Day 11 of 46Stage 2 · PlanningTuesdayRequirements traceability and prototypes

From needs to tests

Forty requirements, six deliverables and a dozen suppliers. Make sure every need ends up built, tested and accepted, and that the design really works for the people using it.

Stage goal: A realistic plan for scope, time, cost, risk, quality and buying.
Team
Aya (Project Coordinator) Aine (IT Lead)
Stakeholders
Amani (Clinical Lead)
How the day goes
  1. 09:00Requirements review with Aya
  2. 11:00Room mock-up with the clinical team
  3. 15:00Test plan with Aine and Antonia

Situation 1 of 3

09:00 · Requirements review with Aya
Aya (Project Coordinator)
How do we know that every requirement Amani's team gave us actually ends up in the building or the system?

What do you set up?

Trace every requirement to a deliverable and a test, so nothing is forgotten and every change can be checked.

Situation 2 of 3

11:00 · Room mock-up with the clinical team
Amani (Clinical Lead)senior user
The drawings look fine, but I can't tell if a treatment room actually works until I'm standing in one.

What do you do?

Test designs with users early, with prototypes or mock-ups. Problems found on paper are cheap to fix.

Situation 3 of 3

15:00 · Test plan with Aine and Antonia
Aine (IT Lead)
When do we test the booking system, and who decides it's good enough?

What goes in the test plan?

Plan testing early: what's tested, by whom, when, and against which acceptance criteria.

Key concepts

The ideas behind today. Concept how the work is done, in our own words · Common practice widely used ways of working.

Common practice

Requirements traceability

  • Link each requirement to the deliverable that meets it and the test that checks it.
  • Gaps and orphan requirements become visible, and every change can be traced.

Where you will meet this: Requirements traceability matrix

Common practice

Prototypes and mock-ups

  • Let users try a design before it's built: paper screens, cardboard rooms, clickable models.
  • Problems found on a prototype cost a fraction of problems found in the finished product.
Concept

Planning tests early

  • Decide what will be tested, by whom, when and against which criteria, long before testing starts.
  • Users test that it works for them; suppliers test that it works.

Where you will meet this: Test strategy · user acceptance testing

Explained in our own words. This helps you understand the concepts behind the certifications; it does not reproduce or replace any official guide. Sources

Day 11 complete

3 situations today.

Your responsibility todayMaking sure every need is met
Technique you usedRequirements traceability, prototypes, test plan
Key points to remember
  • Trace every requirement to a deliverable and a test, so nothing is forgotten and every change can be checked.
  • Test designs with users early, with prototypes or mock-ups. Problems found on paper are cheap to fix.
  • Plan testing early: what's tested, by whom, when, and against which acceptance criteria.