Data and statistics · cheat sheet

NP chart

A control chart for the number of items that fail a check, when the same number is checked every period.

Common practice
5 steps
Used by Process Improvement Specialist

What it is

An NP chart plots the number failing each period, when the same number is checked every time.

When to use it

For yes-or-no outcomes with a constant sample size, where counts are easier to read than shares.

Why it works

Counts are easier for teams to read than shares.

Do

  • Keep n exactly the same every period.

Don't

  • Using it when the sample size changes (use a P chart).

Step by step

  1. Fixed n
  2. Count failing
  3. Centre np̄
  4. Limits
  5. Investigate
Also called: Number defective chartPrint the blank template ↗

Worked example

The situation. A print shop checks 150 sheets each run.

  1. np̄ = 6 faulty sheets (p̄ = 0.04).

The result. A run with 14 faulty sheets triggered a check of the ink.

NP chart data sheet Print blank
LineCal­culationValue
Upper limit6 + 3 × √(6 × 0.96)13.2
Lower limit6 − 7.20

Filled in for: A print shop checks 150 sheets each run.

PeriodNumber checkedNumber failing

Copy this structure, or print the blank version and fill it in by hand. np̄ ______ upper limit np̄ + 3√(np̄(1 − p̄))

Before you use it: check these

CheckIf it fails
The same sample size every periodUse a P chart

How to do it with real data

The full calculation, as it happens in the story: the data, every step, how to read the result, and the spreadsheet functions to do it yourself.

Worked example with real data

NP chart: missed appointments in a fixed sample

From Day 50: Counting yes or no of the Process Improvement Specialist story

Each day, 50 appointments are checked for missed or attended. With a fixed sample size, the count can be charted directly.

NP chart: missed appointments out of 50 a day02.557.51012.5CLUCLDay 1: 5Day 2: 3Day 3: 1Day 4: 1Day 5: 6Day 6: 7Day 7: 5Day 8: 5Day 9: 4Day 10: 7Day 11: 6Day 12: 0Day 13: 6Day 14: 1Day 15: 5Day 16: 2Day 17: 6Day 18: 4Day 19: 3Day 20: 4Day 1Day 4Day 7Day 10Day 13Day 16Day 19Missed out of 50

Step by step

  1. Average countaverage missed per day= 4.05 of 50 (8.1%)
  2. Limits4.05 ± 3 × √(4.05 × (1 − 0.081))= 0 to 9.84
  3. Readall points inside= stable
DayAppointments checkedMissed
Day 1505
Day 2503
Day 3501
Day 4501
Day 5506
Day 6507
Day 7505
Day 8505
Day 9504
Day 10507
Day 11506
Day 12500
Day 13506
Day 14501
Day 15505
Day 16502
Day 17506
Day 18504
Day 19503
Day 20504

How to read the result

Missed appointments are stable at about 8%, half the old 15.7%.

What it led to

Keep the NP chart weekly for three months, then monthly if it stays stable.

Do it in a spreadsheet

Average=AVERAGE(C2:C21)
Upper limit=D1+3*SQRT(D1*(1-D1/50))
Try it yourself: When would you use a P chart instead of an NP chart?

When the number checked each day varies. NP charts need a constant sample size.

In the roles

How a Process Improvement Specialist uses it

Missed appointments out of 50 a day: centre 4.05, upper limit 9.84.

Questions people ask

When should I switch to a P chart?

As soon as the number checked varies.