Ways of counting defects that make processes comparable: defects per unit, defects per million opportunities, first-time yield, rolled throughput yield and the sigma level.
Common practice 5 steps Used by Process Improvement Specialist
What it is
Six Sigma metrics count defects in a way that allows comparison between very different processes. A unit is one item (an invoice, a request); a defect is any failure to meet a requirement; an opportunity is one place a defect could happen.
When to use it
When sizing a problem at the start of a project, and to compare performance before and after.
Why it works
They size the problem at the start, set a baseline, and show improvement in a common language.
Do
Write the defect and opportunity definitions down before counting.
Don't
Inflating opportunities so the process looks better.
Comparing sigma levels built on different defect definitions.
Step by step
Define unit, defect, opportunity
Defects per unit
Per million opportunities
YieldsFirst-time and rolled throughput.
Sigma levelNormal value + 1.5.
Also called: DPU, DPMO, first-time yield, rolled throughput yield, sigma levelPrint the blank template ↗
Only 28 of every 100 requests get through all three checks without a problem. A sigma level of about 2 is typical of a service process that struggles. The weakest check by far is the 7-day wait.
What it led to
Record these as the baseline in the charter: 45% within 7 days, 28% rolled throughput yield, about 313,000 defects per million opportunities. The goal is measured on the same definitions.
Do it in a spreadsheet
Total defects
=SUM(D2:D4)
Defects per unit
=D5/B2
Defects per million opportunities
=D5/(B2*3)*1000000
First-time yield
=C2/B2
Rolled throughput yield
=PRODUCT(E2:E4)
Sigma level
=NORM.S.INV(1-F2/1000000)+1.5 (F2 = defects per million)
Try it yourself: If the 7-day check improved to 90% and the others stayed the same, what would the rolled throughput yield be?
0.65 × 0.90 × 0.96 = 0.56, so 56%.
In the roles
How a Process Improvement Specialist uses it
Appointment requests: 0.94 defects per unit, 313,333 per million opportunities, rolled throughput yield 28%, sigma level about 2.0.