Day in the RoleMeasurement system studyCan we trust the data?
Version
1.0
Date
15 March
MeasureCall length (minutes)
MethodStopwatch on recorded calls
PeopleAlma, Anouk, Arturo
Items10 calls
Repeats2 each
Gauge study: measured values
Result
Value
Guide
Verdict
Repeatability
11.9%
Reproducibility
7.0%
Total gauge
13.8%
Under 10% good · 10 to 30% may be acceptable
Acceptable
Distinct groups
10
5 or more
Good
Attribute agreement: categories
Agreement
Value
Alma: agrees with self / with GP
95% / 90%
Anouk: agrees with self / with GP
85% / 75%
Arturo: agrees with self / with GP
90% / 80%
All three with GP
65%, then 95% after the guide
Gauge share of total variation: under 10% good, 10 to 30% may be acceptable for the purpose, over 30% fix the method. Agreement: 90% or more good, under 80% act.
Decision
Call times: use for capacity planning; add a start-and-stop rule. Urgent or routine: use only after the one-page guide and retest (95%).
Project leader
Signature
Date
Process owner
Signature
Date
Day in the Role · Measurement system studyIllustrative example · not a real project or organisation · dayintherole.com
Day in the RoleMeasurement system studyCan we trust the data?
Version
Date
Measure
Method
People
Items
Repeats
Gauge study: measured values
Result
Value
Guide
Verdict
Attribute agreement: categories
Agreement
Value
Gauge share of total variation: under 10% good, 10 to 30% may be acceptable for the purpose, over 30% fix the method. Agreement: 90% or more good, under 80% act.
Decision
Project leader
Signature
Date
Process owner
Signature
Date
Day in the Role · Measurement system studyTemplate · free to use and adapt · dayintherole.com
Illustrative example in our own words: not a real project or organisation.