Backlog craft · cheat sheet Acceptance criteria and Given/When/Then The conditions an item must meet to do what the user needs, written so anyone can check them.
Common practice 6 steps Used by Product Owner, Project Manager
What it is Acceptance criteria are the specific, testable conditions something must meet to be accepted. They answer: how will we know this is done and right?
When to use it For every item before it is selected in Sprint Planning. Different from the Definition of Done, which applies to all items.
Why it works They remove ambiguity before work starts, give testers something to check, and stop arguments at the end about whether something is finished.
Do Five to eight criteria per item is usually plenty; more suggests the item should be split. Don't Confusing them with the Definition of Done. Writing them alone and handing them over. Step by step Write them before the work starts Together with the people who'll use and build it.
Make each one testable Yes or no, not “user-friendly”.
Cover the important cases The normal case, edge cases, errors and limits.
Keep them about the result What, not how it's built.
Use a clear format A simple list, or Given / When / Then: Given a situation, When something happens, Then this result.
Check them at the end Accept only when every criterion is met.
PreviewAcceptance criteria and Given/When/Then Backlog craft People must agree, before work starts, what “done and right” means. 6 Backlog craft · cheat sheet Definition of Ready (and its risk) A checklist some teams use for when an item is clear enough to bring into Sprint Planning.
Common practice 4 steps Used by Product Owner
What it is A checklist some teams use to decide when an item is clear enough to start: understood, small enough, with acceptance criteria and no blocking dependencies.
When to use it Optional. It can help a new team, but it is not part of Scrum and can turn into a gate that slows work.
Why it works Starting unclear work wastes time. A light checklist helps prepare items before they're planned.
Do Don't let it become a contract between teams; it's a helper, not a rule. Don't Becoming a contract between the Product Owner and Developers. Blocking valuable work because one box isn't ticked. Step by step Agree a short checklist For example: clear goal, acceptance criteria, sized, dependencies known.
Use it while preparing items Not as a gate that blocks everything.
Keep it light Five items at most.
Review it If items still arrive unclear, improve the checklist or the preparation.
PreviewDefinition of Ready (and its risk) Backlog craft Work keeps starting before it's clear enough. 4 Backlog craft · cheat sheet Spikes A short, timeboxed piece of research to reduce uncertainty before committing to a bigger item.
Common practice 5 steps Used by Product Owner
What it is A spike is a short, time-boxed piece of investigation to answer a question or reduce uncertainty before committing to the real work.
When to use it When the team can't estimate or plan an item because of a technical or product unknown.
Why it works Some work can't be estimated or planned until you learn something. A spike buys that knowledge cheaply instead of guessing.
Do A spike without a time box turns into a project. Don't Spikes that never end. Using spikes to avoid delivering anything usable. Step by step Write the question What exactly do we need to learn?
Set a time box Hours or a few days, not open-ended.
Define the output A decision, a small prototype, an estimate.
Do the investigation Only enough to answer the question.
Share and decide Use what you learned to plan the real work.
PreviewSpikes Backlog craft You can't plan or estimate something until you learn more. 5 Backlog craft · cheat sheet Story splitting Cut a big item into smaller ones that each still deliver something usable, top to bottom.
Common practice 5 steps Used by Product Owner
What it is Breaking a large piece of work into smaller pieces that each still deliver something usable, instead of splitting it into technical layers.
When to use it When an item is too big to finish in a Sprint, or when its estimate is very uncertain.
Why it works Small pieces finish sooner, give feedback earlier, and reduce risk. Splitting by value, not by layer, means each piece is useful on its own.
Do If a slice can't be shown working, it isn't a real slice. Don't Horizontal slices that deliver nothing usable until all are done. Step by step Start from the user's goal What does the whole item let someone do?
Look for split patterns By workflow step, by business rule, by data type, simple case first, by user type, by interface.
Check each piece delivers value Could a user or tester use it?
Do the most valuable or risky slice first Learn early.
Avoid splitting by layer “Database part” and “screen part” deliver nothing on their own.
PreviewStory splitting Backlog craft An item is too big to finish soon or deliver value early. 5 Backlog craft · cheat sheet User stories and INVEST Describe a need from the user's point of view, small enough to build, and good enough to start a conversation.
Common practice 6 steps Used by Product Owner
What it is A user story is a short description of something a user needs, written from their point of view: “As a [type of user], I want [something] so that [benefit]”. It's a placeholder for a conversation, not a full specification.
When to use it For most items that add something users can see. Not required by Scrum; any clear format works.
Why it works It keeps the focus on who benefits and why, rather than on technical tasks. The “so that” part helps the team find better solutions and decide what matters.
Do If you can't write the “so that”, question whether it's needed. Stories aren't the only format; use whatever keeps the user's need clear. Don't Writing technical tasks as stories (“As a database…”). Huge stories that fail the Small test. Skipping the “so that”: it is where the value is. Step by step Name a real user A specific type of user, not “the user” or “the system”.
