Day 53 of 55Stage 5 · ControlWednesdayKanban, 5S and mistake-proofing

Lean controls

Not every control is a chart. Amara and the team build controls into the workplace itself.

Stage goal: Make the gains last and hand the process back.
Team
Ayumi (Healthcare Assistant) Alma (Reception Team Lead)
Documents today Control plan
How the day goes
  1. 09:00Two-bin kanban with Ayumi (Healthcare Assistant)
  2. 11:005S check of the supply room
  3. 15:00Test the mistake-proofing with Alma (Reception Team Lead)

Situation 1 of 2

09:00 · Two-bin kanban with Ayumi (Healthcare Assistant)
Ayumi (Healthcare Assistant)
Ordering supplies is still guesswork. Half the cupboard still goes out of date.

How do you control supplies?

A kanban controls stock with a visual signal: use triggers the order, sized to cover lead time and a safety margin.
Worked example 1

How many blood tubes in each bin?

Ayumi (Healthcare Assistant) sets up a two-bin kanban for blood tubes: when the first bin is empty, its card goes to the supplier and the second bin is used.

InputValue
Average use per day40 tubes
Supplier lead time3 days
Safety stock1 day of use
Box size50 tubes
Download the data (spreadsheet file)
  1. Use during lead time40 × 3= 120 tubes
  2. Safety stock40 × 1= 40 tubes
  3. Bin size120 + 40= 160 tubes
  4. Round to boxes160 ÷ 50 = 3.2= 4 boxes (200 tubes) per bin
  5. Stock held at mosttwo bins= 400 tubes, down from about 1,100
What it meansTwo bins of 200 tubes cover the supplier's lead time with a day to spare, with about a third of the old stock and no tubes going out of date.
What Amara decidesRoll out two-bin kanbans for the 12 most-used supplies, and add a monthly 5S check of the supply room to the control plan.
Try it yourself in a spreadsheet
Bin size=B2*B3+B2*B4
Boxes per bin=ROUNDUP(D2/B5,0)

If the supplier's lead time doubled to 6 days, how big would each bin need to be?

Show the answer

40 × 6 + 40 = 280 tubes, so 6 boxes (300 tubes).

Situation 2 of 2

15:00 · Test the mistake-proofing with Alma (Reception Team Lead)
Alma (Reception Team Lead)
How do we know the urgent-slot lock and the 5S at the desk will still work in six months?

How do you control them?

Mistake-proofing and 5S need regular checks with owners, written into the control plan.

Key concepts

The ideas behind today. Concept how the work is done, in our own words · Common practice widely used ways of working.

Common practice

Kanban

  • Using stock triggers its replacement. Bin size = use per day × lead time + safety stock. No counting, no overstock, no running out.

Where you will meet this: Kanban · two-bin system · pull

Common practice

Keeping 5S going

  • Short regular checks against a photo standard, with an owner. Without them the workplace drifts back within weeks.

Where you will meet this: 5S controls

Common practice

Checking mistake-proofing

  • Test locks and checks regularly: they can be switched off, bypassed or broken without anyone noticing.

Where you will meet this: Poka-yoke controls

Explained in our own words. This helps you understand the concepts behind the certifications; it does not reproduce or replace any official guide. Sources

Day 53 complete

2 situations today.

Your responsibility todayBuilding controls into the workplace
Technique you usedKanban, 5S checks, mistake-proofing checks
Key points to remember
  • A kanban controls stock with a visual signal: use triggers the order, sized to cover lead time and a safety margin.
  • Mistake-proofing and 5S need regular checks with owners, written into the control plan.