Planning · document brief

Requirements traceability matrix

Links every requirement to its source, the deliverable that meets it and the test that checks it, with its status.

1 sections
Used by Project Manager
Pre-projectInitiatingPlanningExecutingMonitoringClosing

Use it when

every requirement must be built, tested and accepted, with nothing lost.

Why it matters

It makes sure nothing asked for is forgotten, built wrongly or left untested, and shows what a change affects.

Written by

The project manager or analyst

Approved by

Reviewed with the senior user

When it appears

From planning to acceptance; updated with every change.

What goes inside

  1. Requirements ID, requirement, source, met by, tested by, status.

Watch out for

  • Not updated after design.
  • Requirements without tests.

How this document fits

NeedsScope statementRequirements from users
This documentRequirements traceability matrixMade with
FeedsTest planAcceptance certificatechange-request (impact)
Where you will meet this: RTM · traceability matrixPrint the example ↗Print the blank ↗

The document

Day in the RoleRequirements traceability matrixEvery need, built and tested
Version1.0
Date15 March
IDRequirementSourceMet byTested byDesignedBuiltTestedAccepted
R04Wheelchair access to every treatment roomClinical teamDesign rev CWalk-through✓✓✓✓
R12Hand-wash basin in every roomInfection controlDrawing M-03Inspection IT-07✓✓✓
R19Hearing loop at receptionAccessibility rulesElectrical packageTest IT-15✓
R22Baby-changing roomCommunity councilLayout rev DInspection✓✓
R31Online and phone bookingResidentsBooking systemUser acceptance tests✓✓✓

Every requirement needs a deliverable and a test. Empty “Met by” or “Tested by” cells are gaps to fix now.

Day in the Role · Requirements traceability matrixIllustrative example · not a real project or organisation · dayintherole.com
Day in the RoleRequirements traceability matrixEvery need, built and tested
Version
Date
IDRequirementSourceMet byTested byDesignedBuiltTestedAccepted

Every requirement needs a deliverable and a test. Empty “Met by” or “Tested by” cells are gaps to fix now.

Day in the Role · Requirements traceability matrixTemplate · free to use and adapt · dayintherole.com

Illustrative example in our own words: not a real project or organisation.