Process improvement · document briefRoot cause verification
A table of every suspected cause, how it was tested, the evidence and the result: proven, likely, or ruled out.
2 sections
Used by Process Improvement Specialist
Process improvement
Use it when
the causes of a problem must be shown to be proven before choosing solutions.
Why it matters
It shows the sponsor exactly which causes are proven with data before any solution is chosen, and keeps ruled-out causes from coming back.
Written by
The project leader
Approved by
Accepted at the Analyse phase review
When it appears
Built through the Analyse phase, finished for the Analyse review.
What goes inside
Causes One row per suspected cause.
How the causes link Any circles or chains between causes.
Watch out for
- Calling a cause proven on opinion.
- Leaving ruled-out causes off the list.
- No mechanism behind a statistical link.
How this document fits
This documentRoot cause verificationMade with
The document
Day in the RoleRoot cause verificationWhich causes are proven, and how
Result: proven (data shows it drives the result, with a clear mechanism) · likely (strong signs, not yet tested) · ruled out (data shows it doesn't).
| Suspected cause | How tested | Evidence | Result |
|---|
| Only today's slots released, at 8 am | 5 whys; booking data | 38% of first requests told to call back; 2.1 days added | Proven |
| Two doctor sessions lost from week 12 | Two-sample t-test; Mann-Whitney | Weekly median wait +3.3 days; p below 0.0001 | Proven |
| Monday demand meets flat capacity | ANOVA; Kruskal-Wallis; Mood's median; Friedman | Monday 15.9 days against 6.4 to 10.2; worst every week | Proven |
| No reminders for phone bookings | Two-proportion test; chi-square | Missed 19.0% without against 8.1% with; missed rises with wait | Proven (pilot to confirm) |
| Urgent cases use routine slots | FMEA | Highest risk score (252); not yet measured | Likely: measure in Improve |
| Some doctors are slower | Multi-vari | Doctor averages within 1.3 days | Ruled out |
How the causes link
Long waits lead to more missed appointments (6% to 29%), which waste slots and make waits longer.
Day in the RoleRoot cause verificationWhich causes are proven, and how
Result: proven (data shows it drives the result, with a clear mechanism) · likely (strong signs, not yet tested) · ruled out (data shows it doesn't).
| Suspected cause | How tested | Evidence | Result |
|---|
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
Illustrative example in our own words: not a real project or organisation.