Say what they need In their language, not technical terms.
Say why The benefit for them or the business.
Add acceptance criteria How you'll know it's done (see acceptance criteria).
Check it with INVEST Independent, Negotiable, Valuable, Estimable, Small, Testable.
Talk about it The story starts a conversation between the people who need it and the people who build it.
PreviewUser stories and INVEST Backlog craft You want work described from the user's point of view, with the why. 6 Backlog craft · cheat sheet User story mapping Lay out the user's journey left to right, with details underneath, then draw release lines across it.
Common practice 5 steps Used by Product Owner
What it is A story map lays out a user's journey from left to right (the main activities) and the details under each activity from top to bottom (most important first). Horizontal lines then cut releases across it.
When to use it At the start of a product or a big feature, to see the whole journey and plan the first useful release.
Why it works A flat list hides the big picture. The map shows the whole journey, helps spot gaps, and makes it easy to plan a first release that works end to end.
Do Build it with users or people who know them well. Don't Making the map once and never updating it. Step by step Write the user's main activities Left to right, in the order they happen.
Add steps and details under each Most important at the top.
Walk the journey Tell the story aloud to find missing steps.
Draw the first release line The thinnest set of items that lets a user complete the whole journey.
Add later release lines Each adds value on top.
PreviewUser story mapping Backlog craft A flat list hides the user's journey and the first usable release. 5 Discovery and evidence · cheat sheet Customer interviews Short conversations with real users about their past behaviour, to understand their problems.
Common practice 6 steps Used by Product Owner, Process Improvement Specialist
What it is Short, structured conversations with real users to understand their needs, problems and behaviour, before deciding what to build or change.
When to use it Before deciding what to build, and whenever data shows a problem you don't understand.
Why it works Assumptions about users are often wrong. Hearing them describe real situations shows what actually matters.
Do Don't pitch your idea in the interview; you'll hear politeness, not truth. Don't Asking leading questions. Treating one loud customer as everyone. Step by step Decide what you want to learn Two or three questions, not a feature list.
Find the right people Real or likely users, a mix of types. Five to eight interviews often reveal the main patterns.
Ask about past behaviour “Tell me about the last time you…” rather than “Would you use…?”
Listen more than you talk Follow up with “why?” and “what happened next?”
Take notes, then look for patterns Group findings across interviews.
Turn findings into decisions What will you change because of what you heard?
PreviewCustomer interviews Discovery and evidence You're unsure what users really need or why they behave as they do. 6 Discovery and evidence · cheat sheet Evidence-Based Management measures Look at value from four sides: value today, value still possible, how fast you deliver, and how able you are to change.
Evidence-Based Management Guide 5 steps Used by Product Owner
What it is Evidence-Based Management (EBM) is a framework from Scrum.org for measuring the value a product delivers, using four key areas: current value, unrealised value, time to market and ability to innovate.
When to use it When reporting value to sponsors, beyond this week's numbers.
Why it works It moves the conversation from “how busy are we?” to “are we delivering value, and could we deliver more?”.
Do Explained in our own words; see the official EBM Guide from Scrum.org for the full framework. Don't Measuring output (features shipped) and calling it value. Step by step Pick measures for each area Current value (e.g. satisfaction), unrealised value (e.g. demand not met), time to market (e.g. lead time), ability to innovate (e.g. time spent on new work).
Set goals A strategic goal, intermediate goals and immediate tactical goals.
Measure regularly Look at trends.
Run small experiments Try changes and see how the measures move.
Adapt Keep what works, drop what doesn't.
PreviewEvidence-Based Management measures Discovery and evidence You want to know if a product delivers value, not just output. 5 Discovery and evidence · cheat sheet Hypotheses and experiments Turn an idea into a testable statement, then run the smallest experiment that shows if it's true.
Common practice 5 steps Used by Product Owner
What it is Writing an idea as a testable statement (“we believe X will cause Y, measured by Z”) and running a small experiment to check it before investing more.
When to use it When you aren't sure an idea will create value, and being wrong would be expensive.
Why it works It turns opinions into evidence and limits the cost of being wrong.
Do Decide the success measure before you see the data. Don't Moving the success line after seeing the result. Experiments too small to learn from. Step by step Write the hypothesis We believe [change] will lead to [result] for [who]. We'll know when [measure] reaches [target].
Design the smallest experiment A prototype, a test page, a pilot with a few users.
Decide the measure and the time Before you start, so you can't move the goalposts.
Run it Keep everything else as stable as possible.
Decide Keep, change or drop the idea based on the result.
PreviewHypotheses and experiments Discovery and evidence Opinions differ and a small test could settle it with evidence. 5 Discovery and evidence · cheat sheet Personas A short, evidence-based profile of a typical user group, to keep real people in mind when deciding.
