Backlog craft · cheat sheet Acceptance criteria and Given/When/Then The conditions an item must meet to do what the user needs, written so anyone can check them.
Common practice 6 steps Used by Product Owner, Project Manager
What it is Acceptance criteria are the specific, testable conditions something must meet to be accepted. They answer: how will we know this is done and right?
When to use it For every item before it is selected in Sprint Planning. Different from the Definition of Done, which applies to all items.
Why it works They remove ambiguity before work starts, give testers something to check, and stop arguments at the end about whether something is finished.
Do Five to eight criteria per item is usually plenty; more suggests the item should be split. Don't Confusing them with the Definition of Done. Writing them alone and handing them over. Step by step Write them before the work starts Together with the people who'll use and build it.
Make each one testable Yes or no, not “user-friendly”.
Cover the important cases The normal case, edge cases, errors and limits.
Keep them about the result What, not how it's built.
Use a clear format A simple list, or Given / When / Then: Given a situation, When something happens, Then this result.
Check them at the end Accept only when every criterion is met.
PreviewAcceptance criteria and Given/When/Then Backlog craft People must agree, before work starts, what “done and right” means. 6 Closing and transition · cheat sheet Dress rehearsal A realistic trial of going live, with real people and pretend cases, to find problems before real users do.
Common practice 5 steps Used by Project Manager
What it is A realistic trial of going live, with real people and pretend cases, to find problems before real users do.
When to use it A week or two before going live, early enough to fix what it finds.
Why it works Problems found in a rehearsal are cheap to fix; problems found on go-live day hurt customers and reputation.
Do A rehearsal that finds nothing probably wasn't realistic. Don't Rehearsing too late to fix anything. Only easy cases, so nothing is found. Step by step Pick realistic cases Including awkward ones.
Use real people, systems and times As close to the real thing as possible.
Observe and note everything However small.
Give each finding an owner and a fix date Prioritise critical ones.
Re-test the critical fixes Before go-live.
PreviewDress rehearsal Closing and transition Something goes live soon and problems must be found first. 5 Closing and transition · cheat sheet Go or no-go review A meeting that decides whether to go live, based on an agreed readiness checklist rather than the announced date.
Common practice 5 steps Used by Project Manager
What it is A meeting that decides whether to go live, based on an agreed readiness checklist, not on the announced date.
When to use it Shortly before going live, after the rehearsal and the final checks.
Why it works It makes go-live a conscious decision with fallbacks, rather than momentum.
Do Decide who has the final say before the meeting. Don't Going live because the date was announced. Hidden “amber” items with no fallback. Step by step Agree criteria in advance And which are critical.
Review each item with its owner Green, amber, red.
Agree fallbacks For anything not fully ready.
Decide Go, go with fallbacks, or no-go.
Confirm the first days' support Who does what after go-live.
PreviewGo or no-go review Closing and transition The go-live date arrives and readiness must be decided on facts. 5 Closing and transition · cheat sheet Hypercare A short, planned period after going live where project and operations staff work side by side to fix teething problems quickly.
Common practice 5 steps Used by Project Manager
What it is A short, planned period after go-live where project and operations staff work side by side to fix teething problems fast.
When to use it The first weeks after going live.
Why it works The first days after go-live expose problems nobody predicted. Fast fixes protect users and the new team's confidence.
Do End it on the agreed date, or operations never fully own the result. Don't Disappearing on go-live day. Never ending it, so operations never take full ownership. Step by step Agree the length Often two to six weeks.
Place people where problems appear Front desk, systems, phones.
Log every issue Fix urgent ones the same day.
Hand lasting fixes to operations With documentation.
End on the agreed date Open items owned by operations.
PreviewHypercare Closing and transition Something has just gone live and teething problems will appear. 5 Coaching · cheat sheet Active listening Listening to understand, then showing you understood, before giving any view of your own.
Common practice 6 steps Used by Scrum Master, Project Manager
What it is Listening to fully understand: attention on the speaker, checking understanding, and reflecting back what you heard before responding.
When to use it In every coaching conversation, and when people are upset.
Why it works People who feel heard are more open to solutions. You also learn what the real issue is.
Do Agreeing isn't required; understanding is. Step by step Give full attention No phone, no preparing your answer.
Let them finish Don't interrupt.
Reflect back “So what I'm hearing is…”
Ask open questions To understand more.
Acknowledge feelings “That sounds frustrating.”
Only then respond With facts or proposals.
PreviewActive listening Coaching Someone is upset or a conversation keeps going round in circles. 6 Coaching · cheat sheet Difficult conversations Talking openly and respectfully about a problem, such as performance or behaviour, by describing specific facts, listening to the other side, and agreeing a way forward.
Common practice 6 steps Used by Project Manager
What it is Talking openly and respectfully about a problem, such as performance or behaviour, using specific facts, listening to the other side, and agreeing a way forward.
When to use it As soon as a problem is noticed, privately.
Why it works Avoided problems grow. An early, fair conversation usually solves things before formal steps are needed, and keeps trust.
Do Separate the person from the behaviour. Follow HR guidance if things become formal. Don't Waiting until it's a crisis. Generalising (“you always…”). Step by step Prepare Specific facts, their impact, and the outcome you want.
Meet privately and soon Not by email.
Describe, don't judge “The plan was due Tuesday and arrived Friday”, not “you're unreliable”.
Ask and listen “What's getting in the way?”
Agree expectations and support Clear, specific, with dates.
Follow up Recognise improvement; escalate fairly if needed.
PreviewDifficult conversations Coaching Someone's work or behaviour needs to change and you must say so. 6 Coaching · cheat sheet One-on-ones Regular short conversations with each person, to understand them and help them grow.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is Regular, private conversations between a lead and each team member about how they are, their work, obstacles and growth.
When to use it From the first week, and after hard moments like conflict.
Why it works Problems, ideas and concerns surface early when people have a regular, safe place to raise them.
Do Cancelling one-on-ones tells people they're not a priority. Don't Turning them into status updates or performance reviews. Step by step Set a rhythm Every one to two weeks, 20 to 30 minutes.
Let them own the agenda Their topics first.
Ask how they are Workload, energy, blockers.
Listen more than talk Take notes on commitments.
Follow up On what you promised.
PreviewOne-on-ones Coaching You want problems and ideas to surface early from each person. 5 Discovery and evidence · cheat sheet Prototyping and mock-ups Letting users try a simple version of a design (paper screens, cardboard rooms, clickable models) before it's built for real.
Common practice 5 steps Used by Project Manager
What it is Building a quick, cheap version of a design (paper screens, cardboard rooms, clickable models) so users can try it before the real thing is built.
When to use it When it's hard to judge a design from drawings or descriptions, and before costly building starts.
Why it works People can't judge a design from drawings as well as from trying it. Problems found on a prototype cost a tiny fraction of problems found later.
Do Rough prototypes get more honest feedback than polished ones. Don't Polishing the prototype instead of learning. Testing with the design team instead of real users. Step by step Decide the question What do we want to learn?
Build the cheapest thing that answers it Low fidelity first.
Use real tasks Ask users to do what they'd really do.
Watch and listen Behaviour beats opinions.
Change and repeat Until the big problems are gone.
PreviewPrototyping and mock-ups Discovery and evidence Users can't judge a design from drawings and changes later would be costly. 5 Discovery and evidence · cheat sheet Sprint Review (for stakeholders) In agile work, a regular session where the team shows what it built, stakeholders try it and give feedback, and the next steps are adjusted.
Common practice 6 steps Used by Project Manager
What it is In agile work, a regular session at the end of each cycle where the team shows what it built, stakeholders try it, and together they adjust what comes next.
When to use it Every Sprint or iteration, typically every one to four weeks.
Why it works Seeing and using real results is the fastest way to find out if work meets needs. Stakeholder feedback directly shapes the next steps.
Do As a project manager in a hybrid project, attend: it's where you see real progress. Don't Treating it as a status meeting. Giving developers direct instructions instead of feedback to the Product Owner. Step by step Know the goal of the cycle What was the team aiming for?
Bring the right people Users and stakeholders, not just managers.
Try the working results Hands on, not slides.
Give specific feedback Needs, problems, priorities.
Talk about what's next The person who orders the backlog decides, using what was heard.
Follow up See what changed in the next cycle.
PreviewSprint Review (for stakeholders) Discovery and evidence An agile team shows results and stakeholders should shape what comes next. 6 Estimation · cheat sheet Analogous estimating Estimating from a similar past project, adjusted for the differences. Fast, but rough.
Common practice 5 steps Used by Project Manager
What it is Estimating a new piece of work from a similar past one, adjusted for differences. It's top-down and quick.
When to use it Early on, when little detail is known: in the business case or the charter.
Why it works When little is known, history is the best guide. It gives a reasonable first number for decisions like “is this worth doing?”.
Do Use actuals from the past project, not its original estimate. Don't Treating a rough comparison as a commitment. Comparing projects that aren't really alike. Step by step Find a comparable past project Similar type, size and context, with known actual costs and durations.
List the differences Size, location, prices, technology, team experience.
Adjust Scale up or down for each difference, and adjust for price changes since then.
Give a range Analogous estimates are rough; say so with a range, for example −25% to +50%.
Replace it later Once the work is broken down, make a bottom-up estimate.
PreviewAnalogous estimating Estimation Little is known yet and a similar past project exists. 5 Estimation · cheat sheet Bottom-up estimating Estimating each small piece of work separately and adding them up. Slower, but more accurate.
Common practice 6 steps Used by Project Manager
What it is Estimating each small piece of work separately and adding them up. It needs a work breakdown and is slower, but more accurate.
When to use it Once the work is broken down (a WBS exists) and quotes or expert input are available.
Why it works Small pieces are easier to estimate well, and the people doing the work can estimate their own parts.
Do Don't let each estimator pad silently; padding hidden everywhere adds up to a lot. Don't Every estimator adding their own hidden buffer. Forgetting management, testing or handover work. Step by step Start from the work breakdown Each lowest-level work package is estimated.
