A compact picture of a group of values: a box from the first to the third quartile, a line at the median, and whiskers to the extremes, ideal for comparing several groups side by side.
Common practice 5 steps Used by Process Improvement Specialist
What it is
A box plot summarises a group with five numbers: the smallest value, the first quartile, the median, the third quartile and the largest value. Values far from the box are marked as possible outliers.
When to use it
When comparing the centre and spread of several groups, such as days, shifts, machines or suppliers.
Why it works
It makes differences in centre and spread between groups visible at a glance, before any test.
Five groups, one per weekday. Comparing them two at a time would mean ten tests and a high chance of a false alarm, so Astrid (Data Analyst) uses one-way ANOVA.
Step by step
HypothesesH0: all five day averages are equal. H1: at least one differs
Check equal spreadsLevene's test p = 0.07= no strong evidence against
Between-group variationsum of squares 861.5 ÷ 4 degrees of freedom= mean square 215.4
Within-group variationsum of squares 1,603.2 ÷ 55 degrees of freedom= mean square 29.1
F ratio215.4 ÷ 29.1= 7.39
p-valueF with 4 and 55 degrees of freedom= 0.00008
Which day?Monday mean 15.9 against 6.4 to 10.2 for the others= Monday stands out
The day a patient asks makes a real difference to how long they wait, and Monday is the problem. About a third of the variation in waits (861.5 of 2,464.7) is explained by the day.
What it led to
The waits are skewed, so confirm with tests that don't assume normal data (next day) before calling it a root cause.
Do it in a spreadsheet
ANOVA table
Excel: Data, Data Analysis, Anova: Single Factor (turn on the Analysis ToolPak first), with one column per day
Share explained
=861.5/(861.5+1603.2)
Check spreads
compare =STDEV.S of each day: 7.0, 4.7, 5.3, 3.9, 3.9
Try it yourself: Why not just run ten two-sample t-tests, one for each pair of days?
Each test has a 5% false-alarm risk. Ten tests push the chance of at least one false alarm to about 40%. ANOVA tests all groups at once at 5%.
In the roles
How a Process Improvement Specialist uses it
Waits by weekday: Monday's box sits far above the others, before any test is run.