Common practice 5 steps Used by Product Owner
What it is A short, realistic profile of a typical user group, based on research: their goals, frustrations, context and behaviour.
When to use it When the team keeps arguing about “the user” without knowing who that is.
Why it works It helps teams design for real people instead of “everyone”, and settle debates with “what would this person need?”.
Do Personas invented without research just repeat the team's assumptions. Don't Invented personas that only confirm what you wanted to build. Step by step Start from research Interviews, data, support requests.
Group similar users By goals and behaviour, not age or job title alone.
Write one page per persona A name, context, goals, frustrations, a typical day.
Keep to a few Three to five main personas.
Use them in decisions Refer to them when prioritising and designing.
PreviewPersonas Discovery and evidence A team designs for “everyone” and needs real user groups in mind. 5 Discovery and evidence · cheat sheet Product analytics and funnels Measure how users move through key steps, to see where they get stuck.
Common practice 6 steps Used by Product Owner
What it is Measuring how people actually use a product or service: what they do, where they drop out, and what changes after a release.
When to use it Once real users are using the product, to find where value leaks.
Why it works Behaviour data shows what's really happening, which surveys and opinions often miss.
Do Too many measures hide the important ones; pick a few. Don't Vanity numbers (downloads) instead of behaviour. Data without conversations: you see what, not why. Step by step Decide the questions What do you need to know? Where do users struggle?
Choose a few key measures For example completion rate, time to complete, repeat use.
Track them consistently Before and after changes.
Look at journeys, not just totals Where do people drop out?
Combine with talking to users Data shows what; conversations show why.
Respect privacy Collect only what you need, and follow the law.
PreviewProduct analytics and funnels Discovery and evidence You need to see what users actually do, not what they say. 6 Estimation · cheat sheet #NoEstimates Split work into similar small items and forecast by counting how many get Done, instead of estimating each one.
Common practice 5 steps Used by Product Owner
What it is An approach where a team stops estimating each item and instead splits work into similar small pieces, then forecasts by counting how many pieces it finishes.
When to use it With a stable team that already splits work small. Less useful when items vary a lot in size.
Why it works If items are all small and similar, counting them predicts as well as estimating them, and saves the time spent estimating.
Do It needs consistent splitting; it doesn't work with a mix of tiny and huge items. Don't Calling it “no planning”: it still needs a well-split, ordered backlog. Step by step Split work into small, similar pieces Aim for items that each take a few days at most.
Count what gets finished Track items finished per week.
Forecast with ranges Use the history: at 6 to 9 items a week, 40 items take about 5 to 7 weeks.
Keep splitting big things Anything that looks much bigger than usual gets split before it starts.
Check the forecast often Update it every week as real data comes in.
Preview#NoEstimates Estimation Work can be split into small, similar pieces and counted instead. 5 Estimation · cheat sheet Affinity estimation The team silently sorts many items from small to large on a wall, then agrees sizes in one go.
Common practice 5 steps Used by Product Owner
What it is A silent, fast way to size many items at once: the team places cards on a wall from small to large, without talking at first, then discusses only the items that keep moving.
When to use it When there are dozens of items to size, for example at the start of a product or a big new area.
Why it works It sizes dozens of items in under an hour, and the silence stops a few loud voices from dominating.
Do Have someone explain unclear items before the silent round starts. Don't Using it for items that need real discussion; use Planning Poker for those. Step by step Prepare the wall Write “smaller” on the left and “larger” on the right.
Place cards silently Each person places items relative to others. Anyone may move any card, still in silence.
Mark the contested cards Cards that move back and forth get a dot.
Discuss only the dotted ones Short conversations; decide together.
Draw size columns Group the line into sizes or point values.
PreviewAffinity estimation Estimation Dozens of items need sizing in under an hour. 5 Estimation · cheat sheet Planning Poker Everyone estimates at the same time, so nobody anchors on the first number said out loud.
Common practice 6 steps Used by Product Owner
What it is A way for a team to estimate the relative size of work together. Each person picks a card with a number in secret; everyone shows at once; the highest and lowest explain their thinking; then they vote again.
When to use it In refinement, for items the team is about to work on, when you want the whole team's view and to surface hidden assumptions.
Why it works Showing cards at the same time stops people simply copying the most senior person. The discussion between high and low estimates uncovers hidden work and different assumptions.
Do Timebox each item; if it takes more than a few minutes, it needs splitting or research. Estimates are for the team's planning, not for comparing teams. Don't Averaging the numbers instead of talking about the difference. Senior people revealing first. Spending 20 minutes on one item; split it or park it instead. Step by step Prepare cards Usually a sequence like 1, 2, 3, 5, 8, 13, 20 plus “?”. The gaps grow because bigger items are less certain.
