Correlation and scatter plot
A scatter plot shows pairs of values as points; the correlation coefficient r (from −1 to +1) measures how closely they follow a straight line.
What it is
A scatter plot shows pairs of values as points. The correlation coefficient r summarises how closely they follow a straight line: +1 perfectly rising, −1 perfectly falling, 0 no straight-line link.
When to use it
When you suspect two measures move together, before building a model.
Why it works
It's the quickest way to see whether a suspected cause moves with the result.
Do
- Always plot before calculating.
- r only measures straight-line links.
Don't
- Calculating r without looking at the plot.
- Reading correlation as proof of cause.
- Missing a curved relationship that r understates.
Step by step
- Pair the data
- Plot
- Look at the shape
- Calculate r
- Test it