Data and statistics · cheat sheet

Xbar-S chart

A pair of control charts for measured data in larger subgroups (10 or more): one for the subgroup averages, one for their standard deviations.

Common practice
6 steps
Used by Process Improvement Specialist

What it is

An Xbar-S chart is like Xbar-R but uses each subgroup's standard deviation, which measures spread better when subgroups are large.

When to use it

When subgroups have 10 or more items, or vary in size.

Why it works

With 10 or more items, the range only uses two of them; the standard deviation uses all.

Do

  • Use it for subgroups of 10 or more.

Don't

  • Using it for small subgroups, where the range works as well and is simpler.

Step by step

  1. Subgroups
  2. Averages and s
  3. Centre lines
  4. S limits B3, B4 × s̄.
  5. Average limits X̿ ± A3 × s̄.
  6. Read S first
Also called: Average and standard deviation chartPrint the blank template ↗

Worked example

The situation. A call centre samples 10 calls an hour.

  1. X̿ = 6.0 minutes, s̄ = 1.2, subgroups of 10.

The result. An hour averaging 7.4 minutes triggers a check of the system.

Xbar-S data sheet Print blank
LineCal­culationValue
Average upper limit6.0 + 0.975 × 1.27.17
Average lower limit6.0 − 0.975 × 1.24.83
S upper limit1.716 × 1.22.06
S lower limit0.284 × 1.20.34

Filled in for: A call centre samples 10 calls an hour.

SubgroupnAverageStandard devia­tion

Copy this structure, or print the blank version and fill it in by hand. n = 10: A3 0.975, B3 0.284, B4 1.716 · n = 12: A3 0.886, B3 0.354, B4 1.646

Before you use it: check these

CheckIf it fails
Subgroups of about 10 or moreUse Xbar-R for small subgroups

How to do it with real data

The full calculation, as it happens in the story: the data, every step, how to read the result, and the spreadsheet functions to do it yourself.

Worked example with real data

Xbar-S chart of phone answer times

From Day 49: Bigger samples of the Process Improvement Specialist story

At 8 o'clock, Alma (Reception Team Lead) records how long 12 callers wait for an answer (minutes), every day for 15 days. With subgroups of 10 or more, the standard deviation is a better measure of spread than the range.

Xbar chart: daily average of 12 calls01234CLUCLLCLDay 1: 2.12Day 2: 1.73Day 3: 3.12Day 4: 1.92Day 5: 2.21Day 6: 2.73Day 7: 2.43Day 8: 2.53Day 9: 2.65Day 10: 2.24Day 11: 2.6Day 12: 2.72Day 13: 2.32Day 14: 2.21Day 15: 2.29Day 1Day 3Day 5Day 7Day 9Day 11Day 13Day 15Average answer time (minutes)S chart: daily spread of 12 calls00.511.522.5CLUCLLCLDay 1: 0.76Day 2: 0.96Day 3: 1.35Day 4: 0.94Day 5: 0.96Day 6: 1.01Day 7: 1.3Day 8: 1.28Day 9: 1.47Day 10: 1.15Day 11: 1.01Day 12: 1.22Day 13: 0.93Day 14: 1.4Day 15: 1.29Day 1Day 3Day 5Day 7Day 9Day 11Day 13Day 15Standard deviation

Step by step

  1. Subgroup averages and standard deviationsfor each day, of the 12 answer times
  2. Centre linesaverage of the averages; average standard deviation= 2.39; 1.135 minutes
  3. Xbar limits2.39 ± A3 × s̄ = 2.39 ± 0.886 × 1.135 (A3 for subgroups of 12)= 1.38 to 3.39
  4. S limitsB3 × s̄ to B4 × s̄ = 0.354 × 1.135 to 1.646 × 1.135= 0.40 to 1.87
  5. Readall points inside both charts= stable
DayCall 1Call 2Call 3Call 4Call 5Call 6Call 7Call 8Call 9Call 10Call 11Call 12AverageStandard deviation
Day 11.41.93.81.63.22.51.32.42.11.61.52.12.120.76
Day 22.70.81.312.21.21.22.53.80.61.22.31.730.96
Day 31.93.53.21.84.36.33.31.64.12.4323.121.35
Day 42.33.41.13.51.32.711.12.22.11.70.71.920.94
Day 51.81.71.52.42.32.84.91.32.21.52.31.82.210.96
Day 65.12.51.22.21.63.13.42.833.11.832.731.01
Day 72.25.31.22.21.84.61.91.82.531.11.52.431.3
Day 80.83.43.41.82.12.15.71.32.71.62.82.72.531.28
Day 92.85.114.30.62.21.23.224.82.622.651.47
Day 101.42.124.13.82.30.43.71.21.62.81.52.241.15
Day 114.13131.32.31.82.53.54.11.82.82.61.01
Day 122.91.43.93.14.92.12.33.41.942.30.52.721.22
Day 131.82.31.23.31.32.41.63.73.91.52.822.320.93
Day 145.61.111.52.913.62.82.91.11.51.52.211.4
Day 151.815.13.13.83.21.90.91.12.51.51.62.291.29

How to read the result

Callers at 8 o'clock now wait about 2.4 minutes on average for an answer, steadily, down from 12 minutes in the phone queue before the project.

What it led to

Keep the answer-time check in the control plan, measured monthly instead of daily now that it's stable.

Do it in a spreadsheet

Average and standard deviation=AVERAGE(B2:M2) and =STDEV.S(B2:M2)
Limits=AVERAGE(N2:N16)+0.886*AVERAGE(O2:O16)
S limits=0.354*AVERAGE(O2:O16) and =1.646*AVERAGE(O2:O16)
Try it yourself: When should you choose Xbar-S over Xbar-R?

When subgroups have 10 or more items (or vary in size). The range only uses the two extreme values; the standard deviation uses them all.

In the roles

How a Process Improvement Specialist uses it

12 calls a day at 8 am: average 2.39 minutes, limits 1.38 to 3.39.

Questions people ask

Can subgroup sizes vary?

Yes, with limits calculated for each subgroup's size.