Explain the item The person who knows the need explains it and answers questions. They don't estimate.
Everyone picks a card in secret Only people who'll do the work estimate.
Reveal together If the numbers are close, take the common one.
Discuss the extremes Highest and lowest explain. Often one knows something the others don't.
Vote again Usually two rounds are enough. If not, split the item or investigate it first.
PreviewPlanning Poker Estimation A team estimates together and you want hidden assumptions to surface. 6 Estimation · cheat sheet Story points A unit for how big a piece of work is compared with other pieces, not how many hours it takes.
Common practice 6 steps Used by Product Owner
What it is Story points measure how big a piece of work is compared with other pieces, not how many hours it takes. Size includes effort, complexity and uncertainty together.
A team picks a reference item, gives it a number, and sizes everything else relative to it.
When to use it When the Developers want to compare the size of backlog items quickly and use their own history to forecast. Skip it if the team finds it creates more debate than value; the Scrum Guide doesn't require any estimation unit.
Why it works People are poor at predicting hours but fairly good at comparing: “this is about twice that”. Relative sizes, combined with the team's own history, give more reliable forecasts than hour estimates.
Do Never turn points back into hours or use them as targets. Points aren't comparable between teams; each team's scale is its own. Don't Turning points back into hours, or into a target. Comparing points between teams: each team's scale is its own. The Product Owner or a manager estimating for the Developers. Step by step Choose a reference item A small, well-understood piece of work the whole team knows. Give it 2 or 3, so smaller items still fit below it.
Use a coarse scale Often 1, 2, 3, 5, 8, 13. The growing gaps stop debates about tiny differences.
Compare, don't calculate For each new item ask: about the same as the reference, twice as big, much bigger?
Only the people doing the work estimate Others explain and answer questions.
Track what gets finished The points of finished work per period become the team's own pace (velocity) for forecasting.
Re-size when you learn If an item turns out much bigger, split it rather than changing history.
PreviewStory points Estimation You want to compare the size of work items without arguing about hours. 6 Estimation · cheat sheet T-shirt sizing Rough sizes like S, M and L for early or large items where numbers would pretend to be precise.
Common practice 5 steps Used by Product Owner
What it is A quick, rough way to size work using shirt sizes: XS, S, M, L, XL. It's used early, when detail is low and many items need a first sorting.
When to use it Early in a product, for big items far down the backlog, or for roadmap conversations with stakeholders.
Why it works Words like “medium” invite less false precision than numbers, so it's fast and keeps conversations at the right level for early planning.
Do Use it early; switch to finer estimates when you plan the near term in detail. Don't Treating an L as a commitment. Never refining big items into smaller ones. Step by step Agree what each size roughly means For example S ≈ a few days, M ≈ a couple of weeks, L ≈ a month, XL ≈ too big, split it.
Lay out the items Cards on a table or a board with size columns.
Sort quickly together Place each item in a column; move it if someone disagrees, and discuss only real disagreements.
Split the XLs Anything XL is too uncertain to plan; break it down.
Convert only when needed For budgets or roadmaps, map sizes to ranges, never to exact numbers.
PreviewT-shirt sizing Estimation You need a quick, rough sort of many ideas early on. 5 Facilitation · cheat sheet Timeboxing Give an event or activity a maximum length, and end it on time.
Named in the Scrum Guide 5 steps Used by Scrum Master, Product Owner, Project Manager
What it is Giving an activity a fixed maximum length of time and ending it when the time is up, whatever the state.
When to use it For every Scrum event (the Scrum Guide sets maximum durations) and for workshops or discussions that tend to drift.
Why it works It stops meetings and tasks from expanding, forces focus on what matters, and makes planning predictable.
Do A time box is a maximum; finishing early is fine. Don't Ending on time without an outcome. Letting the most senior person extend it. Step by step Set the time box Before starting.
Share the goal of the time box What should be done by the end?
Make time visible A clock or timer.
Check in near the end Five minutes left: what's most important?
Stop on time Decide what to do with anything unfinished.
PreviewTimeboxing Facilitation Meetings or tasks keep expanding to fill all available time. 5 Flow and visual management · cheat sheet Swarming Several Developers work together on one item to finish it, instead of each starting something new.
Common practice 4 steps Used by Scrum Master, Product Owner
What it is Several people working together on one item to finish it faster, instead of each working on separate items.
When to use it When an important item is stuck or at risk, especially near the end of a Sprint.
Why it works Finishing one thing at a time delivers value sooner and reduces the risk of many half-done items.
Do It's a good habit near the end of a period, when many items are almost done. Don't Too many people on one small task. Step by step Pick the most important item Or the one that's blocked.
Ask who can help Even outside their speciality.
Split the work on that item Pair or divide tasks.
Finish it Then move to the next.
