Retrospectives · cheat sheet

Retrospective actions that stick

Turn Retrospective ideas into one or two small, specific changes, and check them next time.

Common practice
5 steps
Used by Scrum Master

What it is

Turning review ideas into a few concrete improvement actions with owners and dates, and checking them next time.

When to use it

At the end of every Retrospective, and at the start of the next one.

Why it works

Reviews without follow-through make people cynical. A small number of real actions shows that reviews change things.

Do

  • “Communicate better” is not an action; “share notes within 24 hours” is.

Don't

  • Vague actions like “communicate better”.
  • Never checking whether last Sprint's change worked.

Step by step

  1. Choose one or two From the most important themes.
  2. Make each specific What exactly, who, by when.
  3. Make it visible On the team board or in the plan.
  4. Check at the next review Done? Did it help?
  5. Keep, adjust or drop Based on the result.
Also called: Improvement backlog, SMART actionsPrint the blank template ↗

Worked example

The situation. A review produced 14 ideas.

  1. The team picked two: written meeting notes within 24 hours; a test checklist.
  2. Both had owners and dates.

The result. Both were done; meeting notes stuck, the checklist was adjusted after one use.

Improvement actions Print blank
ActionOwnerBy whenDone?Did it help?

Copy this structure, or print the blank version and fill it in by hand.

In the roles

How a Scrum Master uses it

“Write acceptance criteria before Sprint Planning” gets checked in Sprint 2's Retrospective: it worked. On Day 20 the team even thanks Anna (Product Owner) for it.

Questions people ask

What if nothing changes?

Pick fewer, smaller actions, and check them every time.