Prioritisation · cheat sheet

Dot voting

Each person gets a few dots to place on the options they think matter most.

Common practice
5 steps
Used by Product Owner, Scrum Master

What it is

Everyone gets a few dots (for example 3) and places them on the options they prefer. The dots show the group's preferences quickly.

When to use it

To narrow down many options quickly in a workshop.

Why it works

It's fast, includes everyone, and turns a long discussion into a visible result in minutes.

Do

  • Dot voting shows preference, not value; combine it with facts for big decisions.

Don't

  • Popular isn't always valuable.
  • Letting the vote override the Product Owner's accountability.

Step by step

  1. Make the options clear Each on its own card.
  2. Give each person the same number of dots Usually about a third of the number of options.
  3. Agree the rules Can people stack dots on one option?
  4. Vote at the same time To reduce copying.
  5. Discuss the result Especially close calls and options with no dots.
Also called: Multi-votingPrint the blank template ↗

Worked example

The situation. A team chooses which of eight improvements to try.

  1. Each person gets three dots.
  2. Two options get most dots; one gets none and is dropped.

The result. A decision in five minutes after a 30-minute discussion had stalled.

Dot vote tally Print blank
OptionDotsNotes

Copy this structure, or print the blank version and fill it in by hand.

In the roles

How a Product Owner uses it

After the first Sprint Review, stakeholders dot-vote on six feedback ideas. Favourites gets the most dots; Anna (Product Owner) adds it to the backlog and orders it.

How a Scrum Master uses it

In the first Retrospective, after silent writing, the team dot-votes on 14 notes. The top item becomes their one improvement.

Questions people ask

Should the leader vote?

Yes, but last, or the group may follow them.

Related techniques

← All techniques and tools