PreviewSwarming Flow and visual management One important item is blocked or nearly done and needs finishing. 4 Forecasting · cheat sheet Burn-up and burn-down charts Charts of work done over time that show a likely range for when a set of work might be finished.
Named in the Scrum Guide 6 steps Used by Product Owner, Scrum Master, Project Manager
What it is A chart with two lines over time: total work in scope and work completed. Where the completed line is heading shows when the work is likely to finish.
When to use it To answer “when?” with evidence. The Scrum Guide names burn-downs and burn-ups as useful, but says they don't replace empiricism.
Why it works It shows progress and scope changes on one chart, so stakeholders see both why dates move and how fast work is getting done.
Do Always show a range; a single line suggests false certainty. Don't Promising the fastest line. Using burn-downs to pressure the Developers. Step by step Choose a unit Items, points or value.
Plot total scope It goes up when scope is added.
Plot completed work Each period.
Draw the trend Use a range from slow to fast periods, not one line.
Read the forecast Where the completed range meets the scope line.
Update every period And explain scope changes.
PreviewBurn-up and burn-down charts Forecasting You want to show progress and scope changes together, with a forecast. 6 Metrics · cheat sheet Useful team metrics (and velocity traps) Measures that help a team improve, and the common ways velocity gets misused.
Common practice 5 steps Used by Scrum Master, Product Owner
What it is A small set of measures a team uses to understand and improve how it works: for example throughput, cycle time, quality and satisfaction.
When to use it When leaders ask for numbers, or the team wants to see if changes helped.
Why it works Measures show trends and the effect of changes; they turn improvement into evidence instead of opinion.
Do When a measure becomes a target, it stops being a good measure. Don't Rewarding higher velocity: estimates simply grow. Comparing teams' velocity. Step by step Ask what you want to improve Speed, predictability, quality, wellbeing?
Choose a few measures Three to five.
Collect them simply Ideally automatically.
Look at trends together In reviews.
Never use them to compare or punish That makes people game them.
PreviewUseful team metrics (and velocity traps) Metrics A team wants evidence of whether its changes help. 5 Prioritisation · cheat sheet Buy a feature Stakeholders get a limited budget to “buy” features, which reveals what they really value when they must choose.
Common practice 5 steps Used by Product Owner
What it is A prioritisation game: stakeholders get a limited budget of play money and “buy” features priced by their cost. Expensive features need people to pool money.
When to use it When several stakeholders all say their item is the top priority.
Why it works It forces trade-offs and reveals what people really value when they can't have everything. Pooling money creates useful discussion.
Do Keep budgets tight; generous budgets remove the trade-offs. Don't Treating the result as a vote that decides the order. Step by step Price the features Roughly by cost or effort.
Give each player a budget Enough for about a third of the features in total.
Let them buy Alone or by pooling money; they must explain pooled purchases.
Listen The conversations matter more than the result.
Use the result as input The accountable person still decides.
PreviewBuy a feature Prioritisation Stakeholders must make real trade-offs between features they all want. 5 Prioritisation · cheat sheet Dot voting Each person gets a few dots to place on the options they think matter most.
Common practice 5 steps Used by Product Owner, Scrum Master
What it is Everyone gets a few dots (for example 3) and places them on the options they prefer. The dots show the group's preferences quickly.
When to use it To narrow down many options quickly in a workshop.
Why it works It's fast, includes everyone, and turns a long discussion into a visible result in minutes.
Do Dot voting shows preference, not value; combine it with facts for big decisions. Don't Popular isn't always valuable. Letting the vote override the Product Owner's accountability. Step by step Make the options clear Each on its own card.
Give each person the same number of dots Usually about a third of the number of options.
Agree the rules Can people stack dots on one option?
Vote at the same time To reduce copying.
Discuss the result Especially close calls and options with no dots.
PreviewDot voting Prioritisation A group needs to see its preferences in minutes. 5 Prioritisation · cheat sheet Kano model Customers react differently to basics they expect, performance they value more of, and surprises that delight.
Common practice 5 steps Used by Product Owner, Process Improvement Specialist
What it is The Kano model sorts features by how they affect satisfaction: basics people expect (missing them causes anger), performance features (more is better) and delighters (unexpected pleasures).
When to use it When deciding which features customers expect versus which would set the product apart.
Why it works It shows that not all features are equal: basics must be there, but adding more of them doesn't please anyone, while a small delighter can stand out.
Do Ask real users; teams often misjudge what's basic. Don't Delighters become basics over time, so revisit the categories. Step by step List candidate features From research, requests and ideas.
Ask users two questions per feature How would you feel if it were there? And if it weren't?
Classify Basic, performance, delighter, indifferent.
Plan the mix All basics first, enough performance to compete, a few delighters.
Re-check over time Today's delighter becomes tomorrow's basic.
