The Improve review
Solutions tested, results proven, a plan to roll out. Amara takes the Improve phase to Atticus (Sponsor).
Stage goal: Test and put in place solutions that remove the root causes.
Stakeholders
Augustin (Black Belt) Atticus (Director of Community Health)
Documents today Phase review checklist Capability study report
How the day goes
- 09:00Capability after the pilot, with Augustin (Black Belt)
- 13:00Review with Atticus (Sponsor)
- 16:00Celebrate the pilot with the team
Situation 1 of 2
09:00 · Capability after the pilot, with Augustin (Black Belt)Augustin (Black Belt)mentor
What does the Improve review need to show?
Which is ready?
The Improve review shows the solutions work, with evidence, and how they'll be rolled out.
Worked example 1
Capability before and after
Amara repeats the Measure-phase capability calculation on the pilot data, against the same 7-day upper limit.
| Measure | Before | Pilot |
|---|---|---|
| Median wait (days) | 10 | 4 |
| Mean (days) | 10.43 | 4.28 |
| Standard deviation (days) | 6.46 | 2.33 |
| Over 7 days | 55% | 12% |
| Parts per million over 7 | 550,000 | 117,000 |
| Sigma level | 1.4 | 2.7 |
| Ppk (upper) | −0.18 | 0.39 |
- Share over 7
7 of 60= 12% - Sigma level
normal value with 88% below it, + 1.5: 1.19 + 1.5= 2.7 - Ppk
(7 − 4.28) ÷ (3 × 2.33)= 0.39 - Why Ppk still looks low
the data is still skewed: a few long waits widen the standard deviation= use the observed share - Against the goal
90% within 7 days needs about 10% over= nearly there
What it meansPatients waiting more than 7 days fell from 55% to 12%, and the sigma level rose from 1.4 to 2.7. The process is now close to meeting the requirement.
What Amara decidesMove to Control with the full package plus cover for the lost sessions, and confirm 90% in the first weeks of roll-out.
Try it yourself in a spreadsheet
| Share over 7 | =COUNTIF(B2:B61,">7")/60 |
| Sigma level | =NORM.S.INV(1-D2)+1.5 |
| Ppk | =(7-AVERAGE(B2:B61))/(3*STDEV.S(B2:B61)) |
What sigma level would 10% over 7 days give?
Show the answer
NORM.S.INV(0.90) = 1.28; + 1.5 = 2.8.
Situation 2 of 2
13:00 · Review with Atticus (Sponsor)Atticus (Director of Community Health)sponsor
What about designed experiments? Augustin mentioned them.
How do you answer?
Designed experiments vary several factors at once in a planned way. Useful when factors interact; not needed for every project.
Key concepts
The ideas behind today. Concept how the work is done, in our own words · Common practice widely used ways of working.
Common practice
What Improve must deliver
- Solutions chosen against criteria and linked to proven causes, pilot results with statistics, an updated FMEA, an implementation plan and expected benefits.
Where you will meet this: Improve tollgate
Common practice
Capability before and after
- Repeat the baseline capability on the new data, with the same limit and definitions. It shows how far the process has moved towards the requirement.
Concept
Designed experiments
- Vary several factors together in a planned pattern (for example every combination of two settings for each factor) to find their effects and interactions in few runs. An optional extra beyond the Green Belt essentials.
Where you will meet this: Design of experiments (DOE) · full factorial
Explained in our own words. This helps you understand the concepts behind the certifications; it does not reproduce or replace any official guide. Sources
Day 45 complete
2 situations today.
Your responsibility todayClosing the Improve phase
Technique you usedCapability before and after, phase review
Key points to remember
- The Improve review shows the solutions work, with evidence, and how they'll be rolled out.
- Designed experiments vary several factors at once in a planned way. Useful when factors interact; not needed for every project.
Documents today Phase review checklist Capability study report