Estimate with the people doing the work Use quotes, rates and past data.
Record assumptions What each estimate includes and assumes (the basis of estimate).
Add up by branch Then the whole project.
Add contingency visibly For identified risks, as a separate line, not hidden in each estimate.
Compare with the top-down figure Explain any big difference before anyone decides.
PreviewBottom-up estimating Estimation The work is broken down and you need an accurate budget. 6 Estimation · cheat sheet Three-point estimating Estimating uncertain work with three numbers (best, most likely, worst case) and combining them into a more realistic figure.
Common practice 5 steps Used by Project Manager
What it is Instead of one number, you ask for three: the best case, the most likely case and the worst case. A weighted average gives a more realistic estimate, and the spread shows the uncertainty.
When to use it When an activity is uncertain or has never been done quite like this before.
Why it works Single numbers hide risk and are usually optimistic. Asking for the worst case makes people think about what could go wrong, and the spread tells you which estimates deserve attention.
Do Make sure the worst case is really bad, not “likely plus a bit”. Add estimates for whole chains with care: the chance of everything going to plan is small. Don't Asking for three numbers but only using the most likely one. Worst cases that are really just “likely plus a bit”. Step by step Pick the uncertain activities Use three-point estimates where it matters: long, new or risky work.
Ask the people who'll do the work Get best, most likely and worst cases. Ask what would have to happen for each.
Calculate Weighted (beta) average: (best + 4 × likely + worst) ÷ 6. Simple (triangular) average: (best + likely + worst) ÷ 3.
Look at the spread Worst minus best. A wide spread means a risk to watch and maybe to respond to.
Use it in the plan Schedule with the weighted estimate, record the range, and add contingency for the risky chains.
PreviewThree-point estimating Estimation An activity is uncertain and one number would hide the risk. 5 Facilitation · cheat sheet Kick-off meeting The first meeting with everyone involved, to align on why the project exists, what it will deliver, who does what and how the team will work.
Common practice 6 steps Used by Project Manager
What it is The first meeting with everyone involved in a project, to align on purpose, scope, roles, ways of working, risks and first actions.
When to use it Once the project is authorised and the main people are known, before the detailed work starts.
Why it works People who start with the same picture make fewer conflicting assumptions, and a good start builds momentum and trust.
Do Leave at least a quarter of the time for questions. Send the notes the same day. Don't A long presentation with no conversation. No actions at the end. Missing key people, such as suppliers or users. Step by step Prepare Agenda, pre-read (charter summary), invite the right people including suppliers and users.
Open with why The sponsor explains why the project matters.
Cover what and who Objective, scope, milestones, roles (a RACI helps).
Agree how Ways of working, meetings, communication, decisions.
Surface risks and questions Give real time; park long debates.
Close with actions Owners and dates; send notes the same day.
PreviewKick-off meeting Facilitation A project or big piece of work is about to start with many people. 6 Facilitation · cheat sheet Parking lot A visible list for good topics that don't belong in the current discussion, so they aren't lost.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is A visible list where off-topic or too-long discussions are “parked” during a meeting, with a promise to deal with them later.
When to use it In any event that starts drifting, especially the Daily Scrum.
Why it works It keeps meetings on track without dismissing important points.
Do Never let the parking lot become a graveyard. Don't A parking lot nobody ever empties. Step by step Set it up at the start A flip chart or shared note.
Park topics politely “Important; let's park it so we finish the agenda.”
Note who raised it And what they need.
Review it at the end Decide for each: owner, date, or drop.
Follow up Or people stop trusting the parking lot.
PreviewParking lot Facilitation An important side topic threatens to take over a meeting. 5 Facilitation · cheat sheet Timeboxing Give an event or activity a maximum length, and end it on time.
Named in the Scrum Guide 5 steps Used by Scrum Master, Product Owner, Project Manager
What it is Giving an activity a fixed maximum length of time and ending it when the time is up, whatever the state.
When to use it For every Scrum event (the Scrum Guide sets maximum durations) and for workshops or discussions that tend to drift.
Why it works It stops meetings and tasks from expanding, forces focus on what matters, and makes planning predictable.
Do A time box is a maximum; finishing early is fine. Don't Ending on time without an outcome. Letting the most senior person extend it. Step by step Set the time box Before starting.
Share the goal of the time box What should be done by the end?
Make time visible A clock or timer.
Check in near the end Five minutes left: what's most important?
Stop on time Decide what to do with anything unfinished.
PreviewTimeboxing Facilitation Meetings or tasks keep expanding to fill all available time. 5 Facilitation · cheat sheet Urgent vs important Sorting tasks by urgency and importance into four boxes: do now, schedule, delegate, drop.
Common practice 6 steps Used by Project Manager
What it is Sorting tasks by urgency and importance into four boxes: do now (urgent, important), schedule (important, not urgent), delegate (urgent, not important), drop (neither).
When to use it When there's more to do than time, every day for busy leaders.
Why it works Busy leaders drift into urgent but unimportant work. The matrix protects time for the important work that drives results.
Do If everything is urgent, look at why; it often points to missing planning. Don't Spending all day on urgent but unimportant things. Never scheduling the important work. Step by step List everything on your plate Emails, meetings, requests, tasks.
Mark important or not Does it serve the project's goals?
Mark urgent or not Does it need doing now?
Sort into the four boxes Do, schedule, delegate, drop.
Block time For the “schedule” box, in your calendar.
Review daily or weekly Things move between boxes.
PreviewUrgent vs important Facilitation There's more to do than time and urgent things crowd out important ones. 6 Facilitation · cheat sheet Working agreements A short list of how the team chooses to work together, written by the team itself.
Common practice 5 steps Used by Scrum Master, Project Manager, Process Improvement Specialist
What it is A short list of rules a team agrees about how it works together: meetings, communication, decisions, availability.
When to use it When a team starts, when new people join, or after friction.
Why it works Unspoken expectations cause friction. Agreeing them openly makes behaviour predictable and gives a fair way to raise problems.
Do Five to eight agreements is enough. Don't Rules written by the Scrum Master for the team. Agreements nobody looks at again. Step by step Ask what's causing friction Or what people value.
Propose short agreements Specific behaviours, not values.
Agree together Everyone can live with each one.
Make them visible On the team board or page.
Review them Every few weeks, or when friction returns.
PreviewWorking agreements Facilitation Unspoken expectations are causing friction in a team. 5 Forecasting · cheat sheet Burn-up and burn-down charts Charts of work done over time that show a likely range for when a set of work might be finished.
Named in the Scrum Guide 6 steps Used by Product Owner, Scrum Master, Project Manager
What it is A chart with two lines over time: total work in scope and work completed. Where the completed line is heading shows when the work is likely to finish.
When to use it To answer “when?” with evidence. The Scrum Guide names burn-downs and burn-ups as useful, but says they don't replace empiricism.
Why it works It shows progress and scope changes on one chart, so stakeholders see both why dates move and how fast work is getting done.
Do Always show a range; a single line suggests false certainty. Don't Promising the fastest line. Using burn-downs to pressure the Developers. Step by step Choose a unit Items, points or value.
Plot total scope It goes up when scope is added.
Plot completed work Each period.
Draw the trend Use a range from slow to fast periods, not one line.
Read the forecast Where the completed range meets the scope line.
Update every period And explain scope changes.
PreviewBurn-up and burn-down charts Forecasting You want to show progress and scope changes together, with a forecast. 6 Governance and roles · cheat sheet Management by exception Leaders agree limits (tolerances) for cost, time and scope; the project manager acts freely inside them and escalates only when a limit will be exceeded.
Common practice 6 steps Used by Project Manager
What it is Leaders agree limits (tolerances) for time, cost, scope, quality and risk. Within them, the project manager decides; beyond them, the issue is escalated at once.
When to use it When the project starts and the governance is set up; used every day after that.
Why it works It lets leaders steer without attending every meeting, and lets the project manager act quickly within clear limits.
Do Tolerances too tight mean everything escalates; too wide, and leaders lose control. Don't Tolerances so tight that everything is escalated. Escalating a problem without options. Hiding a breach until it can't be hidden. Step by step Agree tolerances For example ± €25,000 or ± 2 weeks per stage.
Write them down In the charter or plan.
Decide inside them And report afterwards.
Forecast regularly So you see an exception coming.
Escalate at once when a forecast exceeds them With options and a recommendation.
Let leaders review at set points Stage ends, monthly boards.
PreviewManagement by exception Governance and roles Leaders want control without being in every decision. 6 Governance and roles · cheat sheet RACI A simple way to say who is Responsible, Accountable, Consulted and Informed for each piece of work or decision.
Common practice 6 steps Used by Project Manager, Process Improvement Specialist
What it is A RACI chart is a grid. Down the side are the pieces of work or decisions; across the top are people or roles. In each cell you write one letter: R, A, C or I.
R (Responsible) does the work. A (Accountable) owns the result and signs it off; there is exactly one per row. C (Consulted) is asked for input before. I (Informed) is told after.
When to use it When several people or organisations work on the same deliverables, or when ownership is unclear or disputed.
Variations RASCI adds S for Support: people who help the responsible person.DACI Driver, Approver, Contributors, Informed: used for decisions rather than deliverables.Delegation levels a finer scale for how much a team decides on its own.Why it works Most project friction comes from unclear ownership: two people both think they decide, or nobody does. A RACI makes the assumptions visible so they can be agreed before they cause trouble.
Because each row has exactly one A, the chart also tells you who to go to when something about that deliverable needs a decision.
Do Build it with the people named, not alone at your desk. When someone is accountable for everything, nobody else feels accountable for anything. Keep it to one page; link to it from the project plan. Don't Two people accountable for one thing, or nobody. Consulting everyone on everything. Making the chart alone and announcing it. Step by step List what needs owning Write the main deliverables and the recurring decisions, one per row. Ten to twenty rows is usually enough; more detail rarely helps.