PreviewKano model Prioritisation You need to know which features users expect, value or love. 5 Prioritisation · cheat sheet MoSCoW Sort items for a release or goal into Must have, Should have, Could have and Won't have this time.
Common practice 6 steps Used by Product Owner, Project Manager
What it is A way to sort requirements into four groups: Must have, Should have, Could have and Won't have (this time). It forces honest choices about what really matters.
When to use it For a fixed date or release, to agree what is truly essential. Less useful for ordering a whole backlog one item at a time.
Why it works When everything is “high priority”, nothing is. MoSCoW makes trade-offs explicit and agreed, so that when time or money is short, everyone already knows what gives way.
Do Ask “what if we don't?” for every must. Won't doesn't mean never; date it or link it to a later stage. Don't Everything becomes a Must. Treating “Won't” as “never” instead of “not this time”. Step by step Agree what “must” means Must = without it, the result is useless, unsafe or illegal. Everything else is not a must.
List the requirements One per line, clear enough that people agree what each means.
Sort them together With the users and decision-makers. Challenge every must: “What happens if we don't have it?”
Check the balance A common rule: musts use no more than about 60% of the effort, so there is room to absorb surprises.
Record the won'ts Write down what is not included this time, and why. It prevents the same debate later.
Revisit at each stage Priorities change; re-sort when they do.
PreviewMoSCoW Prioritisation Everything is called a priority and time or money is fixed. 6 Prioritisation · cheat sheet Value vs effort Place items on a simple grid of how valuable they are against how much effort they take.
Common practice 5 steps Used by Product Owner, Project Manager
What it is A simple 2×2 grid: value on one axis, effort on the other. Items land in four boxes: quick wins (high value, low effort), big bets, fill-ins and time sinks.
When to use it As a first, fast sort of a messy backlog, and to explain ordering to stakeholders visually.
Why it works It makes trade-offs visible at a glance, so a group can agree what to do first without long debates.
Do Effort estimates should come from the people who'd do the work. Don't Forgetting dependencies: a quick win may need something else first. Letting the loudest stakeholder decide where “value” sits. Step by step List the options Features, improvements or ideas, one per card.
Agree what value means For example revenue, customer impact, risk reduced.
Score value and effort Rough is fine: low, medium, high.
Place them on the grid Discuss outliers.
Decide Quick wins first, plan big bets carefully, fit fill-ins where there's room, drop time sinks.
PreviewValue vs effort Prioritisation You must pick quickly among many options with limited capacity. 5 Prioritisation · cheat sheet WSJF and cost of delay Do first what loses the most value per week of waiting, divided by how long it takes.
Common practice 5 steps Used by Product Owner, Project Manager
What it is Weighted Shortest Job First: rank work by the cost of waiting divided by its size. Things that lose a lot of value by waiting, and are small, go first.
When to use it When several big items compete and waiting has a real cost, for example a competitor or a deadline.
Why it works It adds the cost of delay to prioritisation. A small, urgent item can be worth more now than a big valuable one later.
Do Use relative numbers (like 1, 2, 3, 5, 8, 13), not money, unless you really know it. Don't Fake precision: the scores are rough relative guesses. Using it for small items where a quick conversation is faster. Step by step Estimate the cost of delay Often as the sum of three relative scores: value to users, time criticality, and risk reduction or opportunity.
Estimate the size Relative size or duration.
Divide WSJF = cost of delay ÷ size.
Rank by the result Highest first.
Re-score regularly Time criticality changes, especially near deadlines.
PreviewWSJF and cost of delay Prioritisation Waiting costs differ between items and you must choose what goes first. 5 Problem-solving · cheat sheet Blameless review Look at what went wrong by asking how the system allowed it, not who to blame.
Common practice 6 steps Used by Scrum Master, Project Manager, Process Improvement Specialist, Product Owner
What it is A review of something that went wrong that focuses on how the system and process allowed it, not on who to blame.
When to use it After a failure, a shortcut that backfired, or an incident.
Why it works When people fear blame, they hide problems. Blameless reviews surface the real causes and lead to lasting fixes.
Do “Human error” is a starting point, not a conclusion. Don't Saying “blameless” but still naming a culprit. Step by step State the purpose Learning, not blaming.
Build a timeline What happened, in order, from all perspectives.
Ask how, not who How did the process allow this?
Find contributing causes Usually several.
Agree improvements With owners and dates.
Share the learning So others benefit.
PreviewBlameless review Problem-solving Something went wrong and you want to fix the process, not find a culprit. 6 Stakeholders · cheat sheet Saying no with reasons Turn a no into a clear, respectful “not now” or “not for this product”, backed by value and the goal.
Common practice 6 steps Used by Product Owner, Project Manager
What it is Turning down or deferring a request in a way that keeps the relationship: explaining the reason, the trade-off, and offering an alternative.
