Day 3 of 55Stage 0 · Getting startedWednesdayWaste

Eight kinds of waste

Amara has 40 observations from yesterday. Sorting them shows the clinic loses time in the same few ways, again and again.

Stage goal: See the work as it really is, and pick the problem worth solving.
Team
Astrid (Data Analyst) Ayumi (Healthcare Assistant) Alma (Reception Team Lead)
How the day goes
  1. 09:00Sort the observations with Astrid (Data Analyst)
  2. 13:00Supplies with Ayumi (Healthcare Assistant)
  3. 16:00Huddle with Alma (Reception Team Lead)

Situation 1 of 3

09:00 · Sort the observations with Astrid (Data Analyst)
Astrid (Data Analyst)
I've typed up your notes. Forty observations. How do we make sense of them?

What's a good first step?

Sorting observations into the eight wastes turns a long list into a few patterns.
Worked example 1

Which waste costs the most time?

Astrid (Data Analyst) counts the 40 observations by kind of waste and draws a Pareto chart.

Observations by kind of waste, largest first, with the cumulative share051015200%25%50%75%100%Waiting: 14.014WaitingRework: 7.07ReworkMovement: 6.06MovementExtra / processing: 5.05ExtraprocessingExcess / stock: 3.03ExcessstockTransport: 2.02TransportOver- / production: 2.02Over-productionUnused / talent: 1.01Unusedtalent80%
Kind of wasteObservationsShareCumulative share
Waiting1435%35%
Rework and errors717.5%52.5%
Movement615%67.5%
Extra processing512.5%80%
Excess stock37.5%87.5%
Transport25%92.5%
Overproduction25%97.5%
Unused talent12.5%100%
Download the data (spreadsheet file)
  1. Count each kindTally the 40 observations by kind of waste
  2. SortLargest count first
  3. Share of eachcount ÷ total, e.g. Waiting: 14 ÷ 40= 35%
  4. Cumulative shareadd the shares as you go: 35% + 17.5% + 15% + 12.5%= 80% after four kinds
  5. Read the chartWhere does the line cross 80%?= 4 of 8 kinds
What it meansHalf the kinds of waste (waiting, rework, movement and extra processing) account for 80% of what was seen. Waiting alone is more than a third.
What Amara decidesFocus the first improvements on waiting and rework. Keep the small groups on the opportunity log rather than ignoring them.
Try it yourself in a spreadsheet
Sort largest first=SORT(A2:B9, 2, FALSE)
Share=B2/SUM($B$2:$B$9)
Cumulative share=SUM($B$2:B2)/SUM($B$2:$B$9)
ChartExcel: Insert, Statistic chart, Pareto. Google Sheets: a combo chart (bars plus a line)

If all waiting and rework were removed, what share of the observed waste would be left?

Show the answer

100% − 52.5% = 47.5%.

Situation 2 of 3

13:00 · Supplies with Ayumi (Healthcare Assistant)
Ayumi (Healthcare Assistant)
Every morning I restock the treatment rooms. Half of what's in those cupboards goes out of date before we use it.

Which waste is that?

Excess stock wastes money and space, and hides problems.

Situation 3 of 3

16:00 · Huddle with Alma (Reception Team Lead)
Alma (Reception Team Lead)
Half our afternoon calls are patients ringing to ask whether their test results are back.

What is going on?

Work caused by a failure somewhere else is waste. Remove the cause, not the caller.

Key concepts

The ideas behind today. Concept how the work is done, in our own words · Common practice widely used ways of working.

Common practice

The eight wastes

  • Waste is anything that uses time or money without helping the customer. Eight kinds are common everywhere: waiting, extra processing, unnecessary movement of people, unnecessary transport of things, rework and errors, overproduction, excess stock, and unused talent.
  • Sorting what you see into these groups shows where most time is lost.

Where you will meet this: Muda (Lean term for waste) · seven or eight wastes

Concept

Excess stock hides problems

  • Stock beyond what's needed costs money, takes space and goes out of date.
  • It also hides problems: when shelves are full, nobody notices an unreliable supplier or a broken ordering system.
Concept

Failure demand

  • Some of the work that arrives is caused by a failure elsewhere: a missing message, an error, a broken promise. Customers call back, chase or complain.
  • Adding staff to handle it treats the symptom. Fixing the original failure makes the work disappear.

Where you will meet this: Failure demand versus value demand

Explained in our own words. This helps you understand the concepts behind the certifications; it does not reproduce or replace any official guide. Sources

Day 3 complete

3 situations today.

Your responsibility todaySpotting waste
Technique you usedThe eight wastes, failure demand
Key points to remember
  • Sorting observations into the eight wastes turns a long list into a few patterns.
  • Excess stock wastes money and space, and hides problems.
  • Work caused by a failure somewhere else is waste. Remove the cause, not the caller.