List the people or roles Use roles where people may change, names where it helps. Include suppliers and approvers, not just the core team.
Fill in A first For each row, agree who is accountable. If two people claim it, settle it now with the sponsor. If nobody wants it, that's a risk to raise.
Add R, then C and I Responsible can be several people. Keep C small: every C is someone who can slow a decision down. I is cheap; use it generously.
Check the columns A column full of R's is an overloaded person. A column of only I's may not need to be in the meetings. A column with no letters may be a missing stakeholder.
Agree it, then use it Walk through it with everyone named. Share it, refer to it in disputes, and update it when people or deliverables change.
PreviewRACI Governance and roles Two people think they own the same thing, or nobody does. 6 Governance and roles · cheat sheet Stage gate A decision point at the end of each stage where the board decides to continue, continue with conditions, or stop.
Common practice 5 steps Used by Project Manager, Process Improvement Specialist
What it is A decision point at the end of a stage where leaders decide to continue, continue with conditions, or stop, based on evidence.
When to use it At the end of every management stage.
Why it works It makes continuing a conscious decision, checks the business case regularly, and lets projects stop before more money is wasted.
Do A gate where “stop” is never an option isn't a gate. Don't A gate nobody would ever close. Gates without an updated business case. Step by step Prepare an end-stage report Performance against baselines, risks, lessons.
Update the business case Costs, benefits, dates.
Present the next stage's plan What, when, how much.
Decide Go, go with conditions, or stop.
Record the decision And any conditions.
PreviewStage gate Governance and roles A stage ends and someone must decide whether to continue. 5 Governance and roles · cheat sheet Tailoring the approach Adapting how a project is run (life cycle, documents, controls, meetings) to its size, risk and type of work, and choosing predictive, agile or hybrid for each part.
Common practice 6 steps Used by Project Manager
What it is Adapting how a project is run (its life cycle, documents, controls and meetings) to its size, risk and kind of work. It includes choosing predictive, agile or hybrid delivery for each part.
When to use it At the start of a project, and at stage ends if the situation changes.
Why it works No method fits every project as written. Too much process wastes time; too little loses control. Tailoring keeps what's useful and explains what's left out.
Do Write down what you dropped and why; auditors and sponsors will ask. Don't One approach forced on everything. Dropping controls without saying why. Step by step Look at each part of the work How clear are requirements? How costly is change? How much do users need to try things?
Choose the approach per part Predictive for clear, costly-to-change work; agile where learning from users matters; hybrid to combine them.
Choose the controls Which documents, reviews and meetings does this project actually need?
Agree with the standards owner The portfolio office or PMO.
Record the decisions and why In the plan.
Review at stage ends Adjust if the situation changes.
PreviewTailoring the approach Governance and roles A standard method or one approach doesn't fit every part of the work. 6 Governance and roles · cheat sheet Work authorisation Formally handing a piece of work to a team or supplier, with what to deliver, how it's accepted, dates, limits and reporting, so it starts at the right time with clear ownership.
Common practice 6 steps Used by Project Manager
What it is Formally handing a piece of work to a team or supplier with what to deliver, acceptance criteria, dates, limits and reporting.
When to use it Each time a piece of work starts during executing.
Why it works It makes ownership clear and gives everyone the same picture of “done”, which prevents disputes later.
Do Verbal go-aheads are easily forgotten; write it down, even briefly. Don't Starting work with a verbal “go ahead”. No acceptance criteria, so “done” is argued about later. Step by step Take the work package From the WBS and schedule.
Write what and how accepted Deliverables and criteria.
Add dates, effort and tolerances How far time and cost may move.
Agree reporting How and how often.
Both sides confirm Then work starts.
Close it on acceptance And record actual effort.
PreviewWork authorisation Governance and roles A piece of work starts and ownership must be unmistakable. 6 Monitoring and control · cheat sheet Change board The agreed group or person that decides on changes beyond the project manager's authority, based on impact and options.
Common practice 5 steps Used by Project Manager
What it is The agreed person or group that decides on changes beyond the project manager's authority, based on impact and options.
When to use it Set up in planning; meets when a change needs a decision, or at regular intervals.
Why it works It makes sure significant changes are decided by the right people, consistently, and recorded.
Do Batch small changes for regular meetings; urgent ones can be decided by email with a record. Don't Every small change going to the board. Decisions taken outside the board, then reported. Step by step Define authority levels Project manager within tolerance; board above it.
Choose members Sponsor, user side, supplier side where relevant.
Decide on evidence Impact analysis and options.
Record decisions and reasons In the change log.
Make sure updates happen Plans, baselines, contracts, communication.
PreviewChange board Monitoring and control A change is beyond the project manager's authority. 5 Monitoring and control · cheat sheet Earned value A way to measure progress objectively by comparing the work planned, the work actually done (valued at its budget) and what it actually cost.
Common practice 6 steps Used by Project Manager
What it is Earned value compares three numbers at a point in time: planned value (the budgeted cost of the work planned by now), earned value (the budgeted cost of the work actually done) and actual cost (what that work really cost).
From them come two simple indices: schedule performance (EV ÷ PV) and cost performance (EV ÷ AC). Below 1 means behind schedule or over cost.
When to use it Throughout executing, at each reporting period, on any project with a time-phased budget.
Variations Earned schedule expresses schedule performance in time units instead of money.Burn-up chart a visual cousin used in agile work.Why it works Comparing money spent with money planned says nothing about progress: you might have spent less because nothing happened. Earned value ties money to the work actually done.
It gives an early, objective warning, and a way to forecast the final cost while there's still time to act.
Do Agree the progress rules before work starts; arguments about “percent complete” ruin earned value. Show the trend, not just one point: three periods of falling CPI say more than one low number. Don't Measuring progress by money spent. Guessing percent complete instead of using clear rules (for example 0/100 or 50/50 per task). Step by step Make a time-phased budget Each piece of work has a budget and a planned time. Adding them up by period gives the planned value curve.
Agree how to measure progress Use simple rules per task: 0/100 (counts only when done), 50/50 (half when started), or measured milestones. Avoid guessing percentages.
At each reporting date, collect three numbers PV from the plan, EV from the progress rules, AC from finance.
Calculate the indices SPI = EV ÷ PV, CPI = EV ÷ AC. Also the variances: SV = EV − PV, CV = EV − AC.
Forecast the finish Estimate at completion: if past overruns were one-offs, AC + (budget − EV). If they'll continue, budget ÷ CPI.
Act on it Look for causes behind low indices, report honestly, and decide on actions before the gap grows.
PreviewEarned value Monitoring and control You need to know if you're really on schedule and on budget. 6 Monitoring and control · cheat sheet Impact analysis Working out what a proposed change does to scope, time, cost, quality, risk and other work before anyone decides.
Common practice 5 steps Used by Project Manager
What it is Working out what a proposed change does to scope, time, cost, quality, risk and other work before anyone decides.
When to use it For every change request, and for operational requests that might touch the project.
Why it works Changes that look small often have hidden knock-on effects. Knowing the impact makes decisions fair and fast.
Do Include the impact of not making the change. Don't Deciding first and assessing afterwards. Missing knock-on effects on other teams or suppliers. Step by step Describe the change and the reason Clearly.
Ask the people who'll do the work For time and cost.
Check knock-on effects Critical path, other teams, contracts, risks, benefits.
Prepare options Now, later, differently, or not at all.
Recommend one And send it to the right decision-maker.
PreviewImpact analysis Monitoring and control Someone asks for a change and you need its real cost before deciding. 5 Monitoring and control · cheat sheet RAG status Showing status as red, amber or green per area, using rules everyone has agreed, so the colour means the same to everyone.
Common practice 5 steps Used by Project Manager
What it is Showing status as red, amber or green per area, using rules everyone has agreed, with a one-line reason.
When to use it In status reports and dashboards, every reporting period.
Why it works It gives leaders a quick, comparable view, but only if the colours mean the same thing to everyone.
Do A watermelon (green outside, red inside) report destroys trust when it's discovered. Don't “Watermelon” reports: green outside, red inside. Colours without reasons. Step by step Agree the rules Green: on plan. Amber: off plan, recoverable within tolerance, with a plan. Red: beyond tolerance or needs a decision.
Rate each area Scope, time, cost, quality, risk.
Add a reason Always one line why.
Report the rule's colour Not the comfortable one.
Watch trends Amber for many weeks is a warning too.
PreviewRAG status Monitoring and control Leaders need a quick, honest view of status they can trust. 5 Organisation and impediments · cheat sheet Dependency board A shared, visible map of what each team needs from others, and when.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is A visual board showing which teams or suppliers are waiting for which others, and when.
When to use it As soon as two or more teams depend on each other.
Why it works Dependencies between teams are where most delays hide. Seeing them early lets you plan handovers instead of discovering gaps.
Do A three-week look-ahead is often enough to avoid most surprises. Don't Discovering dependencies at integration time. Step by step List teams or suppliers Across the top or side.
Add each dependency Who needs what from whom, by when.
Draw the links Strings, lines or arrows.
Review weekly In a short coordination meeting.
Flag the at-risk ones And escalate early.
PreviewDependency board Organisation and impediments Several teams or suppliers wait on each other. 5 Organisation and impediments · cheat sheet Escalating impediments Move a blocker to the people who can decide, with the impact made clear, quickly and openly.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is An agreed route for problems a person or team can't solve themselves: who to go to, how quickly, and with what information.
When to use it When the team can't remove an impediment on its own.
Why it works Without a clear path, problems either sit unsolved or jump straight to the top. A good path gets decisions at the right level, fast.
Do Escalating isn't failing; waiting too long is. Don't Escalating everything, so nobody listens. Workarounds that hide the problem. Step by step Define levels Team → project manager → sponsor or board.
Set triggers Time (stuck for two days), size (beyond tolerance), type (safety, legal).
Agree response times For example same day, two days.
Escalate with options Problem, impact, options, recommendation.
Record outcomes In the issue or decision log.