When to use it Every time a request doesn't fit the current goal or the vision.
Why it works Saying yes to everything breaks promises and priorities. A respectful no, with reasons and options, protects the work and keeps trust.
Do “No, and here's what I can do” works better than “no”. Don't A no without a reason. A yes to keep the peace that breaks the Sprint Goal. Step by step Listen and understand the need Ask why it matters to them.
Check it against goals and priorities Does it fit? What would it replace?
Explain the trade-off “If we do this, X moves later.”
Offer an alternative Later, smaller, different, or someone else.
Record it So it isn't lost and can come back.
Escalate if needed When it's not your decision.
PreviewSaying no with reasons Stakeholders A request would break priorities but the relationship matters. 6 Stakeholders · cheat sheet Stakeholder communication plan Decide who gets told what, how and how often, so nobody is surprised.
Common practice 6 steps Used by Product Owner, Project Manager
What it is A planned way of keeping each stakeholder group informed: what they need to know, in what format, how often and from whom. Often written as a communication plan.
When to use it Once you know your stakeholders, and whenever someone says they were surprised.
Why it works People who feel uninformed fill the gap with rumours or resistance. Regular, fitting updates build trust and reduce interruptions.
Do One clear message, repeated in several channels, beats many different messages. With n people there are n × (n − 1) ÷ 2 possible channels; plan which ones matter. Don't Status reports that replace looking at the real product. Step by step List the audiences From your stakeholder map.
Ask what each needs Decisions, progress, dates, impact on them.
Choose format and frequency A one-page email, a meeting, a newsletter, a dashboard.
Name a sender for each So it actually happens.
Include bad news early With what you're doing about it.
Check it's working Ask people if the updates help, and adjust.
PreviewStakeholder communication plan Stakeholders Different people need different information at different times. 6 Stakeholders · cheat sheet Stakeholder map (power and interest) Place each stakeholder by how much influence they have and how much they care, then engage each group differently.
Common practice 6 steps Used by Project Manager, Product Owner, Scrum Master, Process Improvement Specialist
What it is A stakeholder map places everyone affected by, or able to affect, your work on a simple grid: how much influence they have, and how interested they are.
The four boxes suggest how to involve each group: manage closely (high, high), keep satisfied (high influence, low interest), keep informed (low influence, high interest) and monitor (low, low).
When to use it At the start, and whenever new people appear or someone's interest changes.
Variations Engagement assessment compares how engaged each person is now with how engaged you need them to be.Salience model adds urgency and legitimacy to power.Why it works You can't give everyone the same attention. The map helps you spend your time where it matters, and makes sure nobody important is forgotten.
It also shows risks: a powerful person who isn't interested yet can suddenly block you.
Do Don't ignore end users just because they look low-influence; their reaction decides whether the result is used. Keep the map private if it contains frank views. Don't Making the map once and forgetting it. Ignoring end users because they look low-influence. Step by step Brainstorm everyone With the team, list people and groups who are affected or can affect the work: users, managers, finance, legal, suppliers, regulators, neighbours. Use checklists and past projects.
Rate influence and interest For each, ask: can they change or stop the work? How much do they care about it? Use high, medium, low.
Place them on the grid Draw the four boxes and write names in them. Discuss disagreements; they often reveal something important.
Decide how to engage each box Manage closely: regular personal contact. Keep satisfied: short updates on what matters to them. Keep informed: regular news. Monitor: light touch.
Turn it into actions Add owners and channels, often in a stakeholder register or communication plan.
Revisit it People move boxes. Update the map at each stage or when something changes.
PreviewStakeholder map (power and interest) Stakeholders You need to see who matters most and how to involve each. 6 Strategy and planning · cheat sheet Minimum viable product (MVP) The smallest version that lets real users get value and lets you learn whether you're right.
Common practice 5 steps Used by Product Owner
What it is A minimum viable product is the smallest version of something that lets you test whether it's worth building more, with real users.
When to use it Early, when the biggest risk is building something nobody wants.
Why it works It avoids spending months building something nobody wants. Learning early is cheaper than learning late.
Do Minimum doesn't mean poor quality; it means small scope. Don't A “minimum” product so poor that it teaches nothing. Never measuring after releasing. Step by step Write the key assumption What must be true for this to succeed?
Design the smallest test What could prove or disprove it quickly?
Build only that Leave out everything not needed for the test.
Put it in front of real users Measure what they do, not just what they say.
Decide Build more, change direction, or stop.
PreviewMinimum viable product (MVP) Strategy and planning You want to test if an idea is worth building before investing more. 5 Strategy and planning · cheat sheet OKRs An inspiring objective plus a few measurable key results that show whether you reached it.
Common practice 5 steps Used by Product Owner
What it is Objectives and Key Results: an objective is a qualitative goal; key results are 2 to 4 measurable outcomes that show whether you got there.
