Where does the variation come from?

Waits vary from 3 days to 28. Is it the day patients ask, the doctor, or the week? Amara looks at each family of variation in turn.

Stage goal: Find and prove the root causes.
Team
Arjun (GP) Astrid (Data Analyst)
How the day goes
  1. 09:00Group the waits with Astrid (Data Analyst)
  2. 11:00Compare the families with Astrid (Data Analyst)
  3. 15:00Talk to Arjun (GP)

Situation 1 of 2

15:00 · Talk to Arjun (GP)
Arjun (GP)
I bet the data will show some doctors are slower than others. That's what people always say.

How do you find out where the variation comes from?

Multi-vari analysis compares families of variation, such as time, place and person, to find which one matters most.

Situation 2 of 2

11:00 · Compare the families with Astrid (Data Analyst)
Astrid (Data Analyst)
Waiting times look skewed. Appointments missed are yes or no. Calls per hour are counts. Do they all behave the same way?

Why does the type of distribution matter?

Know the kind of distribution your data follows. It decides which charts and tests give honest answers.
Worked example 1

Three distributions at the clinic

Augustin (Black Belt) shows how the right distribution answers three practical questions with the clinic's own figures.

QuestionDistributionInputs
Out of 50 appointments in a day, how likely are 12 or more missed?Binomialn = 50, p = 0.157
At 8 o'clock, 12 calls arrive in 15 minutes on average. How likely are 18 or more?Poissonmean 12
Calls arrive on average every 75 seconds. How likely is a 3-minute gap?Exponentialmean 75 seconds
Download the data (spreadsheet file)
  1. Binomial: average and spreadmean n × p = 7.85; standard deviation √(n × p × (1 − p))= 7.85 missed; 2.57
  2. Binomial: 12 or more missed1 − P(11 or fewer)= 8.3%
  3. Poisson: 18 or more calls in 15 minutes1 − P(17 or fewer), mean 12; standard deviation √12 = 3.46= 6.3%
  4. Exponential: a gap longer than 180 secondse^(−180 ÷ 75)= 9.1%
  5. Choosing the distributionyes-or-no out of a fixed number: binomial; counts in a period: Poisson; time between events: exponential
What it meansA day with 12 missed appointments happens about 1 day in 12 by chance alone, so it isn't a signal. A 15-minute burst of 18 calls happens about 1 in 16. Knowing the distribution stops the team overreacting to normal events.
What Amara decidesUse these chances when planning: reception staffing covers the busy 15 minutes that happen by chance, and nobody investigates a day of 12 missed appointments unless it repeats.
Try it yourself in a spreadsheet
Binomial: 12 or more=1-BINOM.DIST(11,50,0.157,TRUE)
Poisson: 18 or more=1-POISSON.DIST(17,12,TRUE)
Exponential: gap over 180 s=1-EXPON.DIST(180,1/75,TRUE)

How likely is it that 4 or fewer of 50 appointments are missed?

Show the answer

=BINOM.DIST(4,50,0.157,TRUE) = 8.9%.

Worked example 2

Which family of variation is biggest?

Astrid (Data Analyst) groups the 60 waits three ways: by the day the patient first asked, by the doctor seen, and by the week. For each family she compares the lowest and highest group average.

Range of group averages for each family, in days0246810Day of / request: 9.59.5Day ofrequestWeek: 2.62.6WeekDoctor: 1.31.3Doctor
FamilyLowest group average (days)Highest group average (days)Range (days)
Day of the request6.4 (Tuesday)15.9 (Monday)9.5
Week (weeks 12 to 20)9.111.72.6
Doctor9.911.31.3
Download the data (spreadsheet file)
  1. Choose the familiesthings that could change how long patients wait: day, week, doctor
  2. Average each groupMonday 15.9 · Tuesday 6.4 · Wednesday 10.2 · Thursday 7.1 · Friday 9.0
  3. Range for each familyhighest − lowest group average= 9.5 · 2.6 · 1.3 days
  4. Compare with the spread inside groupspatients on the same day still vary: pooled standard deviation= 5.4 days
  5. Read itthe biggest difference between groups is the day of the week= day family
What it meansWhen a patient asks matters far more than which doctor they see or which week it is. Monday requests wait more than twice as long as Tuesday ones. There is still a lot of variation within each day, so the day is not the only cause.
What Amara decidesTest the day-of-week effect properly (Days 31 to 33). Doctors aren't the problem, which helps Arjun (GP) and his colleagues trust the project.
Try it yourself in a spreadsheet
Average by day=AVERAGEIFS(C2:C61,B2:B61,"Monday")
Range of averages=MAX(F2:F6)-MIN(F2:F6) (day averages in F)
ChartExcel: a box and whisker chart of column C, grouped by column B

Why is the doctor family's small range good news for the project?

Show the answer

It shows the waits aren't caused by any one doctor. The causes are in how the process is organised, which is what the project can change.

Key concepts

The ideas behind today. Concept how the work is done, in our own words · Common practice widely used ways of working.

Common practice

Families of variation

  • Variation comes from families: over time, between places, between people, between items, within an item.
  • Comparing the range of group averages in each family shows where most of it comes from.

Where you will meet this: Multi-vari analysis · multi-vari chart

Concept

Kinds of distribution

  • Normal: symmetrical bell (many measurements). Skewed, often log-normal: times, costs. Binomial: counts of yes or no out of a fixed number. Poisson: counts of events in a period, such as calls per hour. Exponential: time between random events. Uniform: every value equally likely.

Where you will meet this: Classes of distributions

Concept

Look, then test

  • Multi-vari points where to look. A hypothesis test then confirms whether the difference is real.

Explained in our own words. This helps you understand the concepts behind the certifications; it does not reproduce or replace any official guide. Sources

Day 26 complete

2 situations today.

Your responsibility todayFinding the biggest source of variation
Technique you usedMulti-vari analysis, types of distribution
Key points to remember
  • Multi-vari analysis compares families of variation, such as time, place and person, to find which one matters most.
  • Know the kind of distribution your data follows. It decides which charts and tests give honest answers.