PreviewEscalating impediments Organisation and impediments A problem is beyond what you or your team can solve. 5 Prioritisation · cheat sheet MoSCoW Sort items for a release or goal into Must have, Should have, Could have and Won't have this time.
Common practice 6 steps Used by Product Owner, Project Manager
What it is A way to sort requirements into four groups: Must have, Should have, Could have and Won't have (this time). It forces honest choices about what really matters.
When to use it For a fixed date or release, to agree what is truly essential. Less useful for ordering a whole backlog one item at a time.
Why it works When everything is “high priority”, nothing is. MoSCoW makes trade-offs explicit and agreed, so that when time or money is short, everyone already knows what gives way.
Do Ask “what if we don't?” for every must. Won't doesn't mean never; date it or link it to a later stage. Don't Everything becomes a Must. Treating “Won't” as “never” instead of “not this time”. Step by step Agree what “must” means Must = without it, the result is useless, unsafe or illegal. Everything else is not a must.
List the requirements One per line, clear enough that people agree what each means.
Sort them together With the users and decision-makers. Challenge every must: “What happens if we don't have it?”
Check the balance A common rule: musts use no more than about 60% of the effort, so there is room to absorb surprises.
Record the won'ts Write down what is not included this time, and why. It prevents the same debate later.
Revisit at each stage Priorities change; re-sort when they do.
PreviewMoSCoW Prioritisation Everything is called a priority and time or money is fixed. 6 Prioritisation · cheat sheet Value vs effort Place items on a simple grid of how valuable they are against how much effort they take.
Common practice 5 steps Used by Product Owner, Project Manager
What it is A simple 2×2 grid: value on one axis, effort on the other. Items land in four boxes: quick wins (high value, low effort), big bets, fill-ins and time sinks.
When to use it As a first, fast sort of a messy backlog, and to explain ordering to stakeholders visually.
Why it works It makes trade-offs visible at a glance, so a group can agree what to do first without long debates.
Do Effort estimates should come from the people who'd do the work. Don't Forgetting dependencies: a quick win may need something else first. Letting the loudest stakeholder decide where “value” sits. Step by step List the options Features, improvements or ideas, one per card.
Agree what value means For example revenue, customer impact, risk reduced.
Score value and effort Rough is fine: low, medium, high.
Place them on the grid Discuss outliers.
Decide Quick wins first, plan big bets carefully, fit fill-ins where there's room, drop time sinks.
PreviewValue vs effort Prioritisation You must pick quickly among many options with limited capacity. 5 Prioritisation · cheat sheet WSJF and cost of delay Do first what loses the most value per week of waiting, divided by how long it takes.
Common practice 5 steps Used by Product Owner, Project Manager
What it is Weighted Shortest Job First: rank work by the cost of waiting divided by its size. Things that lose a lot of value by waiting, and are small, go first.
When to use it When several big items compete and waiting has a real cost, for example a competitor or a deadline.
Why it works It adds the cost of delay to prioritisation. A small, urgent item can be worth more now than a big valuable one later.
Do Use relative numbers (like 1, 2, 3, 5, 8, 13), not money, unless you really know it. Don't Fake precision: the scores are rough relative guesses. Using it for small items where a quick conversation is faster. Step by step Estimate the cost of delay Often as the sum of three relative scores: value to users, time criticality, and risk reduction or opportunity.
Estimate the size Relative size or duration.
Divide WSJF = cost of delay ÷ size.
Rank by the result Highest first.
Re-score regularly Time criticality changes, especially near deadlines.
PreviewWSJF and cost of delay Prioritisation Waiting costs differ between items and you must choose what goes first. 5 Problem-solving · cheat sheet 5 Whys Ask “why?” several times to get from a symptom to the cause you can actually fix.
Common practice 6 steps Used by Scrum Master, Project Manager, Process Improvement Specialist
What it is A simple way to find the root cause of a problem: ask “why?” about the problem, then about the answer, and so on, until you reach a cause you can fix in the process.
When to use it When the same problem keeps coming back.
Variations Fishbone diagram for problems with several possible causes.Fault tree for complex technical failures.Why it works Most first answers are symptoms. Fixing symptoms means the problem returns. Asking why several times moves the discussion from people to the system they work in.
Do Do it with the people closest to the work. Several answers at one step? Follow each branch. Don't Stopping at a person (“because Abel (IT Operations Manager) didn't…”) instead of a process. Step by step Write the problem clearly One specific sentence: what happened, where, how often. Not “quality is bad”.
Ask why it happened Write the answer as a fact you can check.
Ask why again, about that answer Repeat. Five is a guide; stop when you reach something in the process you can change.
Check the chain Read it backwards with “therefore”. If it doesn't make sense, a step is missing or wrong.
Agree a fix for the root cause Give it an owner and a date. Then check later whether the problem stopped.
Keep it blameless If the answer is a person, ask why the process allowed it.
Preview5 Whys Problem-solving A problem keeps coming back after you fix it. 6 Problem-solving · cheat sheet Blameless review Look at what went wrong by asking how the system allowed it, not who to blame.
Common practice 6 steps Used by Scrum Master, Project Manager, Process Improvement Specialist, Product Owner
What it is A review of something that went wrong that focuses on how the system and process allowed it, not on who to blame.
When to use it After a failure, a shortcut that backfired, or an incident.
Why it works When people fear blame, they hide problems. Blameless reviews surface the real causes and lead to lasting fixes.
Do “Human error” is a starting point, not a conclusion. Don't Saying “blameless” but still naming a culprit. Step by step State the purpose Learning, not blaming.
Build a timeline What happened, in order, from all perspectives.
Ask how, not who How did the process allow this?
Find contributing causes Usually several.
Agree improvements With owners and dates.
Share the learning So others benefit.
PreviewBlameless review Problem-solving Something went wrong and you want to fix the process, not find a culprit. 6 Problem-solving · cheat sheet Fishbone diagram A diagram that groups possible causes of a problem into categories, to look at it from every side.
Common practice 6 steps Used by Scrum Master, Project Manager, Process Improvement Specialist
What it is A diagram that looks like a fish skeleton: the problem is the head, and the bones are categories of possible causes, such as people, process, materials, equipment, environment and measurement.
When to use it For bigger problems with many possible causes.
Why it works It helps a group explore many possible causes systematically, instead of jumping to the first explanation.
Do Check causes with evidence before acting. Don't Listing causes without checking any. Step by step Write the problem at the head Specific and factual.
Draw the main bones Choose categories that fit your work.
Brainstorm causes on each bone Ask “why could this happen?”.
Dig deeper Add smaller bones for causes of causes.
Check the likely ones With data or tests.
Fix the root cause And check it worked.
PreviewFishbone diagram Problem-solving A problem may have several causes and you want to explore them all. 6 Problem-solving · cheat sheet Pareto chart A bar chart of problems grouped by cause, sorted from most to least frequent, showing the few causes behind most problems.
Common practice 5 steps Used by Project Manager, Process Improvement Specialist
What it is A bar chart of problems grouped by cause, sorted from most to least frequent, often with a line showing the cumulative percentage.
When to use it When there are many defects or complaints and you need to decide where to start.
Why it works It shows the few causes behind most problems, so you fix what matters most first.
Do Don't ignore a rare but severe problem just because its bar is short. Don't Grouping by symptom instead of cause. Ignoring a rare but severe problem because it's small on the chart. Step by step Collect problems Over a defined period.
Group by cause Not by symptom.
Count and sort Largest first.
Draw bars and the cumulative line Often 2 or 3 causes cover most problems.
Fix the top causes Then measure again.
PreviewPareto chart Problem-solving There are many problems and you need to know which causes matter most. 5 Procurement · cheat sheet Contract types The main ways to pay a supplier, which decide who carries the cost risk: fixed price, time and materials, or cost plus a fee.
Common practice 5 steps Used by Project Manager
What it is The main ways to pay a supplier, each putting cost risk in a different place: fixed price (supplier carries it), time and materials (buyer carries it), cost-reimbursable plus fee (shared, often with incentives).
When to use it When planning what to buy, before the tender.
Variations Fixed price with economic price adjustment for long contracts where material prices may change.Target cost with shared savings buyer and supplier share any savings or overruns.Why it works Choosing the wrong type causes padded prices, endless claims or runaway costs. The right type fits how well the scope is known.
Do Fixed price on vague scope isn't safe; it's expensive. Don't Fixed price on unclear scope: big buffers and endless claims. Open time and materials with no cap. Step by step Ask how clear the scope is Clear → fixed price; unclear → time and materials or cost-reimbursable.
Ask who can best manage the risk Put the risk where it can be controlled.
Add protections Caps on time and materials, milestones and acceptance on fixed price, incentives where useful.
Define changes How changes are priced and approved.
Write acceptance and payment terms Pay against accepted deliverables.
PreviewContract types Procurement You're about to buy work and must decide who carries the cost risk. 5 Procurement · cheat sheet Make or buy Deciding whether to do work in-house or buy it, by comparing whole-life cost, time, risk, skills and support.
Common practice 6 steps Used by Project Manager
What it is Deciding whether to do work in-house or buy it from outside, by comparing whole-life cost, time, risk, skills and support.
When to use it In planning, for every major piece of work or product.
Why it works The cheapest-looking option often isn't. A structured comparison avoids building what you should buy, or buying what you should keep in-house.
Do Include the cost of your own people's time when you “make”. Don't Comparing only the purchase price. Building because the team wants to, not because it's better. Step by step Describe what's needed The need, not a solution.
List options Make, buy, or a mix (buy and adapt).
Compare whole-life cost Not just the purchase: running, maintenance, support over years.
Compare time, risk and skills Can you do it? How fast? What could go wrong?
Consider strategy Is it core knowledge to keep in-house?
Decide and record why For later audits and lessons.
PreviewMake or buy Procurement You could do work in-house or buy it and must choose. 6 Procurement · cheat sheet Procurement review A short review at the end of a contract of how the buying went: what worked, what didn't, and what to change next time.
