Monitoring and controlling · document brief

Document and drawing register

The single list of current versions of key documents and drawings, with status, issue date and who has confirmed they use it.

1 sections
Used by Project Manager
Pre-projectInitiatingPlanningExecutingMonitoringClosing

Use it when

drawings or documents change and people must use the latest version.

Why it matters

It stops people working from old versions, which causes rework and defects.

Written by

The project coordinator or document controller

Approved by

Changes approved through change control

When it appears

From design to handover.

What goes inside

  1. Register Item, version, status, issued, reason, confirmed by.

Watch out for

  • Versions emailed around outside the register.
  • Old copies left on site.

How this document fits

NeedsApproved changesDesign updates
This documentDocument and drawing registerMade with
FeedsSite meetingsHandover documents
Where you will meet this: Configuration register · document control registerPrint the example ↗Print the blank ↗

The document

Day in the RoleDocument and drawing registerOne register of current versions
Version1.0
Date15 March
Document or drawingVersionStatusIssuedChanged becauseConfirmed by
Floor planv8ApprovedWeek 22Walls moved (CR-07)All trades
Floor planv6WithdrawnWeek 14Superseded
Ventilation layoutrev DApprovedWeek 22Walls movedContractor, ventilation
Electrical layoutrev FApprovedWeek 23Sockets movedElectricians
Booking system settings1.4ApprovedWeek 25One-click follow-upVendor, IT

Status: draft · approved · withdrawn. Withdrawn versions are removed from site and shared folders.

Day in the Role · Document and drawing registerIllustrative example · not a real project or organisation · dayintherole.com
Day in the RoleDocument and drawing registerOne register of current versions
Version
Date
Document or drawingVersionStatusIssuedChanged becauseConfirmed by

Status: draft · approved · withdrawn. Withdrawn versions are removed from site and shared folders.

Day in the Role · Document and drawing registerTemplate · free to use and adapt · dayintherole.com

Illustrative example in our own words: not a real project or organisation.

See it in the story