Day in the RoleQuality inspection checklistChecked against the requirements
Deliverable
Location
Date
Inspector
Checks
| Check | Against (requirement) | Pass | Fail | Notes |
|---|
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
Defects to fix
| Defect | Owner | Fix by | Re-checked |
|---|
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
Pass: acceptedPass with minor defectsFail: fix and re-inspect