Is it normal?
Many statistical tools assume data follows the bell-shaped normal curve. Waiting times rarely do. Amara checks before choosing tools.
- 09:00Normality check with Astrid (Data Analyst)
- 11:00Probability plot with Astrid (Data Analyst)
- 15:00What it means for the next steps, with Augustin (Black Belt)
Situation 1 of 2
11:00 · Probability plot with Astrid (Data Analyst)How do you read it?
Checking normality
Astrid (Data Analyst) runs an Anderson-Darling normality test on the 60 waiting times and draws a normal probability plot.
| Request | Wait (days) |
|---|---|
| R01 | 12 |
| R02 | 13 |
| R03 | 12 |
| R04 | 28 |
| R05 | 11 |
| R06 | 12 |
| R07 | 16 |
| R08 | 7 |
| R09 | 3 |
| R10 | 4 |
| R11 | 4 |
| R12 | 10 |
| R13 | 4 |
| R14 | 17 |
| R15 | 5 |
| R16 | 8 |
| R17 | 5 |
| R18 | 5 |
| R19 | 5 |
| R20 | 20 |
| R21 | 3 |
| R22 | 15 |
| R23 | 5 |
| R24 | 9 |
| R25 | 5 |
| R26 | 5 |
| R27 | 15 |
| R28 | 15 |
| R29 | 14 |
| R30 | 13 |
| R31 | 18 |
| R32 | 16 |
| R33 | 3 |
| R34 | 5 |
| R35 | 10 |
| R36 | 7 |
| R37 | 6 |
| R38 | 10 |
| R39 | 10 |
| R40 | 5 |
| R41 | 5 |
| R42 | 4 |
| R43 | 5 |
| R44 | 6 |
| R45 | 7 |
| R46 | 11 |
| R47 | 11 |
| R48 | 3 |
| R49 | 13 |
| R50 | 26 |
| R51 | 12 |
| R52 | 22 |
| R53 | 27 |
| R54 | 18 |
| R55 | 4 |
| R56 | 14 |
| R57 | 20 |
| R58 | 3 |
| R59 | 6 |
| R60 | 19 |
- Hypotheses
H0: the data comes from a normal distribution. H1: it doesn't - Test statistic
Anderson-Darling compares the data's shape with a normal curve= A² = 1.76 - Adjust for sample size
A² × (1 + 0.75 ÷ 60 + 2.25 ÷ 60²)= 1.78 - p-value
from the adjusted statistic= about 0.0001 - Decide
p below 0.05: reject H0= not normal - Look at the plot
points curve above the line at the top= long right tail
Try it yourself in a spreadsheet
| Skewness | =SKEW(B2:B61) (0.91: skewed right) |
| Rank-based normal value for a probability plot | =NORM.S.INV((RANK.EQ(B2,$B$2:$B$61,1)-0.375)/(60+0.25)) |
| The test itself | Spreadsheets have no built-in Anderson-Darling: use the skewness and the plot, or a free statistics add-on |
A different data set gives a normality p-value of 0.42. What do you conclude?
Show the answer
p is above 0.05, so there's no evidence against normality: you can treat the data as roughly normal. (It doesn't prove it's normal.)
Situation 2 of 2
15:00 · What it means for the next steps, with Augustin (Black Belt)What follows from it?
Key concepts
The ideas behind today. Concept how the work is done, in our own words · Common practice widely used ways of working.
The normal distribution
- A symmetrical bell shape: about 68% of values within one standard deviation of the mean, 95% within two, 99.7% within three.
- Many tools assume it. Waiting times, costs and durations are usually skewed instead.
Where you will meet this: Normal distribution · 68-95-99.7 rule
Testing normality
- A normality test such as Anderson-Darling gives a p-value. Below 0.05: the data is probably not normal.
- A probability plot shows how: normal data lies along a straight line.
Where you will meet this: Anderson-Darling test · normal probability plot
What to do with non-normal data
- Use tools that don't need normal data, look for mixed processes, or transform the data. Never delete awkward values to make data look normal.
Explained in our own words. This helps you understand the concepts behind the certifications; it does not reproduce or replace any official guide. Sources
Day 21 complete
2 situations today.
- In a normality test, a p-value below 0.05 means the data is probably not normal. Look at the plot to see how.
- Non-normal data isn't a problem. Choose tools that suit it, and never delete data to make it fit.