Common practice 5 steps Used by Project Manager
What it is A short review, at the end of a contract or project, of how the buying went: what worked, what didn't, and what to change next time.
When to use it When contracts close, before the project closes.
Why it works Buying mistakes repeat if nobody records them. The review also checks that records are complete for audits and warranties.
Do Include the supplier's view; they often know what made things hard. Don't Skipping it because the work is done. Only blaming the supplier. Step by step Gather evidence Contract, change log, supplier reviews, claims.
Review each step Choice of contract type, tender, managing the contract, closing.
Note what to keep and change Specific recommendations.
Check records are complete And archived.
Share the lessons With procurement and future projects.
PreviewProcurement review Procurement A contract ends and the next purchase should be better. 5 Procurement · cheat sheet Supplier scorecard A regular, evidence-based score of a supplier against agreed measures, discussed with the supplier to agree improvements.
Common practice 5 steps Used by Project Manager
What it is A regular, evidence-based score of a supplier on agreed measures, discussed with them to agree improvements.
When to use it Monthly or at milestones for every major supplier.
Why it works It keeps supplier conversations factual, catches problems early, and turns complaints into actions.
Do Recognise good performance too; suppliers respond to it. Don't Scores without evidence. Using the scorecard only to punish. Step by step Agree measures at the start Time, quality, safety, communication, cost.
Score 1 to 5 with evidence Dates, inspection results, incidents.
Share before meeting No surprises.
Discuss strengths and gaps Both.
Agree actions With owners and dates; check next time.
PreviewSupplier scorecard Procurement A supplier's performance needs a regular, fact-based conversation. 5 Procurement · cheat sheet Tender evaluation Choosing a supplier fairly by scoring every bid against published criteria, with conflicts of interest declared.
Common practice 6 steps Used by Project Manager
What it is Choosing a supplier fairly by scoring every bid against criteria and weights published in advance, with conflicts of interest declared.
When to use it After bids arrive, before a contract is signed.
Why it works It leads to the best value, protects against favouritism, and can be defended if a losing bidder complains.
Do Never change the criteria after seeing the bids. Don't Changing criteria after seeing the bids. Undeclared relationships with bidders. Step by step Publish criteria and weights With the request for bids: for example price 40%, experience 20%, method 25%, timeline 15%.
Declare conflicts of interest Anyone with a link to a bidder steps out.
Score independently Each panel member first, then agree together.
Check value, not just price The lowest price may be the highest risk.
Record scores and reasons And the decision.
Debrief unsuccessful bidders Honestly and briefly.
PreviewTender evaluation Procurement Several suppliers bid and the choice must be fair and defensible. 6 Quality · cheat sheet Control chart A chart of a measure over time (for example defects per test cycle), with an average line and limits, showing whether a process is stable or changing.
Common practice 5 steps Used by Project Manager, Process Improvement Specialist
What it is A chart of a measure over time with an average line and upper and lower limits, showing whether a process is stable or changing.
When to use it When you measure something repeatedly and want to know if changes are real or just noise.
Why it works It separates normal variation from real change, so you don't overreact to noise or miss a real drift.
Do Don't change the process after every bad point; look for patterns. Don't Reacting to every small change. Ignoring a steady drift. Step by step Pick a regular measure Defects per cycle, waiting time per day.
Plot points over time In order.
Draw the average And limits (often average ± 3 standard deviations).
Look for signals Points outside limits, seven or more in a row on one side, steady trends.
Investigate signals only Leave normal variation alone.
PreviewControl chart Quality You measure something regularly and want to know if changes are real. 5 Quality · cheat sheet Cost of quality Comparing what you spend on preventing and checking for defects with what failures cost when they're found late or after handover.
Common practice 5 steps Used by Project Manager, Process Improvement Specialist
What it is Comparing the cost of preventing and checking for defects with the cost of failures: rework, delays, complaints, warranty claims.
When to use it When planning quality and when defects keep appearing.
Why it works Failures found late are much more expensive than prevention. Seeing the full cost justifies investing in getting it right first time.
Do Failure costs are often hidden; ask the people who do the rework. Don't Cutting reviews to save time, then paying for rework. Only counting the costs you can see. Step by step List prevention costs Training, clear requirements, design reviews.
List appraisal costs Inspections, testing, audits.
List internal failure costs Rework and delays before handover.
List external failure costs Complaints, fixes after handover, reputation.
Compare and decide Where would more prevention save money overall?
PreviewCost of quality Quality Defects keep costing time and you're weighing prevention against fixing. 5 Quality · cheat sheet Inspection and testing Checking a deliverable against its requirements by looking, measuring or testing, and recording what passes and what must be fixed.
Common practice 6 steps Used by Project Manager
What it is Checking a deliverable against its requirements by looking, measuring or testing, and recording what passes and what must be fixed.
When to use it At planned points throughout the work, before work is covered up or handed over, and before acceptance.
Variations Testing for systems: unit, integration, user acceptance.Audit checks that processes are followed (quality assurance).Why it works Defects found early are cheap to fix. Inspections at the right moments prevent costly rework later.
Do Inspect before work is hidden; after, fixes cost ten times more. Don't Inspecting only at the very end. Checklists that don't link to requirements. Step by step Plan inspection points Especially before work is covered up or handed over.
Use a checklist from the requirements Each check linked to a requirement.
Inspect and record Pass or fail, with evidence.
Log defects With an owner and a fix date.
Re-inspect fixes Before closing.
Look for patterns Repeated defects mean a process problem.
PreviewInspection and testing Quality Work must be checked against requirements before it's covered up or accepted. 6 Quality · cheat sheet Version control Keeping one register of the current versions of key documents, drawings and settings, withdrawing old versions and making sure everyone uses the latest.
Common practice 6 steps Used by Project Manager
What it is Keeping one register of the current versions of key documents, drawings and settings, approving changes before new versions are issued, and withdrawing old versions.
When to use it Whenever several people or suppliers work from the same documents.
Why it works When several people or suppliers work from copies, someone will use an old one. Version control prevents costly mistakes and rework.
Do Mark old printed copies “superseded” or remove them from site. Don't Versions emailed around with no register. Old copies left on site. Step by step List what's controlled Drawings, specifications, plans, system settings.
Number versions and set statuses Draft, approved, withdrawn.
Keep one register The single source everyone checks.
Approve changes first Linked to change control.
Withdraw old versions And confirm everyone has the latest.
Audit occasionally Spot-check what's actually in use.
PreviewVersion control Quality Several people work from documents or drawings that keep changing. 6 Retrospectives · cheat sheet Start, Stop, Continue Three columns: what we should start doing, stop doing and keep doing.
Common practice 6 steps Used by Scrum Master, Project Manager
What it is A simple review format with three questions: what should we start doing, stop doing, and continue doing?
When to use it A good first format for a new team: simple, quick and easy to explain.
Why it works It's quick, easy for new groups, and leads straight to actions rather than general complaints.
Do Limit actions to one or two; long action lists rarely get done. Don't Ending with a long list and no action. Using the same format for months until it goes stale. Step by step Set the scene Remind people of the period and the goal; agree it's about the process, not blame.
Collect ideas silently Everyone writes notes under start, stop and continue.
Share and group Read notes aloud and cluster similar ones.
Vote on what matters most For example with dots.
Agree one or two actions With an owner and a date.
Check the actions next time Did they help?
PreviewStart, Stop, Continue Retrospectives A group needs a quick, action-focused look back. 6 Retrospectives · cheat sheet Timeline Retrospective Lay out what happened over a longer period on a timeline, then look for patterns.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is A review where the group draws a timeline of the whole period and marks key events, highs and lows, then looks for patterns.
When to use it After several Sprints or a release, when you want the bigger picture.
Why it works It's ideal for long periods or whole projects: it rebuilds a shared memory and shows patterns that single events hide.
Do Invite suppliers and users if they were part of the story. Don't Only looking back, without deciding anything. Step by step Draw a long line From start to end of the period.
Add events Everyone adds what happened, with dates.
Mark highs and lows A mood line above and below.
Look for patterns What came before each low? What caused the highs?
Turn patterns into lessons Recommendations for next time.
PreviewTimeline Retrospective Retrospectives You're reviewing a long period or a whole project. 5 Risk · cheat sheet Expected value and decision trees Multiplying each possible outcome's probability by its impact and adding them up, to compare choices under uncertainty. A decision tree draws the choices, chances and outcomes.
Common practice 5 steps Used by Project Manager
What it is Expected value is probability × impact, added up across the possible outcomes of a choice. A decision tree draws the choices (squares), the chances (circles) and the outcomes, so options can be compared.
When to use it For decisions with uncertain outcomes and significant money at stake.
Why it works It makes decisions under uncertainty clearer and easier to defend, especially when choosing whether to pay now to avoid a possible cost later.
Do Probabilities are estimates; show what happens if they're wrong. Don't Treating guessed probabilities as precise. Ignoring a catastrophic worst case because its expected value is small. Step by step Draw the decision A square with a branch for each option.
Add chance branches Possible outcomes for each option, with probabilities that add up to 100%.
Put a cost or value on each outcome Including the option's own cost.
Calculate Multiply probability × value and add per option.
Compare and sense-check Lowest expected cost, but can we survive the worst case?
PreviewExpected value and decision trees Risk You must choose between options with uncertain costs. 5 Risk · cheat sheet Probability-impact matrix A grid that ranks risks by how likely they are and how much they'd hurt (or help), using agreed scales.
Common practice 6 steps Used by Project Manager
What it is A grid that ranks risks by how likely they are and how much they'd affect the objectives, using scales everyone has agreed. Each risk lands in a cell; the colour of the cell suggests how urgently to act.
When to use it After identifying risks, to decide which deserve detailed responses. Repeat at each review.
Why it works Without shared scales, every risk is “high”. Agreed definitions turn opinions into a ranking, so attention goes to the few risks that matter most.
