Day 19 of 55Stage 2 · MeasureThursdayGauge study

Can we trust the stopwatch?

To plan reception capacity, the team times calls with a stopwatch. Before using the times, Amara checks how much of the variation comes from the timing itself.

Stage goal: Map the process and measure how it performs today, with data you can trust.
Team
Astrid (Data Analyst)
Stakeholders
Augustin (Black Belt)
How the day goes
  1. 09:00Record 10 calls with Astrid (Data Analyst)
  2. 11:00Three people time each call twice
  3. 15:00Work out the gauge study with Augustin (Black Belt)

Situation 1 of 2

09:00 · Record 10 calls with Astrid (Data Analyst)
Astrid (Data Analyst)
We'll time real calls. Does it matter who holds the stopwatch?

How do you set up the check?

A gauge study measures the same items several times, by several people, to separate measurement error from real variation.

Situation 2 of 2

15:00 · Work out the gauge study with Augustin (Black Belt)
Augustin (Black Belt)mentor
The gauge study says 13.8% of the variation comes from measuring. Good or bad?

How do you read it?

Judge measurement error against the purpose: under 10% is good, 10 to 30% may be acceptable, over 30% needs fixing.
Worked example 1

Linearity: is the stopwatch equally accurate for short and long calls?

Recordings of known length (2, 4, 6, 8 and 10 minutes, timed by the phone system) are each timed 3 times with the stopwatch. Bias = stopwatch time − true time.

Bias against the true length, with the fitted line00.10.20.30.4246810True length (minutes)Bias (minutes)2, 0.152, -0.032, 0.084, 0.094, 0.14, 0.116, 0.086, 0.156, 0.138, 0.348, 0.228, 0.210, 0.2510, 0.2310, 0.22
RecordingTrue length (min)Stopwatch (min)Bias (min)
T0122.150.15
T0221.97-0.03
T0322.080.08
T0444.090.09
T0544.10.1
T0644.110.11
T0766.080.08
T0866.150.15
T0966.130.13
T1088.340.34
T1188.220.22
T1288.20.2
T131010.250.25
T141010.230.23
T151010.220.22
Download the data (spreadsheet file)
  1. Average biasaverage of all 15 biases= +0.155 minutes (about 9 seconds)
  2. Does bias change with size?regress bias on the true length= bias = 0.009 + 0.0243 × length
  3. Is the slope real?p-value of the slope= 0.0005: yes
  4. Bias at each endat 2 minutes: 0.009 + 0.0243 × 2; at 10: 0.009 + 0.0243 × 10= 0.06 and 0.25 minutes
What it meansThe stopwatch reads long, and more so for longer calls: about 4 seconds on a 2-minute call, 15 seconds on a 10-minute call. That's a linearity problem as well as a bias.
What Amara decidesSmall against call lengths used for staffing, but it adds up: the team corrects stopwatch times by the fitted line, and moves to the phone system's own timer when it's available.
Try it yourself in a spreadsheet
Bias=C2-B2
Slope and its p-value=LINEST(D2:D16,B2:B16,TRUE,TRUE)
Average bias=AVERAGE(D2:D16)

If the slope had been 0.000 with an average bias of +0.15, what kind of problem would that be?

Show the answer

Pure bias: the same offset at every length. Correct it by subtracting 0.15 minutes; there's no linearity problem.

Worked example 2

Gauge repeatability and reproducibility

Alma, Anouk and Arturo time 10 recorded calls twice each (minutes). The average and range method separates the stopwatch method's error from the real differences between calls.

Share of total variation, in percent0255075100Repeat- / ability: 11.911.9Repeat-abilityReproduc- / ibility: 7.07.0Reproduc-ibilityTotal / gauge: 13.813.8TotalgaugeReal call / differences: 99.099.0Real calldifferences
CallAlma 1Alma 2Anouk 1Anouk 2Arturo 1Arturo 2
Call 14.03.74.03.93.83.7
Call 24.24.04.44.24.24.0
Call 37.87.87.78.18.07.3
Call 42.32.33.02.92.72.6
Call 56.26.36.46.65.96.0
Call 67.17.57.27.16.97.2
Call 73.33.63.23.83.42.9
Call 82.42.62.72.82.82.4
Call 93.83.74.34.13.83.8
Call 106.76.46.56.46.76.5
Download the data (spreadsheet file)
  1. Average rangefor each person and call, the difference between their two times; average all 30= 0.22 minutes
  2. Repeatabilityaverage range × 0.8862 (for 2 trials)= 0.195
  3. Reproducibilityperson averages differ by 4.965 − 4.730 = 0.235; √((0.235 × 0.5231)² − 0.195² ÷ (10 × 2))= 0.115
  4. Gauge error√(0.195² + 0.115²)= 0.226
  5. Real variation between callsrange of call averages 5.167 × 0.3146= 1.625
  6. Gauge sharetotal = √(0.226² + 1.625²) = 1.641; gauge ÷ total = 0.226 ÷ 1.641= 13.8%
  7. Distinct groups1.41 × 1.625 ÷ 0.226= 10
What it meansAbout 14% of the variation in the times comes from the timing method: acceptable for planning staffing (10 to 30% may be acceptable). The method can tell about 10 groups of call length apart, well above the minimum of 5.
What Amara decidesUse the call times for capacity planning. Write a start-and-stop rule (start at “hello”, stop when the booking is saved) to reduce the repeatability error further.
Try it yourself in a spreadsheet
Range for one person and call=ABS(B2-C2)
Average range=AVERAGE(H2:J11) (ranges in H to J)
Repeatability=K12*0.8862
Gauge share=SQRT(EV^2+AV^2)/SQRT(EV^2+AV^2+PV^2)

If the gauge error stayed at 0.226 but the calls varied much less (real variation 0.6), what would the gauge share be?

Show the answer

√(0.226² + 0.6²) = 0.641; 0.226 ÷ 0.641 = 35%. The same stopwatch would no longer be good enough: acceptability depends on what you're measuring.

Key concepts

The ideas behind today. Concept how the work is done, in our own words · Common practice widely used ways of working.

Concept

Precision: repeatability and reproducibility

  • Repeatability: does one person get the same result twice? Reproducibility: do different people get the same result?
  • Together they make the measurement error, compared with the total variation.

Where you will meet this: Gauge R&R · precision

Concept

Accuracy: bias, linearity and stability

  • Bias: is the measurement right on average? Linearity: is the bias the same across the range? Stability: does it stay the same over time?
  • Checked by measuring known standards.

Where you will meet this: Accuracy · bias · linearity · stability

Common practice

Good enough for the purpose

  • Gauge share under 10% is good, 10 to 30% may be acceptable depending on the decision, over 30% needs fixing. The method should also tell at least 5 groups of values apart.

Where you will meet this: % study variation · number of distinct categories

Explained in our own words. This helps you understand the concepts behind the certifications; it does not reproduce or replace any official guide. Sources

Day 19 complete

2 situations today.

Your responsibility todayChecking a measurement method
Technique you usedGauge repeatability and reproducibility
Key points to remember
  • A gauge study measures the same items several times, by several people, to separate measurement error from real variation.
  • Judge measurement error against the purpose: under 10% is good, 10 to 30% may be acceptable, over 30% needs fixing.