Executing · document brief Work package The agreement that hands a piece of work to a team or supplier: what to deliver, how it will be accepted, by when, within what limits, and how to report.
7 sections Used by Project Manager
Pre-project Initiating Planning Executing Monitoring Closing
Use it when a piece of work is handed to a team or supplier.
Why it matters It makes ownership clear and gives the project manager and the team the same picture of what done looks like.
Written by The project manager, agreed with the team lead or supplier
Approved by Accepted by the team lead or supplier who takes it on
When it appears During executing, each time a piece of work starts. Closed when the work is accepted.
What goes inside Work package Code, name and the person who owns it.
What to deliver The deliverables and what's included.
Acceptance How the result will be checked.
Dates and effort Start, finish and estimate.
Tolerances How far time and cost may move before escalating.
Reporting How and how often progress is reported.
Agreed Both sides.
Watch out for No acceptance criteria. Tolerances missing, so every small slip is escalated or none are. Handing work over verbally. How this document fits
This document Work package Made with
What the letters mean
HR Human resources
PMI Project Management Institute
PRINCE2 Projects in Controlled Environments: a project management method
WBS Work breakdown structure
± Plus or minus: the allowed range either side
The document Filled-in example Blank template
Day in the Role Work package Work order: one piece of work, handed over
Work package 4.1
Name Hiring
Handed to Adaugo (HR and Training Lead)
Handed over by Annelise (Project Manager)
What to deliver 3 doctors 6 nurses 2 healthcare assistants 1 reception lead Accepted when Contracts signed, checks complete, start dates agreed before week 23.
Start Week 11
Finish Week 22
Effort About 40 days of HR time
Tolerances Inside these limits the owner decides; beyond them, escalate before acting.
Constraints Offers sent within 48 hours of the final interview.
Reporting Short update every Monday; escalate at once if two weeks behind or a key role can't be filled.
✂ Closing stub Accepted on
Checked by
Closed
Day in the Role Work package Work order: one piece of work, handed over
Tolerances Inside these limits the owner decides; beyond them, escalate before acting.
✂ Closing stub Accepted on
Checked by
Closed
Illustrative example in our own words: not a real project or organisation.