Data and statistics · cheat sheet

Multi-vari analysis

Grouping data by possible sources of variation (time, place, person, product) and comparing them, to see which family causes most of the variation.

Common practice
5 steps
Used by Process Improvement Specialist

What it is

Multi-vari analysis splits variation into families, such as within one item, between items, over time, between people or places, and compares how much each family contributes.

When to use it

Early in Analyse, when results vary a lot and you need to know where to look.

Why it works

It narrows the search for causes quickly, often before any formal test.

Do

  • Choose families before collecting data, so the data records them.
  • Use it to choose what to test, not as proof.

Don't

  • Collecting data that doesn't record the families.
  • Stopping at the chart without testing.
  • Forgetting the variation within groups.

Step by step

  1. List families Time, place, person, item.
  2. Collect data Recording each family.
  3. Average each group
  4. Compare ranges Of group averages per family.
  5. Pick the biggest Then test it.
Also called: Multi-vari chart, families of variationPrint the blank template ↗

Worked example

The situation. A bottling line's fill volumes (ml).

  1. Three nozzles, three shifts, five bottles each.

The result. Nozzle 3 was underfilling; cleaning it removed most of the variation.

Multi-vari data sheet Print blank
FamilyRange of averages (ml)
Between nozzles3.2
Between shifts0.6
Within one nozzle, bottle to bottle0.8 (typical spread)

Filled in for: A bottling line's fill volumes (ml).

ItemFamily 1 (for example time)Family 2 (for example place)Family 3 (for example person)Measu­rement

Copy this structure, or print the blank version and fill it in by hand.

How to do it with real data

The full calculation, as it happens in the story: the data, every step, how to read the result, and the spreadsheet functions to do it yourself.

Worked example with real data

Which family of variation is biggest?

From Day 26: Where does the variation come from? of the Process Improvement Specialist story

Astrid (Data Analyst) groups the 60 waits three ways: by the day the patient first asked, by the doctor seen, and by the week. For each family she compares the lowest and highest group average.

Range of group averages for each family, in days0246810Day of / request: 9.59.5Day ofrequestWeek: 2.62.6WeekDoctor: 1.31.3Doctor

Step by step

  1. Choose the familiesthings that could change how long patients wait: day, week, doctor
  2. Average each groupMonday 15.9 · Tuesday 6.4 · Wednesday 10.2 · Thursday 7.1 · Friday 9.0
  3. Range for each familyhighest − lowest group average= 9.5 · 2.6 · 1.3 days
  4. Compare with the spread inside groupspatients on the same day still vary: pooled standard deviation= 5.4 days
  5. Read itthe biggest difference between groups is the day of the week= day family
FamilyLowest group average (days)Highest group average (days)Range (days)
Day of the request6.4 (Tuesday)15.9 (Monday)9.5
Week (weeks 12 to 20)9.111.72.6
Doctor9.911.31.3

How to read the result

When a patient asks matters far more than which doctor they see or which week it is. Monday requests wait more than twice as long as Tuesday ones. There is still a lot of variation within each day, so the day is not the only cause.

What it led to

Test the day-of-week effect properly (Days 31 to 33). Doctors aren't the problem, which helps Arjun (GP) and his colleagues trust the project.

Do it in a spreadsheet

Average by day=AVERAGEIFS(C2:C61,B2:B61,"Monday")
Range of averages=MAX(F2:F6)-MIN(F2:F6) (day averages in F)
ChartExcel: a box and whisker chart of column C, grouped by column B
Try it yourself: Why is the doctor family's small range good news for the project?

It shows the waits aren't caused by any one doctor. The causes are in how the process is organised, which is what the project can change.

In the roles

How a Process Improvement Specialist uses it

Day of request: averages range 9.5 days; week: 2.6; doctor: 1.3. The day family dominates.

Questions people ask

What's a multi-vari chart?

A chart with values plotted by family: within-group spread as vertical lines, group averages joined across. It shows the families at a glance.

Related techniques