Do Scores are a ranking aid, not precise numbers. Don't let a low score hide a catastrophic but unlikely risk; some deserve a plan anyway. Don't Scales without definitions, so “high” means different things to different people. Treating the score as precise; it's a ranking aid. Step by step Agree the scales For likelihood and impact, define 1 to 5 with concrete examples: “impact 5 = more than a month late or over €100k”.
Score each risk With the people who know the area. Score the risk as it is now, before new responses.
Place them on the grid Likelihood on one axis, impact on the other. Write the risk ID in the cell.
Agree the zones For example: score 15 or more needs a response now, 8 to 14 needs an owner and watching, below 8 can be accepted.
Plan responses for the top ones Then re-score after responses to see the expected effect.
Re-score regularly At each risk review, move risks as things change.
PreviewProbability-impact matrix Risk Every risk is called “high” and you need a fair ranking. 6 Risk · cheat sheet Reserve analysis Checking how much contingency and management reserve has been used, how much is left, and whether it still covers the risks that remain.
Common practice 5 steps Used by Project Manager
What it is Checking how much contingency and management reserve has been used, how much is left, and whether it covers the risks still open.
When to use it At every risk review and stage end, and whenever contingency is used.
Why it works Reserves run out quietly. Regular checks show early whether you'll need more, or can release some.
Do Contingency is for risks, not for new scope. Don't Spending contingency on new scope. Not noticing contingency running out until it's gone. Step by step Start from the reserves Contingency (known risks) and management reserve (unknown).
Record each use Which risk or change it paid for.
Compare what's left with open risks Their likely cost.
Release what's no longer needed When risks pass.
Escalate early If it looks too small.
PreviewReserve analysis Risk You need to know if the money set aside for risks is still enough. 5 Risk · cheat sheet Risk identification Ways to find what could go wrong (or better than expected) before it happens: brainstorming, checklists, past projects and checking assumptions.
Common practice 6 steps Used by Project Manager
What it is Finding the uncertain events that could affect your objectives, positively or negatively, before they happen.
When to use it From the very start, at every stage and whenever something changes. Not a one-off workshop.
Why it works You can only manage risks you know about. Early identification gives you time and cheap options.
Do “Budget risk” isn't a risk; name the cause and the effect. Don't Writing vague worries (“budget risk”) instead of specific causes and effects. Only looking for threats and missing opportunities. Identifying risks once and never again. Step by step Gather different perspectives Team, users, suppliers, experts.
Use prompts Checklists of common risk areas, past lessons, the assumptions list, the WBS.
Write each risk properly Because of [cause], [event] may happen, which would [effect].
Look for opportunities too Things that could go better than planned.
Give each risk an owner And a first estimate.
Repeat At every stage and when things change.
PreviewRisk identification Risk You're starting, planning or changing course and need to know what could go wrong. 6 Risk · cheat sheet Risk responses The ways to deal with a risk before it happens: for threats avoid, transfer, reduce or accept; for opportunities exploit, enhance, share or accept.
Common practice 6 steps Used by Project Manager
What it is The ways to deal with a risk before it happens. For threats: avoid, transfer, reduce or accept. For opportunities: exploit, enhance, share or accept.
When to use it For every significant risk, as soon as it's analysed.
Why it works Different risks need different responses. Choosing deliberately is cheaper than reacting when the risk happens.
Do Adding contingency money is acceptance, not reduction; prefer responses that change the risk. Don't Always choosing “add contingency”. Responses that are never put into the plan. Step by step Start with the highest risks From your ranking.
Consider each strategy Avoid (change the plan), transfer (contract, insurance), reduce (lower likelihood or impact), accept (maybe with money aside).
For opportunities Exploit (make sure), enhance (make likelier), share (with a partner), accept.
Choose and cost the response Is it worth it?
Give it an owner and a date And add it to the plan.
Check if it worked Re-score the risk.
PreviewRisk responses Risk An important risk needs a deliberate plan before it happens. 6 Risk · cheat sheet Schedule simulation Running the schedule hundreds of times with each activity's duration picked from its range, to see how likely each finish date is.
Common practice 6 steps Used by Project Manager
What it is Running a schedule or budget model hundreds or thousands of times, each time picking every uncertain value from its range, to see how likely each result is.
When to use it When the board needs a confidence level for a date or budget, on projects with uncertain activities.
Why it works A single date or cost hides uncertainty. Simulation gives honest confidence levels and shows which activities drive the risk.
Do The answer is only as good as the ranges; ask the people who do the work. Don't Presenting the result as more precise than the inputs. Ignoring dependencies between risks. Step by step Give uncertain items ranges Best, likely, worst.
Build the model The schedule logic or cost lines.
Run it many times With a tool or a spreadsheet.
Read confidence levels For example: 50% by date X, 80% by date Y.
Find the drivers Which items affect the result most?
Act and re-run Reduce the biggest uncertainties.
PreviewSchedule simulation Risk The board asks how confident you are about a date or budget. 6 Scope and scheduling · cheat sheet Critical path The longest chain of dependent activities through the plan. It sets the end date; activities off it have slack.
Common practice 7 steps Used by Project Manager
What it is The critical path is the longest chain of dependent activities from start to finish. It sets the shortest possible duration of the project.
Activities on it have no slack: if one slips, the end date slips. Activities off it have float, so they can move a little without affecting the end.
When to use it When building or changing a schedule, and whenever someone asks “can we finish earlier?”.
Variations Critical chain adds shared buffers at the end of chains instead of padding each task.Near-critical paths chains with very little float that deserve attention too.Why it works It tells you where to focus. Speeding up a non-critical task doesn't help the end date; protecting critical tasks does.
It also tells you what to say when someone asks “can we finish earlier?”: only by shortening the critical path.
Do Outside dependencies (permits, deliveries, approvals) are often on the critical path and outside your control: book them early. Show the critical path in a different colour on every Gantt chart you share. Don't Missing dependencies, so the path looks shorter than it is. Ignoring near-critical paths with very little slack. Step by step List the activities Use the work breakdown to list activities with a duration estimate each.
Find the dependencies For each activity, ask: what must finish before this can start? Note outside dependencies too, like approvals or deliveries.
Draw the network Boxes for activities, arrows for dependencies. Sticky notes on a wall work well.
Walk forwards From the start, work out the earliest start and finish of each activity. The latest earliest-finish is the project end.
Walk backwards From the end, work out the latest each activity can finish without delaying the end. The difference between latest and earliest is the float.
Mark the zero-float chain Activities with zero float form the critical path. Highlight them in the schedule and watch them most closely.
Recheck when things change A delay on a non-critical task can use up its float and make a new critical path.
PreviewCritical path Scope and scheduling You need to know which activities decide the end date. 7 Scope and scheduling · cheat sheet Gantt chart A chart with activities down the side and time across, each activity shown as a bar, often with links and milestones.
Common practice 6 steps Used by Project Manager, Process Improvement Specialist
What it is A bar chart of a schedule: activities down the side, time across the top, each activity a bar from start to finish, often with dependencies and milestones.
When to use it To show and discuss the schedule with the team, the sponsor and suppliers.
Why it works It's the easiest way to show a plan to people: what happens when, what overlaps, and what's critical.
Do Show only as much detail as the audience needs. Don't Drawing bars without dependencies: it looks like a plan but can't be recalculated. Too much detail for the audience. Step by step List activities Grouped by deliverable.
Set durations and dependencies From estimates and logic.
Draw the bars Against a time scale.
Add milestones As diamonds.
Highlight the critical path In a different colour.
Update with progress And show the baseline for comparison.
PreviewGantt chart Scope and scheduling People need to see the schedule at a glance. 6 Scope and scheduling · cheat sheet Requirements traceability Linking each requirement to where it comes from, the deliverable that meets it and the test that checks it.
Common practice 6 steps Used by Project Manager
What it is Linking each requirement to its source, to the deliverable that meets it, and to the test that checks it, usually in a traceability matrix.
When to use it Once requirements are agreed, and kept up to date through design, build, test and changes.
Why it works It shows at any moment whether every need is covered, built and tested, and what a change will affect.
Do Keep it as simple as the project allows; a spreadsheet is often enough. Don't A matrix nobody updates after design. Requirements without tests. Step by step Number every requirement Unique IDs.
Record the source Who asked and why.
Link to deliverables Which part of the design or product meets it?
Link to tests Which test proves it?
Track status Designed, built, tested, accepted.
Use it for changes Find every requirement a change touches.
PreviewRequirements traceability Scope and scheduling Many requirements, suppliers and tests risk something being forgotten. 6 Scope and scheduling · cheat sheet Resource levelling Adjusting the schedule so nobody is booked for more than they can do, by moving work that has float, sharing it, or adding help.
Common practice 6 steps Used by Project Manager
What it is Adjusting a schedule so nobody is booked for more than they can do, by moving work that has float, sharing it, or adding help.
When to use it After the first schedule exists and whenever people's availability changes.
Why it works Plans that overload people fail quietly: work slips, quality drops, people burn out. Levelling makes the plan doable.
Do Nobody can work at 100% on project tasks for long; leave room for the unexpected. Don't Looking only at totals per person. Forgetting people's other jobs. Step by step Load tasks per person over time Include holidays and other duties.
Chart it A bar per week or month; mark 100%.
Find the peaks Who is over 100%, and when?
Move tasks with float Into quieter periods.
Share or add help Where moving isn't enough.
Touch the critical path last Only then does the end date move.
PreviewResource levelling Scope and scheduling Someone is booked for more than they can do. 6 Scope and scheduling · cheat sheet Rolling-wave planning Planning the near term in detail and later work in outline, adding detail as information arrives.
Common practice 5 steps Used by Project Manager
What it is Planning the near term in detail and later work in outline, adding detail as you learn more.
When to use it On any project where later work depends on what you learn earlier.
Why it works Detailed plans for work far ahead are usually wrong. Rolling-wave planning puts effort where it's useful and keeps plans realistic.
