The eight wastes

Eight common kinds of work that use time or money without helping the customer, used to spot and sort waste in any process.

Common practice
5 steps
Used by Process Improvement Specialist

What it is

Waste is anything that uses time, effort or money without making things better for the customer.

Eight kinds turn up in almost every kind of work: waiting, extra processing, unnecessary movement, unnecessary transport, rework and errors, overproduction, excess stock and unused talent.

When to use it

After watching a process, to sort what you saw, or during a walk to train your eye.

Variations

  • Seven wastes The original list, without unused talent.
  • Failure demand A service version: work caused by not doing something right the first time.

Why it works

Naming the waste trains your eye. Sorting observations into the eight kinds shows which ones cost the most.

Do

  • Don't argue about the category; agree it's waste and move on.
  • Remember that waste is in the process; the people doing it usually hate it too.

Don't

  • Arguing about which category something belongs to instead of removing it.
  • Treating every non-value step as waste, including legally required ones.
  • Blaming the people who do the wasteful work.

Step by step

  1. Learn the eight Use everyday examples from your own area.
  2. Observe Walk the process or use your notes.
  3. Tag Give each observation one kind of waste.
  4. Count See which kinds dominate.
  5. Ask why Find what causes the biggest group before fixing anything.
Also called: Muda, waste walkPrint the blank template ↗

Worked example

The situation. A small bakery's morning.

  1. The baker walks to the back store 30 times for flour.
  2. Trays of rolls are baked at 6 and half are thrown away at closing.
  3. The new assistant, a trained pastry chef, only washes trays.

The result. Flour moved next to the bench, smaller batches through the day, and the pastry chef makes cakes: waste down, sales up.

Waste walk sheet Print blank
Kind of wasteWhat it looks likeBakery example
WaitingPeople or items idleOvens free while dough proves
Extra processingMore work than the customer needsWrapping each roll twice
MovementPeople walking or reaching30 trips to the back store
TransportMoving things aroundTrays carried between two rooms
Rework and errorsDoing it againBurnt batch remade
OverproductionMaking too much, too earlyRolls baked at 6, thrown away at 6
Excess stockMore than neededThree weeks of packaging
Unused talentSkills not usedPastry chef washing trays

Filled in for: A small bakery's morning.

Obser­vationWaitingExtra proces­singMovementTran­sportReworkOver­productionExcess stockUnused talent

Tag each observation with one kind of waste.

In the roles

How a Process Improvement Specialist uses it

Forty observations sorted into the eight wastes: waiting has 14, rework 7 and movement 6. Patients ringing about test results are failure demand.

Questions people ask

Is all non-value work waste?

No. Some steps are required, for example by law or for safety. Reduce them, but don't remove them blindly.