The sign test can't prove the median is above 7 with this sample (p = 0.14), because it ignores how far above or below each wait is. The Wilcoxon test uses those distances and shows clearly that it is (p = 0.0002).
What it led to
Use the Wilcoxon test when the data is roughly symmetrical around the median; use the sign test only when you can't trust the distances, for example with ratings. Here the conclusion matches the t-test.
Do it in a spreadsheet
Count above
=COUNTIF(B2:B61,">7")
Sign test p-value
=1-BINOM.DIST(32,57,0.5,TRUE)
Wilcoxon
rank =ABS(B2-7) with RANK.AVG, sum the ranks where B2>7; spreadsheets have no built-in p-value: use the normal approximation or a statistics add-on
Try it yourself: In another sample, 40 of 50 values are above the target and 10 below. Would the sign test show a difference?
Yes. 40 of 50 is far from 25 of 50: p = 1 − BINOM.DIST(39,50,0.5,TRUE), about 0.00001.
In the roles
How a Process Improvement Specialist uses it
Waits against 7 days: W = 1,277.5, p = 0.0002. The median is above 7.