compare two shifts.

Normality check Print blank
CheckResultMeaning
HistogramLong right tailSkewed
Probability plotCurves away at the topLong calls
Anderson-Darling p-value0.002Not normal

Filled in for: Call lengths at a help desk, 80 calls.

CheckResultWhat it means

Copy this structure, or print the blank version and fill it in by hand.

Before you use it: check these

CheckIf it fails
Enough data: about 20 or more valuesWith fewer, rely on the plot and on knowledge of the process
Not huge samples onlyWith thousands of values tiny departures give small p-values; judge the plot
One process, not a mixTwo groups mixed together look non-normal; separate them first

How to do it with real data

The full calculation, as it happens in the story: the data, every step, how to read the result, and the spreadsheet functions to do it yourself.

Worked example with real data

Checking normality

From Day 21: Is it normal? of the Process Improvement Specialist story

Astrid (Data Analyst) runs an Anderson-Darling normality test on the 60 waiting times and draws a normal probability plot.

Normal probability plot of the 60 waiting times-3-2-1+0+1+2+307152230Points on the dashed line would mean normal data

Step by step

  1. HypothesesH0: the data comes from a normal distribution. H1: it doesn't
  2. Test statisticAnderson-Darling compares the data's shape with a normal curve= A² = 1.76
  3. Adjust for sample sizeA² × (1 + 0.75 ÷ 60 + 2.25 ÷ 60²)= 1.78
  4. p-valuefrom the adjusted statistic= about 0.0001
  5. Decidep below 0.05: reject H0= not normal
  6. Look at the plotpoints curve above the line at the top= long right tail
RequestWait (days)
R0112
R0213
R0312
R0428
R0511
R0612
R0716
R087
R093
R104
R114
R1210
R134
R1417
R155
R168
R175
R185
R195
R2020
R213
R2215
R235
R249
R255
R265
R2715
R2815
R2914
R3013
R3118
R3216
R333
R345
R3510
R367
R376
R3810
R3910
R405
R415
R424
R435
R446
R457
R4611
R4711
R483
R4913
R5026
R5112
R5222
R5327
R5418
R554
R5614
R5720
R583
R596
R6019

How to read the result

The waiting times are clearly not normal. They are skewed to the right, as waiting times almost always are. Tools that assume normal data would misstate how many patients wait too long.

What it led to

For capability, use the actual share beyond 7 days. In Analyse, use tests that suit skewed data, or transform the data first (covered in Improve).

Do it in a spreadsheet

Skewness=SKEW(B2:B61) (0.91: skewed right)
Rank-based normal value for a probability plot=NORM.S.INV((RANK.EQ(B2,$B$2:$B$61,1)-0.375)/(60+0.25))
The test itselfSpreadsheets have no built-in Anderson-Darling: use the skewness and the plot, or a free statistics add-on
Try it yourself: A different data set gives a normality p-value of 0.42. What do you conclude?

p is above 0.05, so there's no evidence against normality: you can treat the data as roughly normal. (It doesn't prove it's normal.)

In the roles

How a Process Improvement Specialist uses it

Anderson-Darling on 60 waits: p about 0.0001. The data is skewed right, so later tools must suit skewed data.

Questions people ask

What if p is above 0.05?

There's no evidence against normality, so normal-based tools are reasonable. It doesn't prove the data is normal.

Related techniques

← All techniques and tools