Bigger samples
The 8 o'clock phone queue was a big part of the old problem. Alma now samples 12 calls every morning. Amara shows which chart fits.
- 08:00Sample 12 calls with Alma (Reception Team Lead)
- 11:00Xbar-S chart with Alma (Reception Team Lead)
- 15:00Update the control plan
Situation 1 of 1
11:00 · Xbar-S chart with Alma (Reception Team Lead)Which chart?
Xbar-S chart of phone answer times
At 8 o'clock, Alma (Reception Team Lead) records how long 12 callers wait for an answer (minutes), every day for 15 days. With subgroups of 10 or more, the standard deviation is a better measure of spread than the range.
| Day | Call 1 | Call 2 | Call 3 | Call 4 | Call 5 | Call 6 | Call 7 | Call 8 | Call 9 | Call 10 | Call 11 | Call 12 | Average | Standard deviation |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Day 1 | 1.4 | 1.9 | 3.8 | 1.6 | 3.2 | 2.5 | 1.3 | 2.4 | 2.1 | 1.6 | 1.5 | 2.1 | 2.12 | 0.76 |
| Day 2 | 2.7 | 0.8 | 1.3 | 1 | 2.2 | 1.2 | 1.2 | 2.5 | 3.8 | 0.6 | 1.2 | 2.3 | 1.73 | 0.96 |
| Day 3 | 1.9 | 3.5 | 3.2 | 1.8 | 4.3 | 6.3 | 3.3 | 1.6 | 4.1 | 2.4 | 3 | 2 | 3.12 | 1.35 |
| Day 4 | 2.3 | 3.4 | 1.1 | 3.5 | 1.3 | 2.7 | 1 | 1.1 | 2.2 | 2.1 | 1.7 | 0.7 | 1.92 | 0.94 |
| Day 5 | 1.8 | 1.7 | 1.5 | 2.4 | 2.3 | 2.8 | 4.9 | 1.3 | 2.2 | 1.5 | 2.3 | 1.8 | 2.21 | 0.96 |
| Day 6 | 5.1 | 2.5 | 1.2 | 2.2 | 1.6 | 3.1 | 3.4 | 2.8 | 3 | 3.1 | 1.8 | 3 | 2.73 | 1.01 |
| Day 7 | 2.2 | 5.3 | 1.2 | 2.2 | 1.8 | 4.6 | 1.9 | 1.8 | 2.5 | 3 | 1.1 | 1.5 | 2.43 | 1.3 |
| Day 8 | 0.8 | 3.4 | 3.4 | 1.8 | 2.1 | 2.1 | 5.7 | 1.3 | 2.7 | 1.6 | 2.8 | 2.7 | 2.53 | 1.28 |
| Day 9 | 2.8 | 5.1 | 1 | 4.3 | 0.6 | 2.2 | 1.2 | 3.2 | 2 | 4.8 | 2.6 | 2 | 2.65 | 1.47 |
| Day 10 | 1.4 | 2.1 | 2 | 4.1 | 3.8 | 2.3 | 0.4 | 3.7 | 1.2 | 1.6 | 2.8 | 1.5 | 2.24 | 1.15 |
| Day 11 | 4.1 | 3 | 1 | 3 | 1.3 | 2.3 | 1.8 | 2.5 | 3.5 | 4.1 | 1.8 | 2.8 | 2.6 | 1.01 |
| Day 12 | 2.9 | 1.4 | 3.9 | 3.1 | 4.9 | 2.1 | 2.3 | 3.4 | 1.9 | 4 | 2.3 | 0.5 | 2.72 | 1.22 |
| Day 13 | 1.8 | 2.3 | 1.2 | 3.3 | 1.3 | 2.4 | 1.6 | 3.7 | 3.9 | 1.5 | 2.8 | 2 | 2.32 | 0.93 |
| Day 14 | 5.6 | 1.1 | 1 | 1.5 | 2.9 | 1 | 3.6 | 2.8 | 2.9 | 1.1 | 1.5 | 1.5 | 2.21 | 1.4 |
| Day 15 | 1.8 | 1 | 5.1 | 3.1 | 3.8 | 3.2 | 1.9 | 0.9 | 1.1 | 2.5 | 1.5 | 1.6 | 2.29 | 1.29 |
- Subgroup averages and standard deviations
for each day, of the 12 answer times - Centre lines
average of the averages; average standard deviation= 2.39; 1.135 minutes - Xbar limits
2.39 ± A3 × s̄ = 2.39 ± 0.886 × 1.135 (A3 for subgroups of 12)= 1.38 to 3.39 - S limits
B3 × s̄ to B4 × s̄ = 0.354 × 1.135 to 1.646 × 1.135= 0.40 to 1.87 - Read
all points inside both charts= stable
Try it yourself in a spreadsheet
| Average and standard deviation | =AVERAGE(B2:M2) and =STDEV.S(B2:M2) |
| Limits | =AVERAGE(N2:N16)+0.886*AVERAGE(O2:O16) |
| S limits | =0.354*AVERAGE(O2:O16) and =1.646*AVERAGE(O2:O16) |
When should you choose Xbar-S over Xbar-R?
Show the answer
When subgroups have 10 or more items (or vary in size). The range only uses the two extreme values; the standard deviation uses them all.
Key concepts
The ideas behind today. Concept how the work is done, in our own words · Common practice widely used ways of working.
Xbar-S charts
- For subgroups of 10 or more: the standard deviation uses every value, the range only two. Limits: X̿ ± A3 × s̄; S chart B3 × s̄ to B4 × s̄.
Where you will meet this: Xbar-S chart
Read the spread first
- Average-chart limits are built from the spread. If the S (or R) chart is out of control, fix that first.
Relax checks that stay stable
- When a measure has been stable for a while, check it less often and put the effort where risks remain.
Explained in our own words. This helps you understand the concepts behind the certifications; it does not reproduce or replace any official guide. Sources
Day 49 complete
1 situation today.
- For subgroups of 10 or more, use an Xbar-S chart instead of Xbar-R.