When to use it To connect product goals to measurable outcomes the company cares about, usually per quarter.
Why it works They connect daily work to outcomes, and make progress measurable without dictating how to achieve it.
Do “Launch the app” is a task, not a key result. Ask what launching should change. Don't Key results that are task lists (“build ratings”). Too many OKRs. Step by step Write an inspiring objective Qualitative, clear, time-bound.
Add 2 to 4 key results Measurable outcomes, not tasks.
Set ambitious but honest targets Teams often aim for about 70% achievement.
Review progress regularly Weekly or monthly check-ins.
Score and learn at the end What worked, what to change.
PreviewOKRs Strategy and planning You want work tied to measurable outcomes rather than task lists. 5 Strategy and planning · cheat sheet Product roadmap (now, next, later) A visual forecast of where the product is heading, shown as goals and outcomes over time, not a list of dates.
Common practice 5 steps Used by Product Owner, Project Manager
What it is A roadmap shows, at a high level, the direction and the main steps over time: what's planned now, next and later, and why. It's a communication tool, not a detailed plan.
When to use it To align stakeholders on direction and sequence. Not in the Scrum Guide; it sits between the vision and the Product Backlog.
Variations Timeline roadmap uses dates or quarters, common for projects with fixed milestones.Outcome roadmap lists outcomes instead of features.Why it works It aligns people on direction and order without promising exact dates far ahead, which are rarely accurate.
Do Avoid exact dates for the “later” column. Don't Feature-and-date roadmaps that become promises. Roadmaps nobody updates. Confusing the roadmap with the Product Backlog. Step by step Start from goals or outcomes What do we want to achieve?
Group work into themes Not individual tasks.
Arrange in time horizons Now (committed), next (likely), later (ideas).
Show confidence honestly Near items are firm; far items are directional.
Share and review Update it regularly as you learn.
PreviewProduct roadmap (now, next, later) Strategy and planning Leaders need the direction and order on one page, without exact dates. 5 Strategy and planning · cheat sheet Product vision and elevator pitch One short, memorable direction for the product: who it's for, what it does for them, why it's different.
Common practice 6 steps Used by Product Owner
What it is A short statement of the future a product or project aims to create: for whom, what problem it solves, and why it's better than the alternatives.
When to use it At the start, and whenever people pull the product in different directions.
Why it works It gives everyone a shared direction, helps make trade-offs, and lets people say no to things that don't fit.
Do If nobody can repeat the vision from memory, it's too long. Don't Vague slogans that decide nothing. A vision nobody outside the product team knows. Step by step Name the target group Who is it for?
Name the need What problem or opportunity?
Describe the outcome What changes for them?
Say what makes it different Why this, not the alternatives?
Make it short One or two sentences people can remember.
Use it Refer to it when deciding priorities.
PreviewProduct vision and elevator pitch Strategy and planning People pull in different directions and need a shared aim. 6 Strategy and planning · cheat sheet Release planning Decide what makes a release valuable enough to ship, and forecast roughly when it can happen.
Common practice 5 steps Used by Product Owner
What it is Deciding which features or results go out in which release, and roughly when, based on value, capacity and dependencies.
When to use it When the business needs to plan launches, marketing or support. Scrum itself allows releasing any time an Increment is valuable.
Why it works It sets expectations for stakeholders and helps the team focus on a usable whole rather than scattered pieces.
Do Release goals beat feature lists: they let you swap items without breaking the promise. Don't Waiting for “everything” before releasing. Treating the forecast as a fixed promise. Step by step Set the release goal What should users be able to do after it?
Pick the items that serve the goal In order of value.
Check capacity Use the team's pace or throughput.
Check dependencies Other teams, suppliers, approvals.
Set a target with a range Update as work progresses.
PreviewRelease planning Strategy and planning Stakeholders need to know what's coming in which release, roughly when. 5 Team development · cheat sheet Delegation levels Make clear, decision by decision, how much the team decides itself and how much a leader decides.
Common practice 5 steps Used by Scrum Master, Project Manager, Product Owner
What it is A scale for how much a team or person decides on their own, from “I decide” to “you decide”, agreed per type of decision.
When to use it When managers and teams keep stepping on each other's decisions, or as a team grows more self-managing.
Why it works Unclear delegation causes either micro-management or surprises. Agreeing levels per decision builds trust and speed.
Do Delegation without the information to decide well isn't delegation. Don't Delegating a decision, then taking it back. Step by step List recurring decisions Tools, budget, hiring, priorities, working hours.
Use a scale For example: tell, sell, consult, agree, advise, inquire, delegate.
Agree a level per decision Together.
Make it visible A simple table.
Move levels as trust grows Review every few months.
PreviewDelegation levels Team development It's unclear how much a team or person may decide alone. 5