Day 50 of 55Stage 5 · ControlFridayP and NP charts

Counting yes or no

Was an appointment offered within 7 days? Was the appointment missed? Yes-or-no data needs its own charts.

Stage goal: Make the gains last and hand the process back.
Team
Astrid (Data Analyst)
Techniques today P chart NP chart
How the day goes
  1. 09:00P chart with Astrid (Data Analyst)
  2. 11:00Investigate day 9
  3. 15:00NP chart for missed appointments

Situation 1 of 1

09:00 · P chart with Astrid (Data Analyst)
Astrid (Data Analyst)
The number of requests changes every day: 40 one day, 60 the next. Can we chart the share not offered within 7 days?

Which chart fits?

For the share of defective items with varying sample sizes, use a P chart; with a fixed sample size, an NP chart.
Worked example 1

P chart: share not offered an appointment within 7 days

Every request is checked: was an appointment offered within 7 days? The number of requests changes each day, so the limits change too.

P chart, with limits that depend on each day's number of requests00.10.20.30.4CLUCLDay 1: 0.105Day 2: 0Day 3: 0.12Day 4: 0.022Day 5: 0.109Day 6: 0.05Day 7: 0.122Day 8: 0.075Day 9: 0.302 (outside the limits)Day 10: 0.07Day 11: 0.019Day 12: 0.034Day 13: 0.1Day 14: 0.096Day 15: 0.083Day 16: 0.073Day 17: 0.208Day 18: 0.157Day 19: 0.098Day 20: 0.085Day 1Day 4Day 7Day 10Day 13Day 16Day 19Share not within 7 days
DayRequestsNot within 7 daysShareUpper limit
Day 15760.1050.211
Day 253000.215
Day 35060.120.219
Day 44510.0220.225
Day 54650.1090.224
Day 64020.050.233
Day 74150.1220.232
Day 84030.0750.233
Day 943130.3020.228
Day 105740.070.211
Day 115310.0190.215
Day 125920.0340.209
Day 135050.10.219
Day 145250.0960.216
Day 156050.0830.208
Day 165540.0730.213
Day 1753110.2080.215
Day 185180.1570.218
Day 195150.0980.218
Day 205950.0850.209
Download the data (spreadsheet file)
  1. Average sharetotal not within 7 ÷ total requests= 0.095
  2. Upper limit for each day0.095 + 3 × √(0.095 × 0.905 ÷ n); day 1, n = 57= 0.211
  3. Lower limitbelow zero for these sample sizes= none
  4. Readday 9: 0.302 against its limit of 0.228= a signal
  5. Find the causeday 9: the booking system was down for 3 hours= special cause
  6. Recalculate without day 9= 0.085
What it meansAbout 9% of requests now miss the 7-day standard on a normal day (the goal is under 10%). Day 9 was an unusual day with a clear cause, not a sign the process has slipped.
What Amara decidesAdd a booking-system outage to the response plan: paper booking sheets at the desk, entered when the system returns.
Try it yourself in a spreadsheet
Share=C2/B2
Average share=SUM(C2:C21)/SUM(B2:B21)
Upper limit=$G$1+3*SQRT($G$1*(1-$G$1)/B2) (G1 = average share)

Why do the limits get closer together on days with more requests?

Show the answer

The more items in a day, the less the share varies by chance: the limit width shrinks with the square root of n.

Worked example 2

NP chart: missed appointments in a fixed sample

Each day, 50 appointments are checked for missed or attended. With a fixed sample size, the count can be charted directly.

NP chart: missed appointments out of 50 a day02.557.51012.5CLUCLDay 1: 5Day 2: 3Day 3: 1Day 4: 1Day 5: 6Day 6: 7Day 7: 5Day 8: 5Day 9: 4Day 10: 7Day 11: 6Day 12: 0Day 13: 6Day 14: 1Day 15: 5Day 16: 2Day 17: 6Day 18: 4Day 19: 3Day 20: 4Day 1Day 4Day 7Day 10Day 13Day 16Day 19Missed out of 50
DayAppointments checkedMissed
Day 1505
Day 2503
Day 3501
Day 4501
Day 5506
Day 6507
Day 7505
Day 8505
Day 9504
Day 10507
Day 11506
Day 12500
Day 13506
Day 14501
Day 15505
Day 16502
Day 17506
Day 18504
Day 19503
Day 20504
Download the data (spreadsheet file)
  1. Average countaverage missed per day= 4.05 of 50 (8.1%)
  2. Limits4.05 ± 3 × √(4.05 × (1 − 0.081))= 0 to 9.84
  3. Readall points inside= stable
What it meansMissed appointments are stable at about 8%, half the old 15.7%.
What Amara decidesKeep the NP chart weekly for three months, then monthly if it stays stable.
Try it yourself in a spreadsheet
Average=AVERAGE(C2:C21)
Upper limit=D1+3*SQRT(D1*(1-D1/50))

When would you use a P chart instead of an NP chart?

Show the answer

When the number checked each day varies. NP charts need a constant sample size.

Key concepts

The ideas behind today. Concept how the work is done, in our own words · Common practice widely used ways of working.

Common practice

P charts

  • The share failing a check each period, with limits for each period's sample size: p̄ ± 3 × √(p̄(1 − p̄) ÷ n).

Where you will meet this: P chart

Common practice

NP charts

  • The number failing, when the same number is checked every period: np̄ ± 3 × √(np̄(1 − p̄)).

Where you will meet this: NP chart

Concept

Special causes

  • A point outside the limits with a known cause (a system outage) is investigated and acted on, then left out when the limits are recalculated.

Explained in our own words. This helps you understand the concepts behind the certifications; it does not reproduce or replace any official guide. Sources

Day 50 complete

1 situation today.

Your responsibility todayCharting yes-or-no data
Technique you usedP chart, NP chart
Key points to remember
  • For the share of defective items with varying sample sizes, use a P chart; with a fixed sample size, an NP chart.
Techniques today P chart NP chart