Executing · document brief

Quality inspection checklist

A checklist used to inspect a deliverable against its requirements, recording each result and every defect that needs fixing.

4 sections
Used by Project Manager
Pre-projectInitiatingPlanningExecutingMonitoringClosing

Use it when

a deliverable must be inspected against its requirements.

Why it matters

It makes inspections consistent and complete, and gives a record of what was checked, what failed and when it was fixed.

Written by

The quality lead or inspector

Approved by

Signed by the inspector and the party responsible for fixes

When it appears

At each planned inspection point during executing, and before acceptance.

What goes inside

  1. Inspection details What, where, when, who.
  2. Checks Each requirement and its result.
  3. Defects What must be fixed, by whom and when.
  4. Sign-off Inspector and supplier.

Watch out for

  • Checks without a clear requirement to check against.
  • Defects recorded but never re-checked.
  • Inspecting only at the very end.

How this document fits

NeedsScope statementDesign and specificationsWork package
This documentQuality inspection checklistMade with
FeedsDefect fixesAcceptanceLessons log
Where you will meet this: Inspection checklist · quality control checklist · defect (snag) listPrint the example ↗Print the blank ↗

The document

Day in the RoleQuality inspection checklistChecked against the requirements
Version1.0
Date15 March
DeliverableVentilation, treatment rooms 1 to 8
LocationRiverside clinic, ground floor
DateWeek 18
InspectorAntonia (Compliance Lead)

Checks

CheckAgainst (requirement)PassFailNotes
Duct size matches design, rooms 1–3Design drawing M-04 rev C✓
Duct size matches design, rooms 4–6Design drawing M-04 rev C✓Undersized: rev B used
Duct size matches design, rooms 7–8Design drawing M-04 rev C✓
Air changes per hourAt least 6 per hour✓Measured 7
Filters fitted and labelledInfection-control spec 3.2✓
Access panels for cleaningOne per room✓

Defects to fix

DefectOwnerFix byRe-checked
Replace ducts, rooms 4–6Arash (Contractor)Week 19
Confirm all trades have drawing rev CArash (Contractor)Week 18✓
Pass: acceptedPass with minor defectsFail: fix and re-inspect
Inspector
Signature
Date
Supplier
Signature
Date
Day in the Role · Quality inspection checklistIllustrative example · not a real project or organisation · dayintherole.com
Day in the RoleQuality inspection checklistChecked against the requirements
Version
Date
Deliverable
Location
Date
Inspector

Checks

CheckAgainst (requirement)PassFailNotes

Defects to fix

DefectOwnerFix byRe-checked
Pass: acceptedPass with minor defectsFail: fix and re-inspect
Inspector
Signature
Date
Supplier
Signature
Date
Day in the Role · Quality inspection checklistTemplate · free to use and adapt · dayintherole.com

Illustrative example in our own words: not a real project or organisation.