Day 37 of 55Stage 4 · ImproveTuesdayCorrelation

Measuring the likely cause

Urgent cases quietly using routine slots was the top FMEA risk, but nobody had measured it. Amara starts counting.

Stage goal: Test and put in place solutions that remove the root causes.
Team
Alma (Reception Team Lead) Astrid (Data Analyst)
How the day goes
  1. 09:00Daily urgent count with Alma (Reception Team Lead)
  2. 11:00Weekly data with Astrid (Data Analyst)
  3. 15:00Scatter plot and correlation with Astrid (Data Analyst)

Situation 1 of 2

09:00 · Daily urgent count with Alma (Reception Team Lead)
Alma (Reception Team Lead)
We can count urgent cases in routine slots from the booking codes. Going back 20 weeks?

What do you ask for?

Turn a likely cause into data, with the same definition every time, before deciding.

Situation 2 of 2

15:00 · Scatter plot and correlation with Astrid (Data Analyst)
Astrid (Data Analyst)
The correlation is 0.46. Is that a lot?

How do you read it?

Correlation measures how closely two things move together, from −1 to +1. It's a link, not proof of cause.
Worked example 1

Does urgent use of routine slots go with longer waits?

Astrid (Data Analyst) counts, for each of the 20 weeks, the share of routine slots used for urgent cases, and plots it against that week's median wait.

Weekly median wait against urgent use of routine slots05101520810131618Urgent use of routine slots (%)Median wait (days)11, 813, 915, 811, 714, 910, 814, 912, 811, 812, 912, 812, 108, 1014, 1110, 1118, 1213, 1216, 1312, 1215, 13
WeekRoutine slots offeredUrgent use of routine slots (%)Median wait (days)
Week 1259118
Week 2261139
Week 3270158
Week 4265117
Week 5254149
Week 6262108
Week 7259149
Week 8263128
Week 9254118
Week 10263129
Week 11263128
Week 122401210
Week 13234810
Week 142351411
Week 152251011
Week 162431812
Week 172221312
Week 182381613
Week 192301212
Week 202281513
Download the data (spreadsheet file)
  1. Plot firsteach week is one point: urgent use across, wait up
  2. Correlation coefficientr measures how closely points follow a straight line, from −1 to +1= r = 0.46
  3. Strength0 to 0.3 weak, 0.3 to 0.7 moderate, above 0.7 strong= moderate, positive
  4. Is it real?test of r with 18 degrees of freedom= p = 0.04
  5. Share explainedr² = 0.46²= 21% of the week-to-week variation
What it meansWeeks with more urgent cases in routine slots tend to have longer waits, but the link is moderate. Something else explains more of the variation: the number of routine slots offered.
What Amara decidesUrgent use moves from “likely” to “proven, moderate effect”. Next, build a model with both causes together.
Try it yourself in a spreadsheet
Correlation=CORREL(C2:C21,D2:D21)
r²=RSQ(D2:D21,C2:C21)
ChartInsert a scatter chart of columns C and D, then add a trendline

A scatter plot shows r = −0.85 between staff on duty and queue length. What does that tell you?

Show the answer

A strong negative link: more staff goes with shorter queues. It's still a link, not proof of cause, but with a clear mechanism it's convincing.

Key concepts

The ideas behind today. Concept how the work is done, in our own words · Common practice widely used ways of working.

Common practice

From likely to measured

  • A likely cause from an FMEA or a fishbone needs data before it's acted on. Define it, count it the same way each time, and line it up with the result.
Common practice

Scatter plots

  • Plot the possible cause across and the result up. The shape shows the relationship: straight, curved, clusters, or none.

Where you will meet this: Scatter diagram

Concept

Correlation

  • r runs from −1 to +1: how closely the points follow a straight line. r² is the share of the variation explained. Correlation isn't cause: a third factor can drive both.

Where you will meet this: Correlation coefficient (r)

Explained in our own words. This helps you understand the concepts behind the certifications; it does not reproduce or replace any official guide. Sources

Day 37 complete

2 situations today.

Your responsibility todayQuantifying a relationship
Technique you usedScatter plot, correlation
Key points to remember
  • Turn a likely cause into data, with the same definition every time, before deciding.
  • Correlation measures how closely two things move together, from −1 to +1. It's a link, not proof of cause.