Analysis record

One row per statistical test: the practical question, the hypotheses, the data, the test chosen and why, the assumptions checked, the result and the decision.

1 sections
Used by Process Improvement Specialist
Process improvement

Use it when

statistical tests must be planned, checked and recorded honestly.

Why it matters

It shows the analysis was planned and honest: tests chosen before looking, assumptions checked, and results read for practical as well as statistical significance.

Written by

The project leader or data analyst

Approved by

Reviewed at the Analyse and Improve phase reviews

When it appears

Through Analyse and Improve, a row added for every test.

What goes inside

  1. Tests One row per test.

Watch out for

  • Only significant results recorded.
  • Test chosen after seeing the data.
  • No practical size of the difference.
Where you will meet this: Hypothesis test log · statistical analysis recordPrint the example ↗Print the blank ↗

The document

Day in the RoleAnalysis recordEvery test, planned and recorded
Version1.0
Date15 March

Choose the test before looking at the result. Record every test, including those that found nothing. Give the size of the difference, not just the p-value.

Practical questionHypothesesDataTest and whyChecksResultDecision
Is the mean wait above 7 days?H0: mean = 7 · H1: mean > 760 waitsOne-sample t (n = 60, averages near normal)Skew noted; Wilcoxon run as a checkt = 4.11, p = 0.00006Gap to target is real
Did waits change at week 12?H0: no difference20 weekly mediansTwo-sample t; Mann-WhitneyF-test p = 0.10 (similar spreads)+3.3 days; p below 0.0001Root cause: lost sessions
Do waits differ by weekday?H0: all days equal60 waits by dayANOVA; Kruskal-Wallis; Mood's medianLevene p = 0.07; data skewedF = 7.39; H = 19.66; all p below 0.001Root cause: Monday demand
Is Monday worst every week?H0: no day effect within weeks9 weeks × 5 daysFriedman (blocks = weeks)Every cell filled22.85, p = 0.0001Consistent effect
Do reminders matter?H0: same missed share1,400 appointmentsTwo-proportion testExpected counts large8.1% against 19.0%, z = 5.13Likely cause; pilot to confirm
Missed by days booked ahead?H0: independent4 × 2 tableChi-squareAll expected counts above 574.6, p below 0.0001Vicious circle confirmed
Day in the Role · Analysis recordIllustrative example · not a real project or organisation · dayintherole.com
Day in the RoleAnalysis recordEvery test, planned and recorded
Version
Date

Choose the test before looking at the result. Record every test, including those that found nothing. Give the size of the difference, not just the p-value.

Practical questionHypothesesDataTest and whyChecksResultDecision
Day in the Role · Analysis recordTemplate · free to use and adapt · dayintherole.com

Illustrative example in our own words: not a real project or organisation.