Do Rolling-wave isn't an excuse to skip planning ahead; the outline must still be there. Don't Using it as an excuse to never plan ahead. Detailed plans for work nobody can yet describe. Step by step Plan the next stage in detail Activities, owners, dates.
Plan later stages in outline Deliverables, milestones, rough estimates.
Set a point to plan the next wave Usually near the end of each stage.
Use what you learned To plan the next wave.
Keep the baselines Unless a change is approved.
PreviewRolling-wave planning Scope and scheduling Later work can't be planned in detail yet. 5 Scope and scheduling · cheat sheet Schedule compression Ways to shorten a schedule without cutting scope: add resources to critical work (crashing) or overlap activities (fast-tracking).
Common practice 6 steps Used by Project Manager
What it is Ways to shorten a schedule without cutting scope: crashing (adding resources to critical work) and fast-tracking (overlapping activities).
When to use it When the end date must move earlier, or to recover a delay.
Why it works When a date must move earlier or a delay must be recovered, these are the main options, each with a cost or a risk.
Do Shortening non-critical activities doesn't help the end date. Don't Compressing activities that aren't critical. Fast-tracking so much that rework wipes out the gain. Step by step Find the critical path Only critical activities affect the end date.
Crashing Which critical activities can go faster with more people or equipment, and at what cost?
Fast-tracking Which can overlap, and what rework risk does that add?
Compare options Time saved, cost, risk.
Let the sponsor decide With the trade-offs clear.
Re-check the critical path A new one may appear.
PreviewSchedule compression Scope and scheduling The end date must move earlier or a delay must be recovered. 6 Scope and scheduling · cheat sheet Work breakdown (decomposition) Splitting the whole scope into deliverables, then into smaller pieces, until each piece can be estimated, scheduled and owned.
Common practice 6 steps Used by Project Manager
What it is Breaking the whole scope of a project into deliverables, then into smaller pieces, until each piece can be estimated, scheduled and owned. The result is a tree called a work breakdown structure (WBS).
When to use it In planning, after the scope is agreed. Also useful any time a piece of work feels too big to estimate.
Why it works It makes sure all the work is included exactly once. Schedules, budgets, responsibilities and risks are all built on it, so gaps in the WBS become gaps everywhere.
Do Nouns, not verbs: “Training materials”, not “write training materials”. Stop splitting when more detail wouldn't change how you manage it. Don't Mixing activities and deliverables. Forgetting project management work itself. Going so deep that tracking costs more than doing. Step by step Start with the whole Put the project or main deliverable at the top.
Split into major deliverables Usually 4 to 8 nouns (things, not activities). Include project management as its own branch.
Keep splitting Break each deliverable into smaller pieces until each can be estimated, given to one owner and done in a reasonable time.
Apply the 100% rule The children of each box add up to exactly the parent: nothing missing, nothing extra.
Number every box 1, 1.1, 1.1.1 so everyone refers to the same thing.
Write a short dictionary For important pieces: what's included, acceptance criteria, owner, estimate.
PreviewWork breakdown (decomposition) Scope and scheduling A project feels too big to plan and nothing must be forgotten. 6 Stakeholders · cheat sheet Negotiation Reaching an agreement where both sides' real interests are met, rather than haggling over fixed positions.
Common practice 6 steps Used by Project Manager
What it is Reaching an agreement where both sides' real interests are met, by focusing on why people want something rather than on fixed positions.
When to use it Claims and disputes with suppliers, competing needs between stakeholders, agreeing people's time.
Why it works Positional haggling damages relationships and often leaves value on the table. Interest-based negotiation finds better deals and keeps people working together.
Do Never start with your final offer. Silence is a tool; don't rush to fill it. Don't Starting with your final offer. Winning the deal and losing the relationship. Step by step Prepare Know the facts, your interests, theirs, and your walk-away point (best alternative).
Separate the people from the problem Stay respectful, even when firm.
Ask about interests “Why is that important to you?”
Create options Several ways to meet both sides' interests.
Use fair criteria The contract, market rates, evidence.
Write down what was agreed And confirm it.
PreviewNegotiation Stakeholders Two sides want different things and you need a deal both accept. 6 Stakeholders · cheat sheet Saying no with reasons Turn a no into a clear, respectful “not now” or “not for this product”, backed by value and the goal.
Common practice 6 steps Used by Product Owner, Project Manager
What it is Turning down or deferring a request in a way that keeps the relationship: explaining the reason, the trade-off, and offering an alternative.
When to use it Every time a request doesn't fit the current goal or the vision.
Why it works Saying yes to everything breaks promises and priorities. A respectful no, with reasons and options, protects the work and keeps trust.
Do “No, and here's what I can do” works better than “no”. Don't A no without a reason. A yes to keep the peace that breaks the Sprint Goal. Step by step Listen and understand the need Ask why it matters to them.
Check it against goals and priorities Does it fit? What would it replace?
Explain the trade-off “If we do this, X moves later.”
Offer an alternative Later, smaller, different, or someone else.
Record it So it isn't lost and can come back.
Escalate if needed When it's not your decision.
PreviewSaying no with reasons Stakeholders A request would break priorities but the relationship matters. 6 Stakeholders · cheat sheet Stakeholder communication plan Decide who gets told what, how and how often, so nobody is surprised.
Common practice 6 steps Used by Product Owner, Project Manager
What it is A planned way of keeping each stakeholder group informed: what they need to know, in what format, how often and from whom. Often written as a communication plan.
When to use it Once you know your stakeholders, and whenever someone says they were surprised.
Why it works People who feel uninformed fill the gap with rumours or resistance. Regular, fitting updates build trust and reduce interruptions.
Do One clear message, repeated in several channels, beats many different messages. With n people there are n × (n − 1) ÷ 2 possible channels; plan which ones matter. Don't Status reports that replace looking at the real product. Step by step List the audiences From your stakeholder map.
Ask what each needs Decisions, progress, dates, impact on them.
Choose format and frequency A one-page email, a meeting, a newsletter, a dashboard.
Name a sender for each So it actually happens.
Include bad news early With what you're doing about it.
Check it's working Ask people if the updates help, and adjust.
PreviewStakeholder communication plan Stakeholders Different people need different information at different times. 6 Stakeholders · cheat sheet Stakeholder engagement assessment A table comparing how engaged each key stakeholder is today with how engaged you need them to be, so you know where to spend your time.
Common practice 5 steps Used by Project Manager, Process Improvement Specialist
What it is A table comparing how engaged each key stakeholder is today with how engaged you need them to be, using levels like unaware, resistant, neutral, supportive and leading.
When to use it After the stakeholders are identified, and again at each stage or when someone's attitude changes.
Why it works It shows where the gaps are, so you spend time on the people whose engagement must change, not on those already on board.
Do Moving someone from resistant to neutral is often enough. Don't Wanting everyone to be “leading”: most only need to be supportive or neutral. Guessing positions without talking to the people. Step by step List key stakeholders From the stakeholder map.
Mark current engagement Based on what they say and do, not assumptions.
Mark the needed level Most people only need to be supportive or neutral.
Plan actions for the gaps Specific next steps with an owner.
Review regularly People move both ways.
PreviewStakeholder engagement assessment Stakeholders You need to know whose support must change, and how. 5 Stakeholders · cheat sheet Stakeholder map (power and interest) Place each stakeholder by how much influence they have and how much they care, then engage each group differently.
Common practice 6 steps Used by Project Manager, Product Owner, Scrum Master, Process Improvement Specialist
What it is A stakeholder map places everyone affected by, or able to affect, your work on a simple grid: how much influence they have, and how interested they are.
The four boxes suggest how to involve each group: manage closely (high, high), keep satisfied (high influence, low interest), keep informed (low influence, high interest) and monitor (low, low).
When to use it At the start, and whenever new people appear or someone's interest changes.
Variations Engagement assessment compares how engaged each person is now with how engaged you need them to be.Salience model adds urgency and legitimacy to power.Why it works You can't give everyone the same attention. The map helps you spend your time where it matters, and makes sure nobody important is forgotten.
It also shows risks: a powerful person who isn't interested yet can suddenly block you.
Do Don't ignore end users just because they look low-influence; their reaction decides whether the result is used. Keep the map private if it contains frank views. Don't Making the map once and forgetting it. Ignoring end users because they look low-influence. Step by step Brainstorm everyone With the team, list people and groups who are affected or can affect the work: users, managers, finance, legal, suppliers, regulators, neighbours. Use checklists and past projects.
Rate influence and interest For each, ask: can they change or stop the work? How much do they care about it? Use high, medium, low.
Place them on the grid Draw the four boxes and write names in them. Discuss disagreements; they often reveal something important.
Decide how to engage each box Manage closely: regular personal contact. Keep satisfied: short updates on what matters to them. Keep informed: regular news. Monitor: light touch.
Turn it into actions Add owners and channels, often in a stakeholder register or communication plan.
Revisit it People move boxes. Update the map at each stage or when something changes.
PreviewStakeholder map (power and interest) Stakeholders You need to see who matters most and how to involve each. 6 Strategy and planning · cheat sheet Benefits tracking Measuring each expected benefit against its baseline and target after the project, with an owner who acts when it lags.
Common practice 6 steps Used by Project Manager
What it is Measuring each expected benefit after a project against its baseline and target, at agreed points, with an owner in the organisation who acts if it lags.
When to use it Planned in the business case, handed over at closure, reviewed at set points after go-live.
Why it works Projects are funded for their benefits, which usually arrive after the project ends. Without tracking, nobody knows if the money achieved anything.
Do Don't change targets to match results; explain the gap instead. Don't Owners who leave with the project. Only one measurement, too early to show anything. Step by step Define each benefit What improves, the measure, the baseline today, the target and the date.
Name an owner who stays Someone in the organisation, not in the project team.
Agree review points For example 6 and 12 months after go-live.
Measure and compare Actual vs baseline and target; look at the trend.
Find causes and act For benefits that lag, agree actions.
Report honestly Separate project success from benefit success.
