A few numbers that describe a set of data: where it centres (mean, median, mode), how much it spreads (range, standard deviation, quartiles) and its shape.
Common practice 5 steps Used by Process Improvement Specialist
What it is
Descriptive statistics summarise data: the centre (mean, median, mode), the spread (range, standard deviation, quartiles) and the shape.
When to use it
Whenever you need to describe data, before comparing or testing anything.
Why it works
They turn a long list of numbers into a picture anyone can follow, and they feed every later calculation.
Do
When mean and median differ a lot, the data is skewed: report the median.
Filled in for: Delivery times for 12 online orders (days): 2, 2, 3, 3, 3, 3, 4, 4, 5, 6, 9, 12.
Statistic
Value
Formula used
Copy this structure, or print the blank version and fill it in by hand. Mean · Median · Mode · Minimum · Maximum · Range · Standard deviation · Quartile 1 · Quartile 3
Before you use it: check these
Check
If it fails
Look at the data first: a histogram or run chart
If there are two peaks or a shift over time, describe each group or period separately
Data in a sensible order, with no typing errors
Check extreme values against the source before using or removing them
How to do it with real data
The full calculation, as it happens in the story: the data, every step, how to read the result, and the spreadsheet functions to do it yourself.
A typical patient waits 10 days, but the spread is wide: the middle half wait between 5 and 14 days, and some wait four weeks. The long right tail pulls the mean above the median.
What it led to
Report the median and the share over 7 days as the main baseline figures, with the histogram. Use the standard deviation for the sample size and capability.
Do it in a spreadsheet
Mean
=AVERAGE(B2:B61)
Median
=MEDIAN(B2:B61)
Mode
=MODE.SNGL(B2:B61)
Standard deviation
=STDEV.S(B2:B61)
Quartiles
=QUARTILE.INC(B2:B61,1) and =QUARTILE.INC(B2:B61,3)
Histogram
Excel: Insert, Statistic chart, Histogram. Google Sheets: Insert, Chart, Histogram
Try it yourself: How many of the 60 patients waited more than 7 days, and what share is that?
33 of 60 = 55%. Spreadsheet: =COUNTIF(B2:B61,">7")/60.
In the roles
How a Process Improvement Specialist uses it
60 waits: mean 10.4, median 10, mode 5, standard deviation 6.5, quartiles 5 and 14.25 days.