Quality · cheat sheet

Control chart

A chart of a measure over time (for example defects per test cycle), with an average line and limits, showing whether a process is stable or changing.

Common practice
5 steps
Used by Project Manager, Process Improvement Specialist

What it is

A chart of a measure over time with an average line and upper and lower limits, showing whether a process is stable or changing.

When to use it

When you measure something repeatedly and want to know if changes are real or just noise.

Why it works

It separates normal variation from real change, so you don't overreact to noise or miss a real drift.

Do

  • Don't change the process after every bad point; look for patterns.

Don't

  • Reacting to every small change.
  • Ignoring a steady drift.

Step by step

  1. Pick a regular measure Defects per cycle, waiting time per day.
  2. Plot points over time In order.
  3. Draw the average And limits (often average ± 3 standard deviations).
  4. Look for signals Points outside limits, seven or more in a row on one side, steady trends.
  5. Investigate signals only Leave normal variation alone.
Also called: Run chart, statistical process controlPrint the blank template ↗

Worked example

The situation. Waiting time at a clinic reception.

  1. Average 6 minutes, limits 2 to 10.
  2. One day at 14 minutes: a staff absence.
  3. After online check-in, eight days in a row below average: a real improvement.

The result. The clinic kept online check-in and planned cover for absences.

Control chart data Print blank
Date or cycleValueAverageUpper limitLower limitSignal?

Copy this structure, or print the blank version and fill it in by hand.

Before you use it: check these

CheckIf it fails
Rational subgroups: items from the same conditionsRe-plan the sampling
Limits calculated from a stable periodRemove known special causes and recalculate
The right chart for the data typeUse the chart chooser on the control chart page

In the roles

How a Project Manager uses it

Booking defects per test cycle are plotted. After the joint requirements reviews start, the points drop below the old average and stay there.

How a Process Improvement Specialist uses it

Xbar-R, I-MR, Xbar-S, P, NP, U, CUSUM and EWMA charts, each chosen for its data.

Questions people ask

Do I need statistics software?

A spreadsheet with a line chart is enough for most uses.