Process improvement · document brief

Improvement storyboard

The whole improvement project told on one or two pages: problem and goal, baseline, root causes with evidence, solutions and pilot results, controls, confirmed benefits and lessons.

6 sections
Used by Process Improvement Specialist
Process improvement

Use it when

an improvement project closes and its story must be told on one page.

Why it matters

It closes the project, lets others learn from it and copy what fits, and is what a project review looks for.

Written by

The project leader

Approved by

The sponsor, at the closing review

When it appears

At the end of Control, for the closing review; started early and filled in phase by phase.

What goes inside

  1. Define Problem, goal, scope, customer needs.
  2. Measure Baseline and capability.
  3. Analyse Proven root causes and evidence.
  4. Improve Solutions and pilot results.
  5. Control Controls, handover, confirmed benefits.
  6. Lessons and next steps

Watch out for

  • Written only at the end, from memory.
  • All charts, no story.
  • No lessons or next steps.

How this document fits

Where you will meet this: Final project report · A3 report · project storyboardPrint the example ↗Print the blank ↗

The document

Day in the RoleImprovement storyboardThe whole project on one page
Version1.0
Date15 March
ProjectRoutine appointment access at the Riverside Health Centre
TeamAmara (lead), Astrid, Alma, Ayumi, Arjun · sponsor Atticus · owner Aurelie · mentor Augustin

Define

Patients waited a median of 10 days for a routine appointment; 1 in 4 over 14. Goal: median 5 days or less, 90% within 7 days, in five months.

Measure

Swimlane map and value stream (19 minutes of work in 10.4 days). Measurement checked: attribute agreement 95%, gauge 13.8%. Baseline: 55% over 7 days, sigma level 1.4.

Analyse

Proven: same-day slot release (call-back loop), two lost doctor sessions since week 12 (+3.3 days), Monday demand on flat capacity, no reminders for phone bookings (missed 19% against 8%). Urgent use of routine slots confirmed by regression.

Improve

Book up to 2 weeks ahead, reminders for every booking, protected urgent slots with a system lock, two extra Monday sessions, cover for lost sessions. Pilot: median 4 days, 88% within 7, missed 8.5%.

Control

Control plan with six charted measures and a response plan, owned by Aurelie. After roll-out: 91% within 7 days, median 4. Benefits €36,705 a year, confirmed by finance; payback about 9 months.

Before and after

MeasureBefore
Median wait10 days
Within 7 days45%
Missed15.7%
Sigma level1.4
MeasureAfter
Median wait4 days
Within 7 days91%
Missed8.3%
Sigma levelabout 2.8

Lessons

  • Check the measurement before trusting the data
  • Front-line staff found most of the causes
  • Small drifts need CUSUM or EWMA, not just standard charts

Next steps

Next project from the opportunity log: telling patients when their test results are back.

Project leader
Signature
Date
Sponsor
Signature
Date
Day in the Role · Improvement storyboardIllustrative example · not a real project or organisation · dayintherole.com
Day in the RoleImprovement storyboardThe whole project on one page
Version
Date
Project
Team

Define

Measure

Analyse

Improve

Control

Before and after

MeasureBefore
MeasureAfter

Lessons

Next steps

Project leader
Signature
Date
Sponsor
Signature
Date
Day in the Role · Improvement storyboardTemplate · free to use and adapt · dayintherole.com

Illustrative example in our own words: not a real project or organisation.