PreviewBenefits tracking Strategy and planning The project is ending and its benefits will arrive later. 6 Strategy and planning · cheat sheet PESTLE analysis A checklist for scanning the outside world for factors that affect a project or decision: Political, Economic, Social, Technological, Legal and Environmental.
Common practice 5 steps Used by Project Manager
What it is A checklist for scanning the world outside a project for things that could affect it: Political, Economic, Social, Technological, Legal and Environmental factors.
When to use it At the start, in feasibility studies and business cases, and when the environment changes.
Why it works Projects fail from outside causes as often as inside ones. Going letter by letter stops you forgetting whole areas.
Do Stay specific to this project; generic lists don't help. Don't Listing everything without judging what matters. Doing it once and never again. Step by step Gather a mix of people Different views find different factors.
Go letter by letter List factors under each heading.
Judge importance High, medium or low for this project.
Turn the important ones into action Risks, constraints, requirements or questions for the feasibility study.
Revisit when things change Elections, new laws, price shocks.
PreviewPESTLE analysis Strategy and planning You need to scan the outside world for factors that could affect a project. 5 Strategy and planning · cheat sheet Product roadmap (now, next, later) A visual forecast of where the product is heading, shown as goals and outcomes over time, not a list of dates.
Common practice 5 steps Used by Product Owner, Project Manager
What it is A roadmap shows, at a high level, the direction and the main steps over time: what's planned now, next and later, and why. It's a communication tool, not a detailed plan.
When to use it To align stakeholders on direction and sequence. Not in the Scrum Guide; it sits between the vision and the Product Backlog.
Variations Timeline roadmap uses dates or quarters, common for projects with fixed milestones.Outcome roadmap lists outcomes instead of features.Why it works It aligns people on direction and order without promising exact dates far ahead, which are rarely accurate.
Do Avoid exact dates for the “later” column. Don't Feature-and-date roadmaps that become promises. Roadmaps nobody updates. Confusing the roadmap with the Product Backlog. Step by step Start from goals or outcomes What do we want to achieve?
Group work into themes Not individual tasks.
Arrange in time horizons Now (committed), next (likely), later (ideas).
Show confidence honestly Near items are firm; far items are directional.
Share and review Update it regularly as you learn.
PreviewProduct roadmap (now, next, later) Strategy and planning Leaders need the direction and order on one page, without exact dates. 5 Strategy and planning · cheat sheet SWOT analysis A simple grid of internal Strengths and Weaknesses and external Opportunities and Threats, used to judge an idea or situation.
Common practice 6 steps Used by Project Manager
What it is A grid of four boxes: internal Strengths and Weaknesses, external Opportunities and Threats.
When to use it In feasibility studies, strategy discussions and when comparing options.
Why it works It gives a quick, balanced picture of an idea or situation and points to strategies: use strengths, fix weaknesses, seize opportunities, guard against threats.
Do End with decisions; a SWOT without actions is decoration. Don't Long lists with no conclusions. Confusing internal and external factors. Step by step List strengths What do we do well or have?
List weaknesses What do we lack?
List opportunities Outside things that could help.
List threats Outside things that could harm.
Combine Strengths × opportunities = what to pursue; weaknesses × threats = what to protect against.
Decide Turn it into actions or risks.
PreviewSWOT analysis Strategy and planning You need a quick, balanced view of an idea's strengths, weaknesses and context. 6 Team development · cheat sheet Conflict styles People handle conflict in different ways; knowing them helps you guide a disagreement towards working it out together.
Common practice 5 steps Used by Scrum Master, Project Manager
What it is Five common ways people handle conflict: competing (win), accommodating (give in), avoiding, compromising (split the difference) and collaborating (solve it together).
When to use it When a disagreement repeats or gets personal.
Why it works Each style fits some situations. Knowing them helps you choose deliberately instead of reacting.
Do Avoiding is fine for trivial issues, harmful for important ones. Don't Deciding who is right. Pushing for a quick compromise that solves nothing. Step by step Notice the conflict early Before it becomes personal.
Separate the issue from the people Talk about the problem.
Choose a style for the situation Collaborate when both sides' needs matter and there's time; compete when safety is at stake; compromise when time is short.
Start from the shared goal And the facts.
Agree and record the outcome So it doesn't return.
PreviewConflict styles Team development A disagreement is growing and you need to choose how to handle it. 5 Team development · cheat sheet Delegation levels Make clear, decision by decision, how much the team decides itself and how much a leader decides.
Common practice 5 steps Used by Scrum Master, Project Manager, Product Owner
What it is A scale for how much a team or person decides on their own, from “I decide” to “you decide”, agreed per type of decision.
When to use it When managers and teams keep stepping on each other's decisions, or as a team grows more self-managing.
Why it works Unclear delegation causes either micro-management or surprises. Agreeing levels per decision builds trust and speed.
Do Delegation without the information to decide well isn't delegation. Don't Delegating a decision, then taking it back. Step by step List recurring decisions Tools, budget, hiring, priorities, working hours.
Use a scale For example: tell, sell, consult, agree, advise, inquire, delegate.
Agree a level per decision Together.
Make it visible A simple table.
Move levels as trust grows Review every few months.
PreviewDelegation levels Team development It's unclear how much a team or person may decide alone. 5 Team development · cheat sheet Knowledge transfer Making sure what a person knows is passed on before they leave or change role: by working together, writing things down and naming a successor.
Common practice 6 steps Used by Project Manager, Scrum Master
What it is Passing what a person knows to others before they leave or move: by working together, writing down what matters, and naming a successor.
When to use it When someone resigns, moves role or goes on long leave, and routinely for critical knowledge.
Why it works Much project knowledge isn't written anywhere. Losing it causes delays, errors and repeated mistakes.
Do Start on the day you hear someone is leaving. Don't Starting the handover in the last week. A long document nobody reads instead of working together. Step by step Find what only this person knows Systems, contacts, decisions and why, open issues.
Name a successor And agree overlap time.
Work alongside On real work, not just meetings.
Write short notes Setups, contacts, decisions. Keep passwords in the proper secure place.
Update roles and contacts RACI, contact lists.
Check it worked Can the successor handle a real case alone?
PreviewKnowledge transfer Team development Someone who knows things nobody else does is leaving or moving on. 6 Team development · cheat sheet Recognition Noticing and thanking people for specific contributions, publicly or privately, so good work and effort are seen.
Common practice 5 steps Used by Project Manager
What it is Noticing and thanking people for specific contributions, publicly or privately.
When to use it Continuously, and especially during long or stressful phases.
Why it works People who feel their work is seen stay motivated and engaged, especially in long or stressful work.
Do Generic thanks fade; specific thanks stick. Don't Generic thanks (“great job, everyone”) that nobody remembers. Always recognising the same few people. Step by step Notice specific actions Not just results.
Say it soon Close to when it happened.
Be specific What they did and why it mattered.
Match the person Public or private.
Be fair Spread recognition across the team.
PreviewRecognition Team development People work hard and you want them to know it's seen. 5 Team development · cheat sheet Situational leadership Adapting how you lead to each person and task: more directing for someone new to a task, coaching while they learn, supporting and then delegating as they gain confidence.
Common practice 6 steps Used by Project Manager
What it is Adapting your leadership to each person and task: directing when someone is new to a task, coaching while they learn, supporting as they gain skill, and delegating when they're capable and confident.
When to use it Every day, especially with mixed teams of new and experienced people.
Why it works People need different things at different times. Leading everyone the same way frustrates experienced people and leaves new ones lost.
Do The same person may need directing on one task and delegating on another. Don't One style for everyone. Delegating to someone who isn't ready. Step by step Look at the person and the task How skilled and confident are they at this task?
New and unsure Clear instructions, close follow-up.
Learning Explain why, coach, encourage.
Skilled but hesitant Support, involve, build confidence.
Skilled and confident Delegate, step back.
Re-check often People grow; adjust your style.
PreviewSituational leadership Team development People with different experience need different kinds of leadership. 6 Team development · cheat sheet Team stages (forming to performing) New teams often move through forming, storming, norming and performing, and the Scrum Master's help changes with each stage.
Common practice 6 steps Used by Scrum Master, Project Manager
What it is A model of how groups develop: forming (polite, unsure), storming (friction), norming (agreeing how to work) and performing (working well together). Some add adjourning, when the group ends.
When to use it To understand what a team needs now, and not panic when it storms.
Why it works Knowing that friction is a normal stage helps leaders respond calmly and help the team move on.
Do Don't skip storming by imposing rules; it returns later. Don't Treating the stages as a fixed timetable. Avoiding storming instead of helping through it. Step by step Recognise the stage From behaviour: politeness, conflict, agreement, flow.
Forming: give clarity Purpose, roles, first goals.
Storming: help resolve Make conflict open and fair; agree rules together.
Norming: step back Let the team own its ways of working.
Performing: protect and challenge Remove obstacles, set bigger goals.
Expect to go back New members or big changes can restart the cycle.
PreviewTeam stages (forming to performing) Team development A new team is clashing and you wonder if something is wrong. 6 Team development · cheat sheet The change curve A way to understand how people react to change over time, often from shock and resistance through exploration to acceptance and commitment, so you can support each stage.
Common practice 6 steps Used by Project Manager, Process Improvement Specialist
What it is A way to understand how people react to change over time, often from shock and resistance, through exploring the new, to acceptance and commitment.
When to use it When a project changes how people work.
Why it works Projects that change how people work only deliver benefits if people adopt the change. Knowing the stages helps you give the right support at the right time.
Do Resistance is a stage, not a character flaw. Don't Expecting everyone to accept change at once. Treating resistance as bad behaviour instead of a stage. Step by step Expect different reactions People move at different speeds.
Early on: explain why Clearly and repeatedly, with the reasons.
During resistance: listen Acknowledge what people lose; answer concerns honestly.
During exploration: involve and train Let people shape the new ways.
Towards commitment: recognise Celebrate progress; use champions.
Check readiness By what people can do, not what they say.
PreviewThe change curve Team development A project changes how people work and some resist. 6