The whole improvement project told on one or two pages: problem and goal, baseline, root causes with evidence, solutions and pilot results, controls, confirmed benefits and lessons.
6 sections Used by Process Improvement Specialist
Process improvement
Use it when
an improvement project closes and its story must be told on one page.
Why it matters
It closes the project, lets others learn from it and copy what fits, and is what a project review looks for.
Written by
The project leader
Approved by
The sponsor, at the closing review
When it appears
At the end of Control, for the closing review; started early and filled in phase by phase.
Patients waited a median of 10 days for a routine appointment; 1 in 4 over 14. Goal: median 5 days or less, 90% within 7 days, in five months.
Measure
Swimlane map and value stream (19 minutes of work in 10.4 days). Measurement checked: attribute agreement 95%, gauge 13.8%. Baseline: 55% over 7 days, sigma level 1.4.
Analyse
Proven: same-day slot release (call-back loop), two lost doctor sessions since week 12 (+3.3 days), Monday demand on flat capacity, no reminders for phone bookings (missed 19% against 8%). Urgent use of routine slots confirmed by regression.
Improve
Book up to 2 weeks ahead, reminders for every booking, protected urgent slots with a system lock, two extra Monday sessions, cover for lost sessions. Pilot: median 4 days, 88% within 7, missed 8.5%.
Control
Control plan with six charted measures and a response plan, owned by Aurelie. After roll-out: 91% within 7 days, median 4. Benefits €36,705 a year, confirmed by finance; payback about 9 months.
Before and after
Measure
Before
Median wait
10 days
Within 7 days
45%
Missed
15.7%
Sigma level
1.4
Measure
After
Median wait
4 days
Within 7 days
91%
Missed
8.3%
Sigma level
about 2.8
Lessons
Check the measurement before trusting the data
Front-line staff found most of the causes
Small drifts need CUSUM or EWMA, not just standard charts
Next steps
Next project from the opportunity log: telling patients when their test results are back.
Project leader
Signature
Date
Sponsor
Signature
Date
Day in the Role · Improvement storyboardIllustrative example · not a real project or organisation · dayintherole.com
Day in the RoleImprovement storyboardThe whole project on one page
Version
Date
Project
Team
Define
Measure
Analyse
Improve
Control
Before and after
Measure
Before
Measure
After
Lessons
Next steps
Project leader
Signature
Date
Sponsor
Signature
Date
Day in the Role · Improvement storyboardTemplate · free to use and adapt · dayintherole.com
Illustrative example in our own words: not a real project or organisation.