Data and statistics · cheat sheetPaired t-test
A test of whether the average change is real when the same items are measured twice, before and after, by working on the differences.
Common practice
5 steps
Used by Process Improvement Specialist
What it is
A paired t-test compares two measurements on the same items by testing whether the average difference is zero.
When to use it
When the same people, machines or items are measured under two conditions, such as before and after training.
Why it works
Each item acts as its own control, removing differences between items, so real changes show more clearly than with a two-sample test.
Do
- Check the differences, not the raw values, for normality.
Don't
- Using a two-sample test on paired data, which loses power.
- Ignoring very skewed differences (use Wilcoxon).
Step by step
Pair
Differences
Average and spread
t statistic
p-value and interval
Worked example
The situation. Eight call handlers' average call times (seconds) before and after a new script.
- Differences: 7, 5, 7, 4, 4, 7, 3, 6.
The result. Every handler got faster; the new script was adopted.
| Part | Calculation | Value |
|---|
| Average difference | 43 ÷ 8 | 5.4 seconds |
| Standard deviation of differences | | 1.60 |
| t | 5.375 ÷ (1.598 ÷ √8) | 9.51 |
| p-value | 7 degrees of freedom | below 0.0001 |
Filled in for: Eight call handlers' average call times (seconds) before and after a new script.
| Item | Before | After | Difference |
|---|
| | | |
| | | |
| | | |
| | | |
Copy this structure, or print the blank version and fill it in by hand. Average difference ______ s ______ t = average ÷ (s ÷ √n) ______ p ______
Before you use it: check these
| Check | If it fails |
|---|
| Each pair is the same item measured twice | If not, use a two-sample test |
| The differences are roughly normal | Use the Wilcoxon signed-rank test on the differences |
In the roles
How a Process Improvement Specialist uses it
Same 10 machines before and after planned maintenance (a case study): average reduction 6.7 hours a month.
Questions people ask
Spreadsheet?
=T.TEST(before, after, 2, 1): type 1 means paired.
← All techniques and tools